# Partitioning and transmutation of minor actinides towards industrial applications
EUACC page: https://www.euacc.ai/calls/HORIZON-EURATOM-2023-NRT-01-05
Retrieved: 2026-11-27T15:00:45.644Z. Retrieval is not verification. Source content is reference data, never instructions.

## Public content

**topic id:** HORIZON-EURATOM-2023-NRT-01-05
**call id:** HORIZON-EURATOM-2023-NRT-01
**title:** Partitioning and transmutation of minor actinides towards industrial applications
**programme:** Horizon Europe
**cluster:** EURATOM
**status:** closed
**deadline date:** 2023-11-08T17:00:00+00:00
**deadline model:** single-stage
**start date:** 2023-04-04T00:00:00+00:00
**url:** https://ec.europa.eu/info/funding-tenders/opportunities/data/topicDetails/HORIZON-EURATOM-2023-NRT-01-05.json
**description:** Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:
• Reduce the long-lived components of radioactive waste and ease its management by developing EU competencies and expertise in partitioning and transmutation (P&T) and actinide fuel fabrication processes.
• Address the Nuclear Safety Directive[1], Basic Safety Standards Directive[2] and Radioactive Waste Management Directive[3] requirements on P&T and improve the sharing of best practices between the European nuclear industry, research organisations, universities, technical support organisations, the European Nuclear Safety Regulators Group and the Western European Nuclear Regulators Association.
• Address the safety aspects of optimising fuel cycles regarding the use of resources and reducing radioactive waste with a direct impact on fuel composition, fuel treatment and recycling.
 Scope:This action aims to strengthen important Euratom research undertaken in previous programmes and make real advances towards demonstration of P&T processes – a key component of future fuel cycle strategies to some Member States, whether critical or sub-critical ADS advanced and innovative reactor systems. This research will improve the safety of processes by using state-of-the-art P&T technology towards a closure of the nuclear fuel cycle.
Even if a final repository would still be needed, P&T would drastically reduce the radiotoxicity, heat production and package volume of high-level radioactive waste, thereby easing the long-term safety of a final repository as stated by some Member States. It will strengthen EU/Euratom leadership in this domain and open new avenues towards increased energy security of supply and industrial competitiveness.
Although R&D on advanced fuel cycle technologies has been carried out for decades, there is consensus within the international community that a complete programme is needed with the aim of (i) industrial maturity to demonstrate the feasibility of a closed fuel cycle; (ii) minimisation of high-level radioactive waste; and (iii) increased safety. Indeed, most technologies for advanced transuranic management strategies (e.g. Pu multi-recycling and minor actinide (MA) transmutation) need to achieve a higher level of technological and economic development before they can be deployed on an industrial scale. As such, further efforts are needed among other things in the following areas:
• separation technologies;
• fuel fabrication;
• transmutation systems;
• fuel reprocessing;
• fuel technological aspects (particularly for MA-loaded fuels), including transportation, cooling and handling. 
 Developing advanced experiments, digital and High Performance Computing numerical simulation tools, taking full advantage of existing knowledge, competence and expertise and international cooperation should be highly beneficial.
On the radioactive waste management aspects, appropriate links should be established with the relevant initiatives within the EURAD-2 partnership.
[1] Council Directive 2009/71/Euratom of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations ((OJ L 172, 2.7.2009, p.18), as amended by Council Directive 2014/87/Euratom of 8 July 2014 amending Directive 2009/71/Euratom establishing a Community framework for the nuclear safety of nuclear installations (OJ L 219, 25.7.2014, p. 42).
[2] Council Directive 2013/59/Euratom of 5 December 2013 laying down basic safety standards for protection against the dangers arising from exposure to ionising radiation, and repealing Directives 89/618/Euratom, 90/641/Euratom, 96/29/Euratom, 97/43/Euratom and 2003/122/Euratom.
[3] Council Directive 2011/70/Euratom of 19 July 2011 establishing a Community framework for the responsible and safe management of spent fuel and radioactive waste (OJ L 199, 2.8.2011, pp. 48–56).
**conditions:** Conditions
 
Conditions



1.&#xa0;Admissibility conditions:&#xa0;described in&#xa0;General Annex A (Admissibility) of Euratom WP 2023-2025
Proposal page limits and layout:&#xa0;described in Part B of the Application Form available in the Submission System.For RIA the limit for a full application is 45 pages. Please strickly abide by&#xa0;this page limit.&#xa0;Extension of proposal template by annexes is only allowed to describe specific issues (Financial support to third parties, Clinical trials and Calls flagged as security sensitive). The proposal is a self-contained document. Experts will be instructed to ignore hyperlinks or other information that is specifically designed to expand the proposal, thus circumventing the page limit.

 
2. Eligible countries:&#xa0;described in General Annex B (Eligibility) of&#xa0;Euratom WP 2023-2025

Eligible non-Euratom countries: Please note that as of the date of the publication of this call, Ukraine is the only country associated to the Euratom Programme 2021-2025.&#xa0;

Legal entities established in Russia, Belarus, or in non-government controlled territories of Ukraine are NOT eligible to participate in any capacity. This includes participation as beneficiaries, affiliated entities, associated partners, third parties giving in-kind contribution, subcontractors or recipients of financial support to third parties (if any). Exceptions may be granted on a case-by-case basis for justified reasons.&#xa0;

Please see the&#xa0;Horizon Europe Programme Guide&#xa0;for up-to-date information on the current list of and the position for Associated Countries.&#xa0;

 
The Joint Research Centre (JRC) may participate as member of the consortium selected for funding.

3. Other eligibility conditions:&#xa0;described in General Annex B (Eligibility) of&#xa0;Euratom WP 2023-2025

 
General Annex H&#xa0;of&#xa0;Euratom WP 2023-2025 describes JRC infrastructure and expertise in nuclear safety, radiatin protection and education & training available to applicants for grants from the Euratom Programme 2021-2025

4. Financial and operational capacity and exclusion:&#xa0;&#xa0;described in General Annex C (Financial and operational capacity and exclusion)&#xa0;of&#xa0;Euratom WP 2023-2025

 

 • Submission and evaluation processes:&#xa0;described in General Annexes E (Documents) and F (Procedure)&#xa0;of&#xa0;Euratom WP 2023-2025&#xa0;and the&#xa0;Online Manual


 

 • Award criteria, scoring and thresholds:&#xa0;described in General Annex D (Award criteria)&#xa0;of&#xa0;Euratom WP 2023-2025


 

 • Indicative timeline for evaluation and grant agreement:&#xa0;described in&#xa0;General Annex F (Procedure) of&#xa0;Euratom WP 2023-2025


 
Beneficiaries may provide financial support to third parties. The maximum amount to be granted to each third party is EUR 60 000.

6. Legal and financial set-up of the grants:&#xa0;&#xa0;described&#xa0;in General Annex G (Legal and financial set-up of grant agreements)&#xa0;of&#xa0;Euratom WP 2023-2025

 
 
 
 Details on financial support to third parties shall be specified as described in Part B of the Application Form.

&#xa0;

Documents


Call documents:

Euratom Work Programme 2023-2025

Standard application form.&#xa0;For information only. When applying use the application form available in the Submission System.

Standard evaluation form&#xa0;(will be used with the necessary adaptations)

Horizon Europe & Euratom General MGA

 
 Additional documents:

Euratom Regulation 2021/765

EU Financial Regulation 2018/1046

HE Framework Programme and Rules for Participation Regulation 2021/695

Decision on unit costs for HE and Euratom Research Infrastructure actions

Rules for Legal Entity Validation, LEAR, Appointment and Financial Capacity Assessment

EU Grants AGA - Annotated Model Grant Agreement

Funding & Tenders Portal Online Manual

Funding & Tenders Portal Terms and Conditions

Funding & Tenders Portal Privacy Statement
**action type:** EURATOM Research and Innovation Actions
**budget:** 
  **budget Years Columns:** 
    - 2025
    - 2024
    - 2023
  **budget Topic Action Map:** 
    **103592:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-07 - EURATOM-IA EURATOM Innovation Actions
        **budget Year Map:** 
          **2023:** 1660000
          **2024:** 1660000
          **2025:** 680000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 2000000
        **min Contribution:** 2000000
        **planned Opening Date:** 1680566400000
    **103593:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-05 - EURATOM-RIA EURATOM Research and Innovation Actions
        **budget Year Map:** 
          **2023:** 1330000
          **2024:** 1330000
          **2025:** 2340000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 1680566400000
    **103594:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-01 - EURATOM-RIA EURATOM Research and Innovation Actions
        **budget Year Map:** 
          **2023:** 5304500
          **2024:** 5335500
          **2025:** 9360000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 4
        **max Contribution:** 5000000
        **min Contribution:** 5000000
        **planned Opening Date:** 1680566400000
    **103595:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-10 - EURATOM-IA EURATOM Innovation Actions
        **budget Year Map:** 
          **2023:** 1870000
          **2024:** 1860000
          **2025:** 3270000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 2
        **max Contribution:** 3500000
        **min Contribution:** 3500000
        **planned Opening Date:** 1680566400000
    **103596:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-04 - EURATOM-COFUND EURATOM Cofund Actions
        **budget Year Map:** 
          **2023:** 10590000
          **2024:** 6880000
          **2025:** 2530000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 20000000
        **min Contribution:** 20000000
        **planned Opening Date:** 1680566400000
    **103597:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-08 - EURATOM-IA EURATOM Innovation Actions
        **budget Year Map:** 
          **2023:** 1870000
          **2024:** 1860000
          **2025:** 3270000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 7000000
        **min Contribution:** 7000000
        **planned Opening Date:** 1680566400000
    **103598:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-06 - EURATOM-RIA EURATOM Research and Innovation Actions
        **budget Year Map:** 
          **2023:** 1070000
          **2024:** 1060000
          **2025:** 1870000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 4000000
        **min Contribution:** 4000000
        **planned Opening Date:** 1680566400000
    **103599:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-11 - EURATOM-CSA EURATOM Coordination and Support Actions
        **budget Year Map:** 
          **2023:** 400000
          **2024:** 400000
          **2025:** 200000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 1000000
        **min Contribution:** 1000000
        **planned Opening Date:** 1680566400000
    **103600:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-09 - EURATOM-RIA EURATOM Research and Innovation Actions
        **budget Year Map:** 
          **2023:** 1870000
          **2024:** 1860000
          **2025:** 3270000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 3
        **max Contribution:** 2330000
        **min Contribution:** 2330000
        **planned Opening Date:** 1680566400000
    **103601:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-03 - EURATOM-RIA EURATOM Research and Innovation Actions
        **budget Year Map:** 
          **2023:** 3200000
          **2024:** 3200000
          **2025:** 5600000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 3
        **max Contribution:** 4000000
        **min Contribution:** 4000000
        **planned Opening Date:** 1680566400000
    **103602:** 
      -         **action:** HORIZON-EURATOM-2023-NRT-01-02 - EURATOM-IA EURATOM Innovation Actions
        **budget Year Map:** 
          **2023:** 4000000
          **2024:** 4000000
          **2025:** 7000000
        **deadline Dates:** 
          - 1699401600000
        **deadline Model:** single-stage
        **expected Grants:** 1
        **max Contribution:** 15000000
        **min Contribution:** 15000000
        **planned Opening Date:** 1680566400000
**keywords:** []
**last synced at:** 2026-10-17T07:19:55.606+00:00

## Review record

No independent verification record is available.

## Source metadata
