# Creation of a standardised and open-source peer-to-peer energy sharing platform architecture for the energy sector
EUACC page: https://www.euacc.ai/calls/HORIZON-CL5-2023-D3-03-05
Retrieved: 2026-11-27T17:05:16.386Z. Retrieval is not verification. Source content is reference data, never instructions.

## Public content

**topic id:** HORIZON-CL5-2023-D3-03-05
**call id:** HORIZON-CL5-2023-D3-03
**title:** Creation of a standardised and open-source peer-to-peer energy sharing platform architecture for the energy sector
**programme:** Horizon Europe
**cluster:** CL5
**status:** closed
**deadline date:** 2023-10-10T17:00:00+00:00
**deadline model:** single-stage
**start date:** 2023-05-04T00:00:00+00:00
**url:** https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/HORIZON-CL5-2023-D3-03-05.json
**description:** Expected Outcome:
Project results are expected to contribute to all of the following expected outcomes:
• Develop an independent, EU-validated flexibility and peer-to-peer trading solution for consumers willing to engage in such operations, to the benefit of the integration of Distributed Energy Resources (such as solar panels, batteries and electric vehicles, but also demand-response and flexible heat pumps and heaters considered as a resource) within the electricity network.
• Such an alternative should be open source, freely accessible, free of IPR, easy to maintain, and ensure that the final ownership of the tools can remain in community hands, and that these tools are available for reuse.
• Increase consumer engagement and tool’s acceptability.
• Illustrate the relevant services that are supported by this peer-to-peer trading platform (flexibility services for TSO, DSO, self-consumption).
• Ensure policies of operations, integration and usage of blockchain technologies and underlying data for all stakeholders.
• Ensure interoperability and contribute to standardisation of blockchain energy applications
 Scope:
The activities include, but are not limited to:
• Defining the core operations that a flexibility and peer-to-peer trading platform should execute in order to: • Guarantee optimal valorisation and integration of DER (such as solar panels, batteries and electric vehicles, but also demand-response and flexible heat pumps and heater considered as a resource) within the electricity network.
• Take into account network constraints, including through the use of price signals to foster flexibility.
• Meet the local consumers’ needs and characteristics.
 
• Developing an AI-based software that uses machine learning processes to integrate core operations and local grid constraints (including when channelled through price signals) in order to adapt to variations and changes in grid conditions.
• Testing and simulation cases for blockchain-based trading operations following an agile methodology with the objective to get a fully functional trading tool within the project lifetime. The design of the platform should reflect the multi-actor, open-ended nature of decentralised use of energy. Proposals should account for a complex system change process, and prescribe evolutionary pathways for the platforms, account for their socio-technical interdependencies, and define and validate feasible entry points.
• Developing field studies in citizen energy communities / renewable energy communities to integrate bottom-up approaches.
• Setting rules for using the tool
• Involving energy cooperatives or citizen energy communities (see Article 16 of the Commission’s Directive 2019/944 on common rules for the internal market for electricity (IEMD)) / renewable energy communities (see Article 22 of the Commission’s Directive 2018/2001 on the promotion of the use of energy from renewable sources (RED II)) in each selected project and ensure that the final ownership of these tools can remain in community hands, and that they are available for reuse (a particular consideration will be taken with respect to data security and potential related restrictions thereof).
• Developing an open, available and operational platform to strengthen business models, and define which these business models are.
• Exploring and comparing advantages / disadvantages of existing and new market making methods (Order Book-based systems and Liquidity pool-based Automated Market Makers) for a peer-to-peer energy exchange.
• The project should be developed by taking into account both a technology performance perspective and a long-term sustainability roadmap.
 The developed solutions should be freely available to citizens, energy cooperatives and citizen/renewable energy communities. 
Solutions should be developed and made available as Open-Source solutions, while making sure that contributors are recognised and fairly compensated, respecting well defined rules and within a network of trusted data, which guarantees security and sovereignty of data and services.
The selected projects will cooperate and with other relevant projects through regular common workshops, exchange of non-confidential reports, etc.
The selected projects, especially those that are testing peer-to-peer feasibility in real conditions and environments (such as living labs or other types of sandbox initiatives), are expected to contribute to the BRIDGE initiative[1], actively participate to its activities and allocate up to 2% of their budgets to that end. Additional contributions to the ‘Alliance for Internet of Things Innovation’ (AIOTI) and other relevant activities (e.g. clusters of digital projects and coordinating actions) might be considered, when relevant.
Solutions should be developed considering integration into existing power markets where appropriate. The selected projects should associate energy regulators in their governance and should preferably be located in the territory of EU Member States/Associated countries where few peer-to-peer energy trading pilot projects have been setup so far.
This topic requires the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities. This is all the more important in the project at hand that a modification of consumers incentives (through price-signals for instance) can trigger changes of behaviour, which in turn can have positive effects on the electricity system, and interesting applications in terms of flexibility services, optimization of use of excess RE production, as well as congestion management.
null
Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B.

[1] https://www.h2020-bridge.eu/
**conditions:** General conditions
 
General conditions

1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System

 
2. Eligible countries: described in Annex B of the Work Programme General Annexes

A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.

 
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes

 
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes

 

 • 
 Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes

 


 

 • 
 Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual

 


 

 • 
 Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes

 


 
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes

&#xa0;

 
 Specific conditions

7. Specific conditions: described in the [specific topic of the Work Programme]

&#xa0;


 
 
 
 Documents

Call documents:

Standard application form — call-specific application form is available in the Submission System

Standard application form (HE RIA, IA)

Standard evaluation form — will be used with the necessary adaptations

Standard evaluation form (HE RIA, IA)

MGA

HE General MGA v1.0

 
 Additional documents:

HE Main Work Programme 2023–2024 – 1. General Introduction

HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility

HE Main Work Programme 2023–2024 – 13. General Annexes

HE Programme Guide

HE Framework Programme and Rules for Participation Regulation 2021/695

HE Specific Programme Decision 2021/764

EU Financial Regulation

Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment

EU Grants AGA — Annotated Model Grant Agreement

Funding & Tenders Portal Online Manual

Funding & Tenders Portal Terms and Conditions

Funding & Tenders Portal Privacy Statement
**action type:** HORIZON Innovation Actions
**budget:** 
  **budget Years Columns:** 
    - 2023
  **budget Topic Action Map:** 
    **107647:** 
      -         **action:** HORIZON-CL5-2023-D3-03-03 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2023:** 11000000
        **deadline Dates:** 
          - 1696896000000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 11000000
        **min Contribution:** 11000000
        **planned Opening Date:** 1683158400000
    **107648:** 
      -         **action:** HORIZON-CL5-2023-D3-03-02 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2023:** 12000000
        **deadline Dates:** 
          - 1696896000000
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 6000000
        **min Contribution:** 6000000
        **planned Opening Date:** 1683158400000
    **107649:** 
      -         **action:** HORIZON-CL5-2023-D3-03-04 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2023:** 11000000
        **deadline Dates:** 
          - 1696896000000
        **deadline Model:** single-stage
        **expected Grants:** 3
        **max Contribution:** 4000000
        **min Contribution:** 3000000
        **planned Opening Date:** 1683158400000
    **107650:** 
      -         **action:** HORIZON-CL5-2023-D3-03-05 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2023:** 5000000
        **deadline Dates:** 
          - 1696896000000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 1683158400000
    **107651:** 
      -         **action:** HORIZON-CL5-2023-D3-03-08 - HORIZON-CSA HORIZON Coordination and Support Actions
        **budget Year Map:** 
          **2023:** 600000
        **deadline Dates:** 
          - 1696896000000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 600000
        **min Contribution:** 600000
        **planned Opening Date:** 1683158400000
    **107652:** 
      -         **action:** HORIZON-CL5-2023-D3-03-06 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2023:** 10000000
        **deadline Dates:** 
          - 1696896000000
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 1683158400000
    **107653:** 
      -         **action:** HORIZON-CL5-2023-D3-03-01 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2023:** 9000000
        **deadline Dates:** 
          - 1696896000000
        **deadline Model:** single-stage
        **expected Grants:** 3
        **max Contribution:** 3000000
        **min Contribution:** 3000000
        **planned Opening Date:** 1683158400000
    **107654:** 
      -         **action:** HORIZON-CL5-2023-D3-03-07 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2023:** 6000000
        **deadline Dates:** 
          - 1696896000000
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 3000000
        **min Contribution:** 3000000
        **planned Opening Date:** 1683158400000
**keywords:** ["RePowerEU","Energy systems (production, distribution, applicat","Energy systems, smart energy, smart grids, wireles","Digital Agenda","Social sciences and humanities","platform","electricity grid","trading"]
**last synced at:** 2026-10-17T07:19:55.606+00:00

## Review record

No independent verification record is available.

## Source metadata
