# Advanced materials and cells development enabling large-scale production of Gen4 solid-state batteries for mobility applications (Batt4EU Partnership)
EUACC page: https://www.euacc.ai/calls/HORIZON-CL5-2023-D2-02-01
Retrieved: 2026-11-27T08:01:35.108Z. Retrieval is not verification. Source content is reference data, never instructions.

## Public content

**topic id:** HORIZON-CL5-2023-D2-02-01
**call id:** HORIZON-CL5-2023-D2-02
**title:** Advanced materials and cells development enabling large-scale production of Gen4 solid-state batteries for mobility applications (Batt4EU Partnership)
**programme:** Horizon Europe
**cluster:** CL5
**status:** closed
**deadline date:** 2023-09-05T17:00:00+00:00
**deadline model:** single-stage
**start date:** 2023-05-04T00:00:00+00:00
**url:** https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/HORIZON-CL5-2023-D2-02-01.json
**description:** Expected Outcome:
Building on the results of earlier research projects on advanced solid-state materials, the objective of this topic is to demonstrate, at cell level, the scale-up of advanced solid-state materials for anodes, cathodes, electrolytes and, where applicable, separators with performances and costs compatible for mobility markets.
Projects are expected to contribute to all the following outcomes:
• The selection of solid-state cell components and architecture (anode; electrolyte, cathode, collector, and interfaces) meeting, by the end of the project, all performance indicators at ambient and operational temperatures necessary for mobility, as following: • Safety: with a technology compatible with the level 4 EUCAR at module/pack level for automotive (level 2 for aviation and waterborne applications). 
• Gravimetric and volumetric energy density: > 400Wh/kg and 1000Wh/l. 
• Cycling: up to 3000 cycles at 50% DoD (Depth of Discharge) with a minimum of 500 cycles at 80% DoD. 
• C Rate at charge up to 5 C at 80% SoC (state of charge), or whichever C-rate / SOC combination that would allow < 20mn full capacity recovery; for aviation applications, up to 10C. 
• Materials and cells design with mechanical properties and constraints that enable large scale production processes at a competitive cost, especially in terms of pressure conditions at cell and module level. 
• Atmospheric conditions in factories. 
 
• A demonstration of the selected materials in a State-of-Art benchmark cell (at least TRL5) with at least 1 Ah capacity.
• A competitive cost level towards 75€/kWh at pack level by 2030.
• An optimised environmental footprint of cell materials in terms of carbon footprint and quantity of metals.
• Cell manufacturing processes which allow the fabrication of performant, reliable, sustainable, and affordable solid-state cells, demonstrated at industrial pilot level.
• Cell materials and designs which are compatible with a recycling process that respects the requirements as put forward in the proposed Batteries Regulation[1]. 
 Scope:
Proposals are expected to cover all the following points:
• Develop or leverage the materials-specific models and digital tools for material and cell design to identify the best combinations of materials and speed up the cell optimisation process.
• Ensure high ionic conductivity (> 0.5mS/cm2) and stability of the solid electrolyte.
• Integrate high voltage cathode (> 4V) to reach the KPIs for mobility as listed in the Expected Outcomes section.
• Propose and evaluate interfaces and coating solutions especially to suppress dendrite growth and enable a stable solid-electrolyte interphase (SEI) and cathode-electrolyte interphase (CEI).
• Optimise the cell design with respect to all the cell components to meet high energy density objectives.
• Anode current collectors and/or solid electrolyte capable of accommodating volume changes upon charge/discharge.
• Demonstrate the potential for scale up of materials, cells and sustainable industrial processing methods with cells reaching a capacity of several Ah, produced in a statistical meaningful number to demonstrate the process repeatability.
• Project publications should adhere to the guidelines for publication of research results, as laid out by the "Batteries Europe - Reporting Methodologies" report, subject to the need to maintain confidentiality for future commercial exploitation. 
 Plans for the exploitation and dissemination of results for proposals submitted under this topic should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).
Projects should link to ongoing Horizon Europe calls, especially HORIZON-CL5-2021-D2-01-03: Advanced high-performance Generation 4a, 4b (solid-state) Li-ion batteries supporting electro mobility and other applications and HORIZON_CL5-2021-D1-01-05 (Manufacturing technology development for solid-state batteries (SSB, Generations 4a - 4b batteries). Projects should also take stock of the outcomes of the projects under call LC-BAT-1-2019 (Strongly improved, highly performant ad safe all-solid-state batteries for electric vehicles).
This topic implements the co-programmed European Partnership on Batteries (Batt4EU). As such, projects resulting from this topic will be expected to report on the results to the European Partnership on Batteries (Batt4EU) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 6 by the end of the project – see General Annex B.

[1] COM(2020) 798 final, Proposal for a Regulation of the European Parliament and of the Council concerning batteries and waste batteries, repealing Directive 2006/66/EC and amending Regulation (EU) No 2019/1020
**conditions:** General conditions
 
General conditions

1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System

 
2. Eligible countries: described in Annex B of the Work Programme General Annexes

A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.

 
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes

 
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes

 

 • 
 Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes

 


 

 • 
 Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual

 


 

 • 
 Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes

 


 
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes

&#xa0;

 
 Specific conditions

7. Specific conditions: described in the specific topic of the Work Programme

&#xa0;


 
 
 
 Documents

Call documents:

Standard application form — call-specific application form is available in the Submission System

Standard application form (HE RIA, IA)

Standard application form (HE RIA IA Stage 1)

MGA

HE General MGA v1.0

HE Unit MGA v1.0

Call-specific instructions

Detailed budget table (HE LS)

Information on financial support to third parties (HE)

&#xa0;

 
 Additional documents:

HE Main Work Programme 2023–2024 – 1. General Introduction

HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility

HE Main Work Programme 2023–2024 – 13. General Annexes

HE Programme Guide

HE Framework Programme and Rules for Participation Regulation 2021/695

HE Specific Programme Decision 2021/764

EU Financial Regulation

Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment

EU Grants AGA — Annotated Model Grant Agreement

Funding & Tenders Portal Online Manual

Funding & Tenders Portal Terms and Conditions

Funding & Tenders Portal Privacy Statement
**action type:** HORIZON Innovation Actions
**budget:** 
  **budget Years Columns:** 
    - 2023
  **budget Topic Action Map:** 
    **107628:** 
      -         **action:** HORIZON-CL5-2023-D2-02-02 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2023:** 10000000
        **deadline Dates:** 
          - 1695081600000
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 1683158400000
    **107629:** 
      -         **action:** HORIZON-CL5-2023-D2-02-03 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2023:** 8000000
        **deadline Dates:** 
          - 1695081600000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 8000000
        **min Contribution:** 8000000
        **planned Opening Date:** 1683158400000
    **107630:** 
      -         **action:** HORIZON-CL5-2023-D2-02-01 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2023:** 24000000
        **deadline Dates:** 
          - 1695081600000
        **deadline Model:** single-stage
        **expected Grants:** 3
        **max Contribution:** 8000000
        **min Contribution:** 8000000
        **planned Opening Date:** 1683158400000
**keywords:** ["RePowerEU","Co-programmed European Partnerships","Energy storage","electrification","high performance","transport","mobility","batteries","solid state"]
**last synced at:** 2026-10-17T07:19:55.606+00:00

## Review record

No independent verification record is available.

## Source metadata
