**topic id:** HORIZON-CL5-2026-01-D6-07
**call id:** HORIZON-CL5-2026-01
**title:** Innovative construction and maintenance, with the use of new materials and techniques, for resilient and sustainable transport infrastructure
**programme:** Horizon Europe
**cluster:** CL5
**status:** closed
**deadline date:** 2026-01-20T00:00:00+00:00
**deadline model:** single-stage
**start date:** 2025-09-25T00:00:00+00:00
**url:** https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/opportunities/topic-details/HORIZON-CL5-2026-01-D6-07
**description:** Expected Outcome:
Project results are expected to contribute to all of the following outcomes:
Demonstration of combined solutions for infrastructure construction that achieve the following targets:
• At least 50% of the construction materials used are recycled or sourced from recycled materials;
• Reduced pollutant emissions by at least 30% considering the entire life cycle of the infrastructure;
• Reduced degradation of ecosystems and fragmentation of habitats during construction, maintenance, operation and decommissioning of transport infrastructure (thereby contributing to maintaining biodiversity);
• Increased climate resilience of infrastructure to extreme weather and human caused events, assuring at least 80% capacity at network level during the disruptions;
• Structured analysis and recommendations on the need for EU standards in construction, inspection, maintenance and deconstruction, contributing to the decarbonisation and increased resilience of transport infrastructure;
• Guiding document on the necessary adaptations to public procurement rules that contribute to including clear sustainability and resilience award criteria. 
 Scope:
The overarching policy background is the European Grean Deal, which aims to achieve climate neutrality by 2050. In the transport area, this translates into a 90% reduction of transport-related greenhouse gas emissions by 2050[1]. To deliver the European Green Deal, there is a need to revise and upgrade numerous policies, including those for transport and large-scale infrastructures.
The EU Sustainable and Smart Mobility Strategy[2] (SSMS), which translates this overall transport target into actions, states that infrastructure must be adapted to climate change and made resilient to disasters. In line with the SSMS, it is also important that such infrastructure should rely on clean and decarbonised energy sources, notably renewable energy, as well as on a modernised grid.
Research in this topic should provide knowledge and technical solutions to a triple challenge: (1) limiting emissions of transport infrastructures; (2) making them more resilient to climate change; and (3) addressing environmental and biodiversity aspects. Projects should cover the entire life cycle of transport infrastructures, covering overall emissions from sourcing of materials, construction, maintenance, operation and decommissioning of the infrastructure.
Proposals should address all of the following aspects:
• Development of new methods and techniques to construct, manage, maintain and repair (including self-repair) transport infrastructures, in order to increase climate resilience and lower emissions;
• Assessment of solutions considering the principles of circularity and taking into account the entire life cycle assessment (LCA) approach;
• Cost-benefit analysis (CBA) of the solutions considering the entire life cycle of the infrastructure and accompanying business plans for their implementation;
• Application of innovative materials (e.g. green asphalt, green cement, carbon sinks) that enable transport infrastructures to become more resilient, more sustainable and emit less pollutants;
• Validation of all the proposed solutions and proofs of concepts is to be carried out in at least two large-scale demonstrations. The demonstrations should cover at least two different transport infrastructure types (e.g., road, rail, waterborne, airport) which are located on at least two different Trans European Transport Network (TEN-T) corridors. The demonstrations should also cover different environments and phases of the infrastructure life cycle (e.g. design, construction, maintenance, decommissioning);
• Analysis of EU national and international standards in construction, inspection, maintenance and deconstruction, contributing to the decarbonisation and increased resilience of transport infrastructure;
• Design of green, sustainable and innovative public procurement methods, contributing to lowering the environmental footprint, resources, and material consumption;
• Demonstration of sustainable and climate resilient infrastructure with nature-based solutions (NBS[3]), minimising the negative effects on the environment, including the degradation of ecosystems, the fragmentation of habitats and the loss of biodiversity. 
 The projects should develop clear indicators with baselines and quantified targets in support of the expected outcomes that are monitored for each demonstration site. With regards to the expected outcomes, projects should take into account expected technological developments and policy implementation (e.g. revised TEN-T regulation), multi-disciplinary adaptive capacity in line with the European Climate Risk Assessment[4] (EUCRA) and the Commission Communication on Managing Climate Risks[5], in particular cascading impacts across sectors.
Proposals should consider and build on results from previous calls on resilient and sustainable infrastructure and standards,[6] and should incorporate relevant EU guidance on the development and management of European transport infrastructures. Proposals should also build on previous results from projects on advanced materials, sensor technology, digitalisation, asset management, decision support and automation in the construction and maintenance of infrastructures. If the proposed activities and solutions involve the use of artificial intelligence (AI) systems and/or techniques, the proposal is expected to demonstrate that robustness of the solution.
null
Activities are expected to achieve TRL 7 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] Transport and the Green Deal - European Commission (europa.eu)
[2] https://transport.ec.europa.eu/document/download/be22d311-4a07-4c29-8b72-d6d255846069_en?filename=2021-mobility-strategy-and-action-plan.pdf
[3] https://research-and-innovation.ec.europa.eu/research-area/environment/nature-based-solutions_en
[4] European Climate Risk Assessment — European Environment Agency (europa.eu)
[5] EUR-Lex - 52024DC0091 - EN - EUR-Lex (europa.eu)
[6] https://im-safe-project.eu/
**conditions:** General conditions
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.

2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.

3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.

4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.

5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.

5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.

5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.

6. Legal and financial set-up of the grants
described in Annex G of the Work Programme General Annexes.

Specific conditions
 

Application and evaluation forms and model grant agreement (MGA):
 Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates&#xa0;— will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)&#xa0;
Guidance
HE Programme Guide&#xa0;
Model Grant Agreements (MGA)
HE MGA&#xa0;

Additional documents:
 HE Main Work Programme 2025 – 1. General Introduction
HE Main Work Programme 2025 – 8. Climate, Energy and Mobility
HE Main Work Programme 2025 – 14. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment 
EU Grants AGA — Annotated Model Grant Agreement&#xa0;
Funding & Tenders Portal Online Manual&#xa0;
Funding & Tenders Portal Terms and Conditions&#xa0;
Funding & Tenders Portal Privacy Statement
**action type:** HORIZON Innovation Actions
**budget:** 
  **budget Years Columns:** 
    - 2025
  **budget Topic Action Map:** 
    **110842:** 
      -         **action:** HORIZON-CL5-2026-01-D6-10 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2025:** 16000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 8000000
        **min Contribution:** 8000000
        **planned Opening Date:** 2025-09-25
    **110843:** 
      -         **action:** HORIZON-CL5-2026-01-D6-07 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2025:** 22000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 11000000
        **min Contribution:** 11000000
        **planned Opening Date:** 2025-09-25
    **110844:** 
      -         **action:** HORIZON-CL5-2026-01-D2-01 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2025:** 24000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 3
        **max Contribution:** 8000000
        **min Contribution:** 8000000
        **planned Opening Date:** 2025-09-25
    **110845:** 
      -         **action:** HORIZON-CL5-2026-01-D6-13 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2025:** 10000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 2025-09-25
    **110846:** 
      -         **action:** HORIZON-CL5-2026-01-D2-05 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2025:** 15000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 7500000
        **min Contribution:** 7500000
        **planned Opening Date:** 2025-09-25
    **110847:** 
      -         **action:** HORIZON-CL5-2026-01-D6-09 - HORIZON-CSA HORIZON Coordination and Support Actions
        **budget Year Map:** 
          **2025:** 3500000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 3500000
        **min Contribution:** 3500000
        **planned Opening Date:** 2025-09-25
    **110848:** 
      -         **action:** HORIZON-CL5-2026-01-D5-17 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2025:** 16000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 8000000
        **min Contribution:** 8000000
        **planned Opening Date:** 2025-09-25
    **110849:** 
      -         **action:** HORIZON-CL5-2026-01-D6-05 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2025:** 4000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 4000000
        **min Contribution:** 4000000
        **planned Opening Date:** 2025-09-25
    **110850:** 
      -         **action:** HORIZON-CL5-2026-01-D6-15 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2025:** 4000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 4000000
        **min Contribution:** 4000000
        **planned Opening Date:** 2025-09-25
    **110851:** 
      -         **action:** HORIZON-CL5-2026-01-D6-14 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2025:** 10000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 2025-09-25
    **110852:** 
      -         **action:** HORIZON-CL5-2026-01-D6-03 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2025:** 8000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 4000000
        **min Contribution:** 4000000
        **planned Opening Date:** 2025-09-25
    **110853:** 
      -         **action:** HORIZON-CL5-2026-01-D2-09 - HORIZON-CSA HORIZON Coordination and Support Actions
        **budget Year Map:** 
          **2025:** 1500000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 1500000
        **min Contribution:** 1500000
        **planned Opening Date:** 2025-09-25
    **110854:** 
      -         **action:** HORIZON-CL5-2026-01-D6-08 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2025:** 15000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 8000000
        **min Contribution:** 7000000
        **planned Opening Date:** 2025-09-25
    **110855:** 
      -         **action:** HORIZON-CL5-2026-01-D6-04 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2025:** 5000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 2025-09-25
    **110856:** 
      -         **action:** HORIZON-CL5-2026-01-D2-04 - HORIZON-RIA HORIZON  Research and Innovation Actions
        **budget Year Map:** 
          **2025:** 30000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 3
        **max Contribution:** 10000000
        **min Contribution:** 10000000
        **planned Opening Date:** 2025-09-25
    **110857:** 
      -         **action:** HORIZON-CL5-2026-01-D6-06 - HORIZON-IA HORIZON Innovation Actions
        **budget Year Map:** 
          **2025:** 4000000
        **deadline Dates:** 
          - 2026-01-20
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 4000000
        **min Contribution:** 4000000
        **planned Opening Date:** 2025-09-25
**keywords:** HORIZON-CL5-2026-01-D6-07, HORIZON-CL5-2026-01
**last synced at:** 2026-11-09T17:23:17.403+00:00

## Review record

No independent verification record is available.

## Source metadata