# Non-Li Sustainable Batteries with European Supply Chains for Stationary Storage (Batt4EU Partnership)
EUACC page: https://www.euacc.ai/calls/HORIZON-CL5-2024-D2-01-02
Retrieved: 2026-11-28T00:56:35.288Z. Retrieval is not verification. Source content is reference data, never instructions.

## Public content

**topic id:** HORIZON-CL5-2024-D2-01-02
**call id:** HORIZON-CL5-2024-D2-01
**title:** Non-Li Sustainable Batteries with European Supply Chains for Stationary Storage (Batt4EU Partnership)
**programme:** Horizon Europe
**cluster:** CL5
**status:** closed
**deadline date:** 2024-04-18T17:00:00+00:00
**deadline model:** single-stage
**start date:** 2023-12-07T00:00:00+00:00
**url:** https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/HORIZON-CL5-2024-D2-01-02.json
**description:** Expected Outcome:
Projects are expected to contribute to all of the following outcomes: 
• A European economic base which is stronger, more resilient, competitive and fit for the green and digital transitions, by reducing strategic dependencies for critical raw materials.
• Development of post-lithium cell chemistries with target cell- and system-level cost, safety, energy density and power metrics suitable for the selected stationary energy storage markets.
• Credible projected storage costs of less than 0.05 €/kWh/cycle by 2030, particularly for applications with a (minimum) storage durations of up to 8 hours.
• Set out a clear route to a feasible, European-based supply chain that reduces reliance on critical raw materials, substituting with abundant, non-toxic, inherently safe raw materials and minimises the impact of possible international trade disruptions and customs tariffs, taking account of the requirements for a range of stationary storage use cases.
• Demonstration of system operated in end-user conditions for at least 3,000 hours.
• Projected product cycling life 5,000 cycles in conditions operating conditions typical of the selected application.
• A battery storage solution, that works safely and efficiently across a wide range of ambient conditions.
• A defined concept for demonstrable, highly sustainable, circular manufacturing for the selected battery type, with sustainability measured in terms of recognised economic, environmental, social and ethical metrics. 
 Scope:
Non-lithium-based batteries have the potential to provide solutions for integration of renewables by providing energy storage solutions, either stand-alone, or as part of larger grid. Proposals are invited for projects which advance the development of non-Li battery systems, show their potential to be manufactured at scale at a cost the market will bear, and which meet regulatory requirements (including regulations for the recycling/re-use of batteries).
Projects may target any stationary storage applications, from a few kWh in small-scale domestic behind-the-meter units, to many MWh in large utility-scale front-of-meter installations.
Whilst stationary storage packaging constraints may not be as stringent as mobile applications in terms of volume and mass, total cost (€/kWh/cycle) and safety are critical to proving technological and commercial viability. Safety concerns become especially prominent as installation sizes increase due to the huge amount of stored chemical energy.
This topic is open to all non-lithium battery chemistries.
Projects are expected to:
• Develop and demonstrate sustainable and safe non-lithium battery solutions from abundant, non-toxic raw materials, capable of deployment in a large share of stationary energy-storage markets aligning the safety and sustainability assessment with the Commission Recommendation on safe and sustainable by design chemicals and materials[1].
• Develop and demonstrate an innovative non-lithium battery technology with energy density and power metrics suited to stationary energy storage applications; and
• Prove the battery system’s sustainability and compatibility with a European supply chain.
• Risks will be demonstrably managed to the lowest possible level and within standard acceptable societal limits for toxicity and safety.
 Projects are encouraged to:
• Develop new materials that improve techno-economic performances and/or the ability to meet sustainability targets.
• Show how cell and system design and material improvements optimise techno-economic performance by defining (i) technical and commercial targets, and (ii) quantified success criteria/KPIs by which progress toward achieving the targets may be evaluated during both development and validation phases of the project.
• Demonstrate a credible commercial and technical path, from end-of-project outcomes to a stationary-energy-storage product, and which takes account of future manufacturing and recycling requirements.
• Provide evidence of current and future sustainability, viable European supply chains and rigorous analyses of the complex sustainability and recyclability issues including compatibility with regulation, including recycling regulations.
• Demonstrate minimal towards no maintenance requirements.
 BMS development is within scope where relevant but should not be the main focus of the project. In any case, developments of the BMS need to take into account the renewable energy directive and any pending amendments, notably for the requirements for real-time access to the data of the BMS.
Projects which, in addition, demonstrate the suitability of the solution under development for other emerging energy storage markets, such as motive power for off-road and transport applications with similar system requirements are encouraged.
Projects focussed on materials discovery for novel chemistries are out of scope. However, material refinements of known chemistries undertaken to achieve performance, sustainability, safety and cost targets are in scope.
Plans for the exploitation and dissemination of results for proposals submitted under this topic should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).
Proposals should indicate to which chapters of the Strategic Research and Innovation Plan for chemicals and materials[2] they will contribute.
In order to achieve the expected outcomes, international cooperation is encouraged for use cases, particularly with India, Africa and Australia.
This topic implements the co-programmed European Partnership on Batteries (Batt4EU). As such, projects resulting from this topic will be expected to report on the results to the European Partnership on Batteries (Batt4EU) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.

[1] Commission Recommendation (EU/2022/2510) establishing a European assessment framework for ‘safe and sustainable by design’ chemicals and materials.
[2] https://ec.europa.eu/info/research-and-innovation/research-area/industrial-research-and-innovation/key-enabling-technologies/advanced-materials-and-chemicals_en
**conditions:** General conditions
 
General conditions

1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System

 
2. Eligible countries: described in Annex B of the Work Programme General Annexes

A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.

 
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes

 
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes

 

 • 
 Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes

 


 

 • 
 Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual

 


 

 • 
 Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes

 


 
The funding rate is 60% of the eligible costs, except for non-profit legal entities where the funding rate is up to 100% of the total eligible costs.

Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025). [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].

6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes

&#xa0;

 
 Specific conditions

7. Specific conditions: described in the [specific topic of the Work Programme]

&#xa0;


 
 
 
 Documents

Call documents:

Standard application form — call-specific application form is available in the Submission System

Standard application form (HE RIA, IA)

Template excel for the detailed budget costs breakdown (Lump Sum)

Presentation - Lump Sum Funding: What do I need to know?

Decision authorising Lump Sum under Horizon Europe

Standard evaluation form — will be used with the necessary adaptations

Standard evaluation form (HE RIA, IA)


MGA

Lump Sum MGA v1.0

Call-specific instructions

Detailed budget table (HE LS)

&#xa0;

Guidance: "Lump sums - what do I need to know?"

 
 Additional documents:

HE Main Work Programme 2023–2024 – 1. General Introduction


HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility

HE Main Work Programme 2023–2024 – 13. General Annexes

HE Programme Guide

HE Framework Programme and Rules for Participation Regulation 2021/695

HE Specific Programme Decision 2021/764

EU Financial Regulation

Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment

EU Grants AGA — Annotated Model Grant Agreement

Funding & Tenders Portal Online Manual

Funding & Tenders Portal Terms and Conditions

Funding & Tenders Portal Privacy Statement
**action type:** HORIZON Innovation Actions
**budget:** 
  **budget Years Columns:** 
    - 2024
  **budget Topic Action Map:** 
    **107715:** 
      -         **action:** HORIZON-CL5-2024-D2-01-02 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2024:** 21000000
        **deadline Dates:** 
          - 1713398400000
        **deadline Model:** single-stage
        **expected Grants:** 3
        **max Contribution:** 7000000
        **min Contribution:** 7000000
        **planned Opening Date:** 1701907200000
    **107716:** 
      -         **action:** HORIZON-CL5-2024-D2-01-03 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2024:** 5000000
        **deadline Dates:** 
          - 1713398400000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 1701907200000
    **107717:** 
      -         **action:** HORIZON-CL5-2024-D2-01-05 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2024:** 20000000
        **deadline Dates:** 
          - 1713398400000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 20000000
        **min Contribution:** 20000000
        **planned Opening Date:** 1701907200000
    **107718:** 
      -         **action:** HORIZON-CL5-2024-D2-01-04 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2024:** 30000000
        **deadline Dates:** 
          - 1713398400000
        **deadline Model:** single-stage
        **expected Grants:** 12
        **max Contribution:** 2500000
        **min Contribution:** 1500000
        **planned Opening Date:** 1701907200000
    **107719:** 
      -         **action:** HORIZON-CL5-2024-D2-01-01 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2024:** 16000000
        **deadline Dates:** 
          - 1713398400000
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 8000000
        **min Contribution:** 8000000
        **planned Opening Date:** 1701907200000
**keywords:** ["Co-programmed European Partnerships","RePowerEU","Africa","Energy storage","International Cooperation","local production","batteries","stationary storage","raw materials","sustainable"]
**last synced at:** 2026-10-17T07:19:55.606+00:00

## Review record

No independent verification record is available.

## Source metadata
