This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Projects the EU funded under this call, with the organisation that led each one.
12.7-NL-W-M-23-CO2nextCO2next (Works application)
Led by NV Nederlandse Gasunie · Netherlands · 2024 · Official record ↗
12.7-NL-W-M-23-ARAMISAramis Transport & Compression (Works application)
Led by Shell Gas & Power Developments B.v · Netherlands · 2024 · Official record ↗
6.20.4-RO-W-M-23-DROCSP1Depomures storage in Romania – Compression station, Phase 1
Led by Depomures SA · Romania · 2024 · Official record ↗
12.4-NO-W-M-23-NLP2Northern Lights Phase 2 Expansion Works
Led by Northern Lights Jv da · Norway · 2024 · Official record ↗
12.8-FR-W-M-23-D Artagnan Phase ID'Artagnan: Dunkirk CO2 Hub Phase I
Led by Air Liquide France Industrie · France · 2024 · Official record ↗
10.11-CZDE-W-M-23-GabretaGabreta Smart Grids
Led by EG.D Holding, a.s. · Czech Republic · 2024 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Expected Impact:It is expected that the financial assistance contributes to the further development and implementation of PCIs, helping to achieve the broader TEN-E energy policy objectives.
As indicated in section 4 of the Annex to the Multi-annual Work Programme, it is expected that the financial assistance contributes to the further development and implementation of PCIs in electricity, smart grids, gas and cross-border carbon dioxide networks helping to achieve the broader CEF energy policy objectives of:
In accordance with recital 5 of the CEF Regulation (EU) 2021/1153 and in line with the Multi-annual Work Programme, this call for proposals aims at financing projects contributing to the goals and objectives of the European Green Deal, as well as the Paris Agreement and the 2030 climate and enegy targets and the EU's mid-term and long-term objectives in terms of decarbonisation.
Expected Outcome:Both topics under this call aim to enable PCIs to be implemented within the framework of the deployment of trans-European networks in the energy sector. In particular, the call shall contribute to supporting energy infrastructure PCIs that have significant socio-economic benefits and ensure greater solidarity among Member States, but which do not receive adequate financing from the market.
The European Green Deal has emphasized the key enabling role of energy infrastructure in the transition to a climate neutral economy. Projects supported by this call pursue the goals and objectives of the European Green Deal, as well as the Paris Agreement and the 2030 climate and energy targets and long-term decarbonisation objectives. Therefore, financial assistance provided under this call for proposals should maximise its added value towards decarbonisation of the energy sector.
Objective:The objective of studies and works is to support and contribute to the implementation of PCIs.
Scope:This topic refers to projects for works contributing to the implementation of a PCI. Works in the meaning of CEF-Energy include the purchase, supply and deployment of components, systems and services including software, the development, construction and installation activities relating to a PCI, the acceptance of installations and the launching of a PCI.
Only projects contributing to PCIs as identified in the Commission Delegated Regulation 2022/564 shall be eligible for support through EU financial aid in the form of grants.
Pursuant to Articles 14(2) and 14(3) of the TEN-E Regulation, PCIs falling under the categories set out in Annex II.1(a) to (d) and Annex II.2 of the TEN-E Regulation, except for hydro-pumped electricity storage PCIs, are also eligible for EU financial assistance in the form of grants for works if they fulfil all of the following criteria (see also section 5 for documents to be provided…):
Pursuant to Article 14(4) of of Regulation (EU) No 347/2013, PCIs falling under the categories set out in Annex II.1(e) and 4 of of Regulation (EU) No 347/2013, i.e. "smart grids and cross-border carbon dioxide networks", are also eligible for EU financial assistance in the form of grants for works, if the concerned project promoters can clearly demonstrate the significant positive externalities generated by the PCIs and their lack of commercial viability, according to the business plan and other assessments carried out, notably by possible investors or creditors or, where applicable, a national regulatory authority.
The contents of the supporting documents and whether the proposed project demonstrates evidence concerning the existence of significant positive externalities, namely security of supply, solidarity or innovation; provides services across borders, brings technological innovation and ensures the safety of cross-border grid operation; or is commercially not viable will be assessed during the evaluation under the applicable award criteria.
The proposals requesting grants for works which fail to provide the relevant supporting documents or that provide supporting documents that are not legally valid at the time of their submission or which fail to comply with any of the eligibility criteria indicated above may not be eligible.
1. Admissibility conditions: described in section 5 of the call document
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in section 6 of of the call document
3. Other eligibility conditions: described in section 6 of the call document
4. Financial and operational capacity and exclusion: described in section 7 of the call document
Submission and evaluation processes: described section 8 of the call document and the Online Manual
Award criteria, scoring and thresholds: described in section 9 of the call document
Indicative timeline for evaluation and grant agreement: described in section 4 of the call document
6. Legal and financial set-up of the grants: described in section 10 of the call document
 
Documents
Call documents:
Call document
Standard application form
Detailed budget table
Timetable (GANTT Chart)
Letter of support (MS Agreement)
Environmental Compliance File
TEN-E Compliance Form
CEF MGA
Work Programme 2021-2027 (CEF-E)
CEF Regulation 2021/1153
EU Financial Regulation 2018/1046
 
Business Plan Financial Spreadsheet
Applicants asked the EU 121 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
Such entity may apply, if the eligibility criteria related to the applicant and the PCI/PMI as described in the work programme and in the call for proposals are met, i.e. the company is involved in the implementation of an action related to one of the projects of common interest or projects of mutual interest on the PCI and PMI list and it obtained the agreement of the concerned Member State.
However, please keep in mind the definitions of the PCI/PMI and the project promoter in Article 2 of the TEN -E Regulation. Please also note that as the proposal will be assessed notably against its direct contribution to PCI/PMI implementation, it should demonstrate appropriate cooperation with the project promoter(s) of the PCI/PMI.
Read it on the EU portal ↗Answered 28 Sept 2026
No. The requirement for applicants to demonstrate their operational and financial capacity does not apply to Member States, international organisations, public bodies established in the EU, transmission system operators certified following the procedures laid down in Articles 52 or 53 of Directive 2019/944(EU), or Articles 71 or 72 of Directive 2024/1788 and Joint Undertakings established in the EU which qualify as public bodies.
Read it on the EU portal ↗Answered 11 Jun 2026
Only Projects for Common Interest or Projects of Mutual Interest, if meeting the eligibility conditions in Article 18 of the TEN-E Regulation (EU) 2022/869, are eligible to apply for funding under the CEF Energy PCI/PMI calls. The conditions for the eligibility of these projects, or parts thereof, to become Projects for Common Interest or Projects of Mutual Interest are enshrined in the TEN-E Regulation.
Only the infrastructure categories covered by Annex II.(5) of the TEN-E Regulation are eligible under CEF Energy. These relate to CO2 transport via dedicated pipelines, facilities for liquefaction or buffer storage of CO2 in view of its further transportation or any equipment or installation to properly, securely and efficiently operate the CO2 transport infrastructure. Activities or tasks related to other types of assets, such as those aiming at CO2 capture or CO2 geological storage, are not eligible.
Read it on the EU portal ↗Answered 11 Jun 2026
In the Environmental compliance file each applicant shall provide information for each Member State where the project is implemented.
Read it on the EU portal ↗Answered 15 May 2026
Applicants from proposals selected for funding will be requested, during grant agreement preparation, to submit documents for a Financial Capacity Assessment, when applicable, in order to determine that they have the financial means to carry out the project. See Section 7 of the call document. As stated therein, if it is concluded that your financial capacity is not satisfactory, we may require further information, i.e. joint and several responsibility for all beneficiaries or joint and several liability of affiliated entities, pre-financing paid in instalments, pre-financing guarantees, or propose no prefinancing. Ultimately, we may request that you are replaced or reject the entire proposal.
The result on the financial capacity assessment cannot be prejudged and will be based case by case on the applicant, the proposed project, the role of the company, the amount of funding, etc.
Read it on the EU portal ↗Answered 30 Apr 2026
Lease of land is not eligible for funding under CEF-Energy.
Read it on the EU portal ↗Answered 30 Apr 2026
No. The CEF Energy programme co-finances studies and works related, inter alia, to CO2 transport infrastructure.
However, to be funded under CEF Energy, a proposed action has to meet, among others, two conditions: 1) to contribute to the implementation of an energy infrastructure project of common interest (PCI) and 2) to relate to one (or more) of the infrastructure items described in Annex II of the TEN-E regulation. These do not include gas pipelines for supply to industrial installations such as blast furnaces.
Read it on the EU portal ↗Answered 30 Apr 2026
The PCIs and PMIs included in the latest PCI and PMI list, established by Commission Delegated Regulation (EU) 2026/764 of 1 December 2025 can apply for the ongoing PCI/PMI call for proposals.
Read it on the EU portal ↗Answered 30 Apr 2026
There is no requirement outlining that there should be no signed contract between project promoter and contractor before a proposal has been submitted. If a contract already exists, this should be stated in application form. Please note the specific cost eligibility conditions for this call: only costs for activities carried out in eligible countries or target countries are eligible, subcontracted work must be performed in the eligible countries or target countries.For further details on specific eligibility conditions applicable to award of purchase contracts and subcontracting, please refer to Article 6.2 (sections C Purchase costs and B Subcontracting costs), and Article 9.3 of the model grant agreement.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes. However, please make sure that the additional WPs are necessary for the implementation of the action.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, this would be eligible for funding under this call, as it falls within the scope of Annex II, (5).d), of the TEN-E Regulation, which states that “concerning carbon dioxide […] (c) any equipment or installation essential for the system in question to operate properly, securely and efficiently, including protection, monitoring and control systems.” This specific infrastructure item is considered to be included in such kind of assets.
Read it on the EU portal ↗Answered 30 Apr 2026
In case of a cross-border PCI/PMI when both project promoters intend to submit proposals for funding, we strongly recommend submitting a joint application, with different work packages to be carried out by the two project promoters.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes. It is not possible for the project promoters to apply for grants for works under the current call if the CBCA decision from the concerned NRAs (or the Agency for the Cooperation of Energy Regulators – ACER) is still pending. However, a works proposal could be submitted under the next call, once the CBCA decision has been issued.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, it is possible to apply for CEF Energy funding if part of the activities of the proposed Action will be implemented through subcontracts. All procurements to be done in relation to the activities of the proposed Action should be clearly explained in the application form. Please note the specific cost eligibility conditions for this call: only costs for activities carried out in eligible countries or target countries are eligible; subcontracted work must be performed in the eligible countries or target countries. For further details on specific eligibility conditions applicable to award of purchase contracts and subcontractors, please refer to Article 6.2 (sections C Purchase costs and B Subcontracting costs), and Article 9.3 of the model grant agreement.
Read it on the EU portal ↗Answered 30 Apr 2026
The information to be provided has to reflect the situation of the current applicant. If the new company taking over the implementation of the proposed Action is not yet officially established at the time of submission, no specific administrative documents need to be provided. Nonetheless, if important changes - such as a change to the legal structure of the project promoter - are already known at submission stage, they should be described in the application. An explanation of how such changes will be implemented should also be provided in the application. Applicant(s) should also indicate to which extent and how the change may impact the implementation of the proposed Action. If the change led to new risks related to the implementation of the Action, these should also be described together with the risk mitigation measures envisaged. All of this information can be provided in Section 3.2 Consortium set-up, governance and organisational structure of the application form PART B.
Read it on the EU portal ↗Answered 30 Apr 2026
“The territory of which the proposed Action is planned to be implemented” concerns the location(s) of the activity/ies that are the subject of the proposal. It does not necessarily cover the location where the costs are to be incurred or where the personnel working on the Action are located.
Read it on the EU portal ↗Answered 30 Apr 2026
The information provided in the application form should relate to the proposed Action itself and, where relevant, to the PCI/PMI to which it is related. In particular, for works proposals, applicants should refer to the cross-border allocation (CBA) of the concerned PCI/PMI when providing information on the need to overcome financial obstacles. However, if the CBA was prepared for a cluster of PCIs, rather than for a specific PCI/PMI within that cluster, the information can then be provided for the cluster.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes. All PCIs and PMIs in the PCI and PMI list are eligible for grants for studies.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, if the infrastructures are part of the PCI/PMI scope. As they fall under categories described in Annex II. (5) of the TEN-E Regulation, they would be eligible for funding under this call.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes. The evaluation is done only on applications for the current call and does not take previous applications into account. Therefore it is necessary to submit all requested documents for each application, even in the case that an applicant would submit several proposals for the same call.
Please also note that it is the responsibility of the applicant to ensure that data provided in the application is up-to-date and valid.
Read it on the EU portal ↗Answered 30 Apr 2026
PCIs included in Annex II.1 (a) to (d) and Annex II.2 of the TEN-E Regulation are eligible for grants for works if they meet the criteria specified in Article 14.2, notably having received a cross border cost allocation decision pursuant to Article 12.
Article 12.9 stipulates that projects which have received one of the following exemptions cannot apply for cross-border cost allocation decision and therefore cannot apply for grants for works:
(a) an exemption from Articles 32, 33, 34 and Article 41(6), (8) and (10) of Directive 2009/73/EC pursuant to Article 36 of Directive 2009/73/EC;
(b) an exemption from Article 15(6) of Regulation (EC) No 714/2009 or an exemption from Article 32 and Article 37(6) and (10) of Directive 2009/72/EC pursuant to Article 17 of Regulation (EC) No 714/2009;
(c) an exemption under Article 22 of Directive 2003/55/EC; or
(d) an exemption under Article 7 of Regulation (EC) No 1228/2003.
However, PCIs that have received any of the above exemptions are eligible to receive CEF Energy funding for studies and can benefit from other financial instruments according to Article 14 of the TEN-E Regulation.
Read it on the EU portal ↗Answered 19 Apr 2023
Yes. An affiliated entity of the project promoter can be part of an application. Please note however that the proposal cannot be sent only by the affiliated entity (the project promoter needs to be part of the application).
If the affiliated entity is the sole implementer of the project, it is also subject to operational capacity and financial capacity assessment. The proposal should also explain how the cooperation will be organised and how the project promoter will be involved in the proposal.
To be an affiliated entity, a capital or legal link to the beneficiary needs to be demonstrated. A capital link is:
- direct or indirect control of the beneficiary
- under the same direct or indirect control as the beneficiary or
- directly or indirectly controlling the beneficiary.
This covers not only the case of parent companies or holdings and their ‘daughter’ companies or subsidiaries and vice-versa, but also the case of affiliates between themselves (e.g. entities controlled by the same entity). ‘Sister’ companies must have the necessary capital link to be one the beneficiary and the other its affiliated entity. It is not necessary that the parent company is also part of the grant agreement.
Read it on the EU portal ↗Answered 10 Sept 2026
The agreement should be provided by the concerned Member States, meaning the Member States where the action is being implemented and that will be impacted by the outcome of the action. In the case of works or studies being implemented in two or more Member States, all of them have to provide agreement. If a study (also including feasibility or desktop study) or works is being implemented in one Member State only, then only the agreement of that concerned Member State is required.
Read it on the EU portal ↗Answered 23 Jun 2026
The objective of the information required is to assess the proposed project’s capacity to be financed through the national tariff system on an incremental basis (i.e. comparing the scenarios with and without the project, and with and without CEF grant). The information provided in Section 4.2 of Part B of the application form should thus include:
If the project revenues are based on fees which are not regulated (e.g. user fees for CO2 networks), or there are other revenues which do not come from regulated tariffs, the information provided in Section 4.2 of Part B of the application form should include detailed information on those as well, explaining the projected volumes and, separately, the projected level of prices for user fees, with and without CEF grant. In the Business Plan financial spreadsheet, applicants explain where possible the contractual background, including information on established or expected commercial contracts (duration, volumes and prices, if available) or savings that the project may generate.
Read it on the EU portal ↗Answered 11 Jun 2026
The promoter has to sign and submit the TEN-E compliance form (Compliance with EU Law on Energy Infrastructure). In case of multiple applicants/beneficiaries, it is preferably to submit a single form in relation to the project, where the data for each promoter is included for the given PCI/PMI or PCIs/PMIs.
Read it on the EU portal ↗Answered 30 Apr 2026
As explained in Section 7 of the call document, the annual activity reports are requested in order to verify the operational capacity of the applicants, i.e. in order to demonstrate that applicants “have the know-how, qualifications and resources to successfully implement the projects and contribute their share (including sufficient experience in projects of comparable size and nature).”Annual activity reports are requested from all applicants / potential beneficiaries of the proposal, except for “Public bodies, Member State organisations, transmission system operators certified under Directives 2019/944 (EU) or 2024/1788 and international organisations”, which are exempted from this requirement. The Annual activity report should be the activity report of the applicant organization for the previous year. It should be the regular activity report prepared for the board, shareholders, public etc., not something specifically prepared for this proposal.
Read it on the EU portal ↗Answered 30 Apr 2026
Entities from countries associated to the CEF Programme or countries which are in ongoing negotiations for an association agreement and where the agreement enters into force before grant signature are eligible for funding (see list of participating countriesPDF).
Entities from other countries (not listed above) are exceptionally eligible if the granting authority considers their participation essential for the implementation of the action.
Special rules apply for certain entities (e.g. entities subject to EU restrictive measures under Article 29 of the Treaty on the European Union (TEU) and Article 215 of the Treaty on the Functioning of the EU (TFEU) and entities covered by Commission Guidelines No 2013/C 205/05). Such entities are not eligible to participate in any capacity, including as beneficiaries, affiliated entities, associated partners, subcontractors or recipients of financial support to third parties (if any).
For PMIs, applications should demonstrate under the “priority and urgency of the action” criterion that the inclusion of a third country entity is indispensable to achieve their objectives.
Read it on the EU portal ↗Answered 30 Apr 2026
The procurement and tendering rules are explained in the Model Grant Agreement, Article 6 ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS: mga_cef_en.pdfPDF
Read it on the EU portal ↗Answered 30 Apr 2026
There is no maximum percentage of subcontracting accepted or recommended in a proposal or by task. It is up to applicants to define what part of the action tasks will need to be subcontracted.
Read it on the EU portal ↗Answered 30 Apr 2026
This depends on the procedure and how the action tasks are organised. Please make sure that public procurement requirements are fulfilled, if applicable. The affiliated entity must be part of the grant agreement in order for its costs to be eligible.
Read it on the EU portal ↗Answered 30 Apr 2026
That section should include information on cooperation between promoters and the organisation of the project, so even if there is no formal consortium established, please provide information on the project participants. There is no obligation to have a consortium in this Call.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes. The requirement to demonstrate financial and operational capacity applies to all applicants and affiliated entities (if they act as sole implementers), except for the categories set out in Section 7 of the call text. The need to demonstrate operational and financial capacity does not apply to transmission system operators certified following the procedures laid down in Articles 52 or 53 of Directive 2019/944 (EU), or Articles 71 or 72 of Directive 2024/1788 and Joint Undertakings established in the EU which qualify as public bodies.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, a CBCA decision issued by the national regulatory authorities from the EU Member States impacted by the project is required for applications for a CEF Energy grant for works, according to Articles 16 and 18 of the TEN-E Regulation.
Read it on the EU portal ↗Answered 30 Apr 2026
Compliance with EU law (e.g. environment, competition, energy infrastructure, procurement) has to be ensured in EU Member States, where EU Directives and Regulations are applicable. For third countries, where EU legislation does not apply, national legislation on the subject will be applicable and needs to be complied with.
Read it on the EU portal ↗Answered 30 Apr 2026
This is under the discretion of the applicant. In the WP description, it should be clear what applicants plan to do under each WP, e.g. construction of a line, completion of a study, tender, etc. Please also consider future reporting and what would be the logic structure of WPs from the reporting point of view, throughout the lifecycle of the project. See also guidance in Application form Part BPDF 6.2 Work packages and activities. Also make sure that the presentation of the submitted budget by work package matches the presentation of the budget by cost category.
Read it on the EU portal ↗Answered 30 Apr 2026
In the case of an Action taking place entirely outside of the European Union, applicants need to provide proof of the agreement of the EU Member State(s) concerned by the PCI/PMI to which the Action relates. For instance, agreement of the Member State for which the related PCI/PMI or PCI/PMI cluster has a significant cross-border impact and/or who supported the inclusion of the candidate project into the PCI/PMI list should be provided.
Read it on the EU portal ↗Answered 30 Apr 2026
The agreement by the third country is not required to be submitted as part of the CEF-E-PCI-PMI application.
The application formPDF (Section 4.1. Social, environmental and other impacts, question on Cross-border dimension) should however clearly explain how the cooperation between the project promoter and the third country takes place.
Read it on the EU portal ↗Answered 30 Apr 2026
The working language of the programme is English, so it is strongly recommended that key supporting documents (e.g. Letter of Support, Environmental compliance file, cost-benefit analysis, business plan, cross-border cost allocation decision) requested in the application form are also provided in English.
Where the original language of the document is in a different language, it is strongly recommended that the applicant provides a translation. A certified translation is not necessary.
Annual activity reports may be submitted in original language with a short English summary.
Read it on the EU portal ↗Answered 30 Apr 2026
The list of CEF Energy Member State Contact Points is available here: energy.ec.europa.eu
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, provided that the Procurement procedures are in line with the requirements of the Grant Agreement and the costs are incurred and registered in the accounts within the eligible period of the grant agreement (after its start date). However, the costs related to the preparation of the tender, e.g. preparation of documents, etc., are not eligible if procurement took place before the project start as per GA.
Read it on the EU portal ↗Answered 31 Jul 2026
There is no rule in CEF against subcontracting with a legal entity that has capital links with the beneficiary, as long as the public procurement directives (if applicable) and the principle of sound financial management are respected in the tender procedures.
Please note, however, that it is not possible to cross-invoice between entities in the Grant Agreement.
Read it on the EU portal ↗Answered 1 Jul 2026
In principle that would be eligible under a studies proposal, not under a works proposal, unless the preparation and obtainment of such project documentation is part of a turnkey construction project where the preparation of such documentation is carried out as part of the construction works. Moreover, if the preparation of such documentation takes place before the start of construction works, costs are outside the eligibility period of the project and therefore not eligible under the works proposal.
Read it on the EU portal ↗Answered 15 May 2026
In grants for works, a cost category exists for costs for studies. Under this call, a works action may not include studies and therefore costs for studies are not eligible under the works topic. This has no implication for proposals under the studies topic.
Read it on the EU portal ↗Answered 13 May 2026
No. The TEN-E Regulation does not include among eligible categories CO2 storage assets. Only surface and injection facilities associated with them (Annex II. (5)(c) are eligible. Therefore, only such elements are eligible in relation to CO2 storage facilities
Read it on the EU portal ↗Answered 30 Apr 2026
Ancillary costs, such as site preparation, delivery, and installation costs could be considered eligible equipment costs if these costs are accounted as capital expenses as part of the cost of bringing the fixed asset into use and included in the amount to be depreciated.
Read it on the EU portal ↗Answered 30 Apr 2026
Works, including those related to excavation, are considered subcontracting when there is a contract with an external contractor (third party) to carry out the works.
See also FAQ ID 17690 ec.europa.eu
Read it on the EU portal ↗Answered 30 Apr 2026
This depends on whether the infrastructure element is considered as equipment necessary for the project implementation or part of the infrastructures to be constructed (part of the project itself). If it is an output/deliverable of the project, the beneficiary which is constructing the infrastructure will normally own it and costs will be eligible. If it is considered as equipment or material, it has to be necessary for implementing the action and its purchase included in the project budget, in order to be eligible as a project cost.
Read it on the EU portal ↗Answered 30 Apr 2026
Travel should be considered as travel – ticket and subsistence allowances – irrespective of its purpose. Equipment is on the other hand the necessary tools, machines or material to carry out the project, directly purchased, not the travel linked to the purchase or maintenance.
Read it on the EU portal ↗Answered 30 Apr 2026
There is no relationship, both are independent. Usual purchasing practices, following sound financial management principles and respecting applicable procurement rules, are allowed, irrespective of the requested EU contribution percentage.
Read it on the EU portal ↗Answered 30 Apr 2026
It is not possible to apply for funding for the same action or activities, in order to exclude any double funding, but it is possible to apply for funding for a different activity or different part of the PCI.
Read it on the EU portal ↗Answered 30 Apr 2026
This depends on how you have defined this in the Work Package. Project dissemination costs may be eligible, if defined in the grant agreement and necessary for the implementation of the project. It is up to applicants to define which entity is executing the task and incurring such costs.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, provided that the procedures are in line with the requirements of the Grant Agreement and the costs are incurred and registered in the accounts within the eligible period of the grant agreement (after its start date).
However, the costs related for example to the preparation of the tender, e.g. preparation of documents, etc., are not eligible if procurement took place before the project start as per GA. Please verify as well if applicable procurement rules allow amendments of contracts already signed, and under what scope and conditions.
Read it on the EU portal ↗Answered 30 Apr 2026
CEF Energy as per definition of “Works” in the TEN-E/CEF regulations co-funds works only until commissioning. Therefore, the costs for OPEX, including insurance costs, penalties, buying of energy, personnel cost and other costs during the operation of the battery are not eligible for funding.
Read it on the EU portal ↗Answered 30 Apr 2026
The costs of electrical equipment manufactured in any third country and commissioned into an EU country may be considered eligible as long as all the other general and special conditions of eligibility of costs are met.
Read it on the EU portal ↗Answered 30 Apr 2026
No, since CO2 shipping is not covered by the TEN-E Regulation, these activities are not eligible under this call.
Read it on the EU portal ↗Answered 30 Apr 2026
For proposals selected for funding, the specific start date of the project will be set out in the Grant Agreement. The call document (section 10) states that the earliest possible date for such project start date (for incurred costs to be eligible) is the proposal submission date.
Read it on the EU portal ↗Answered 30 Apr 2026
The system allows you technically only to choose a funding rate of either 50% or 75%, which are hardcoded in the system according to the call text provisions and cannot be changed. The system will then automatically calculate the maximum EU contribution possible based on the total estimated costs and the chosen funding rate. However, in a second step each applicant has to manually encode in the actually requested co-funding amount into “Requested EU contribution to eligible costs/EUR”. This can be lower than the maximum amount calculated by the submission system. For example, if with 1000 EUR total costs and a 50% selected funding rate, after encoding your costs, the system calculates you a “Maximum EU contribution to eligible costs/EUR” of 500 EUR, you can still fill in 400 EUR into “Requested EU contribution to eligible costs/EUR”, corresponding to an actual 40% funding rate. Remember though that any funding rate above the standard 50% has to be duly justified according to the Call conditions.
Read it on the EU portal ↗Answered 30 Apr 2026
No, there is no minimum size regarding the requested CEF financial contribution and/or total budget for proposals submitted under the CEF Energy Programme.
Read it on the EU portal ↗Answered 30 Apr 2026
No. There is no need to have an investment request or a CBCA decision to apply for grants for studies. This requirement is only for applications for works, when applicable (PCIs and PMIs falling under categories set out in Article 24 and in point (1)(a), (b), (c), (d) and (f) of Annex II and point (3) of Annex II of the TEN-E Regulation (EU) 2022/869).
Read it on the EU portal ↗Answered 30 Apr 2026
The CEF Regulation (EU) 2021/1153 of 7 July 2021 establishes in its Article 10.2 that actions eligible in accordance with its Article 9 may include synergetic elements relating to any of the other sectors (…) provided that they comply with all of the following requirements: (a) the cost of the synergetic elements does not exceed 20 % of the total eligible costs of the action; (b) the synergetic elements relate to the transport, energy or digital sector; and (c) the synergetic elements enable the socioeconomic, climate or environmental benefits of the action to be significantly improved. Such synergetic elements should be described in Section 1.4 of application form BPDF and the cost thereof should be indicated as part of the budget table per budget categories. No specific examples are provided in the CEF Regulation, but they could relate to assets allowing synergies between the energy sector and the transport sector (as co-funded under the CEF-Synergy call for proposals held in 2016) or with the digital sector.
Read it on the EU portal ↗Answered 30 Apr 2026
No. According to Article 15(3) of the CEF Regulation (EU) 2021/1153, for works proposals the co-financing rate may be increased to a maximum of 75% for Actions contributing to the development of projects of common interest which, based on the evidence referred to in Article 18(2) of the TEN-E Regulation (EU) No 2022/869, provide a high degree of regional or Union-wide security of supply, strengthen the solidarity of the Union or offer highly innovative solutions. This applies to energy infrastructure categories set out in Article 24 and in point (1)(a), (b), (c), (d) and (f) of Annex II and point (3) of Annex II of the TEN-E Regulation. This does not apply to smart electricity grids and to smart gas grids.
Read it on the EU portal ↗Answered 30 Apr 2026
It is not possible for the project promoters to apply for grants for works for projects of common or mutual interest if the cross-border cost allocation decision (CBCA) decision from the concerned NRAs (or ACER) is still pending. Furthermore, CEF funding may be allocated to a works proposal only if the PCI/PMI promoter(s) can demonstrate its non-commercial viability. Applicants for CEF funding should demonstrate, inter alia, that incentives received through the existing regulatory framework are not sufficient. Therefore, project promoters should take into account the conclusion of the concerned NRA(s) regarding the measures to cover the costs before they submit a request for CEF funding in the form of grants.
Read it on the EU portal ↗Answered 30 Apr 2026
No, costs for acquisition of property rights and easement are not eligible.
Read it on the EU portal ↗Answered 30 Apr 2026
In principle, such a project may receive a CEF Energy grant for works. The absence of costs-sharing between concerned Member States or project promoters will be assessed during the evaluation.
Read it on the EU portal ↗Answered 30 Apr 2026
All projects must demonstrate that the potential overall benefits outweigh the costs, as stipulated in Article 4.1.b of the TEN-E Regulation as one of the three general criteria applicable to projects of common interest for their inclusion in the PCI and PMI list. For applications to the CEF-E-PCI-PMI call, the CBA and business plan are required as mandatory documents for works proposals (except for smart electricity grids, smart gas grids and carbon dioxide applications, which only need to provide the business plan and other assessments carried out to prove the existence of positive externalities).
Read it on the EU portal ↗Answered 26 Apr 2024
In each case the declaration should be filled in, but the level of detail can be different. The declarations reflect the current state of play of your project. Applicants need to mention in the form if an EIA has already been carried out.
Read it on the EU portal ↗Answered 9 Jul 2026
If the Action involves works or any type of physical intervention, the competent authority in the Member State in question needs to sign the declaration for monitoring of NATURA 2000 sites to certify that there is no impact on NATURA 2000 areas. The authority that needs to sign the Declaration on NATURA 2000 is the national authority responsible for the monitoring of NATURA 2000 areas under national law. This is not necessarily the Ministry which is supporting the submission of the application in Letter of support. The designation of the responsible authority for NATURA 2000 falls under the responsibility of each Member State.
Read it on the EU portal ↗Answered 22 Jun 2026
The European Commission and CINEA follow a strict policy of equal treatment of all applicants. Therefore, individual advice to the potential applicants on the preparation of their proposals is not available. General questions about the call and submission process can be sent to the call helpdesk: CINEA-CEF-ENERGY-CALLS@ec.europa.eu.
Please note, however, that questions which are specific to a particular proposal and where the answer would provide a comparative advantage to the applicant will not be answered.
Read it on the EU portal ↗Answered 11 Jun 2026
Even if your proposed Action takes place exactly on the line of a PCI/PMI, you must indicate a location (e.g. a line or a polygon notably to locate the PCI/PMI section to which the Action relates) in the interactive map editor. You will not be able to submit your proposal otherwise. Uploading an additional map in the "Supporting documents" section is also possible but it is not mandatory, as the data you provide in the map editor is sufficient.
Read it on the EU portal ↗Answered 11 Jun 2026
The TEN-E Regulation explicitly refers to "a business plan evaluating the financial viability of the project" and requires that "if a project is promoted by several project promoters, they shall submit their investment request jointly". Therefore, one business plan should be prepared for each PCI/PMI.
Read it on the EU portal ↗Answered 11 Jun 2026
There is no business plan template as such provided. A financial spreadsheet template is provided, but it is optional (not mandatory). It is not obligatory to use our template, you can use another one. Applicants need to make sure the information is updated and reflects the latest status of your project.
Read it on the EU portal ↗Answered 30 Apr 2026
The applications related to smart grids PCI/PMIs shall contain information about the specific technologies to be implemented in the project description (section 0), inter alia type of technology, applicability, aimed outcome and expected location. Likewise, the contribution of the project to achieve any of the CEF-Energy policy objectives (integration of an efficient and competitive internal energy market, interoperability of networks across borders and sectors, decarbonisation of the economy, promoting energy efficiency and ensuring security of supply) shall be quantified when possible in the section 4.1 (Social, environmental and other impacts) of the application form.
Read it on the EU portal ↗Answered 30 Apr 2026
As stated in the call document, it is considered that the EU added value of a project has already been demonstrated by its inclusion in the PCI / PMI list. Therefore, the justification of the EU added value of the PCI/PMI as such does not need to be repeated. Applicants should reply to this question from the point of view of the studies or works specific proposal in order to realise the PCI/PMI.
Read it on the EU portal ↗Answered 30 Apr 2026
Annexes can only be uploaded in the format defined on the Portal:
Read it on the EU portal ↗Answered 30 Apr 2026
Yes. These documents are needed for the operational capacity check which is applicable to Distribution System Operators (DSO).
Only public bodies, Member State organisations, transmission system operators (TSOs) certified under Directives 2019/944 (EU) or 2024/1788 and international organisations are exempted from the operational capacity check and therefore from the obligation to submit such annual reports.
Read it on the EU portal ↗Answered 30 Apr 2026
There is no maximum requested EU contribution or suggested one. Please make sure that your proposal includes sufficient justification for the estimated costs and requested CEF-Energy funding and the budget is appropriately sized for the envisaged work packages and tasks.
Read it on the EU portal ↗Answered 30 Apr 2026
Please list and briefly describe the authorisations and permits which will be necessary for the implementation of the project. If dates for obtaining them are not known yet, please include whatever information is available at the time of the proposal, even if it would be an estimate.
Read it on the EU portal ↗Answered 30 Apr 2026
A request for CEF funding may be submitted before or after the FID is taken. There are no specific requirements regarding the timing of the FID.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, in principle it is possible to include activities relating to the study which affect an electricity substation lying along the path or at either end of a high voltage (HV) line which is on the PCI and PMI list, provided that such substation is part of the technical description of the PCI/PMI.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes. In principle, there are no restrictions to the number of applications to be submitted for the same PCI/PMI, therefore it is possible to submit two applications – whether for works+studies or studies+studies - relating to the same PCI/PMI under the same call for proposals.
Please note, however, that all proposals will be assessed against the award criteria and notably the criterion on maturity of the action with regards to the developmental stage of the project, based on the PCI/PMI implementation plan.
Read it on the EU portal ↗Answered 30 Apr 2026
If the construction and operation of such an installation is not research-related, but part of the preparatory studies necessary to carry out further design and design studies for the implementation of a PCI/PMI, such costs may be included in a studies proposal. The proposal should explain the need for such installation and justify its relation with the PCI/PMI implementation.
Read it on the EU portal ↗Answered 30 Apr 2026
If the two PCIs/PMIs in a cluster are complementary (such as an interconnector and an internal line) and are in a similar stage of development, we strongly recommend submitting a joint application. In the application, both PCIs/PMIs to which the proposal relates should be clearly identified by means of selecting the relevant PCIs/PMIs from the drop-down list in application form part A. However, if the two PCIs/PMIs are in different stages of development or maturity, we recommend submitting two separate applications.
Read it on the EU portal ↗Answered 30 Apr 2026
The section is applicable for both, but the information to be provided is different. For studies, applicants need to provide information on the overall financial situation and maturity of the project. For works, applicants need to provide additional information regarding the type of project finance, financial ratios (internal rate of return, financial net present value) and financial model.
Read it on the EU portal ↗Answered 30 Apr 2026
No, all supporting documents have to be attached to the application in the Funding & Tenders Portal.
Should CINEA nevertheless receive any documentation outside the portal, it will not be taken into consideration. In order to ensure transparency and fair treatment of all proposals, each proposal will be assessed and evaluated on its own merits, based on the information that it contains.
Read it on the EU portal ↗Answered 30 Apr 2026
A grant may be awarded for an action that has already begun, provided that the applicant demonstrates the need for starting the action prior to signature of the grant agreement, but no costs can be reimbursed for activities that took place before the starting date, which cannot be earlier than the proposal submission date.
The action should be mature, meaning that it should be ready to start in the short term. As stated in the call text, the maturity of the action is one of the award criteria against which each proposal will be assessed (section 9 of the call document).
Read it on the EU portal ↗Answered 30 Apr 2026
The Environmental compliance file and the TEN-E compliance file should be submitted also for studies without physical intervention.
Read it on the EU portal ↗Answered 30 Apr 2026
If the CBA and business plan have changed or have been updated since the investment request submitted for the CBCA Decision, then both versions, the old and the newly updated, should be provided, if possible combined into a single file.
Read it on the EU portal ↗Answered 30 Apr 2026
No. However, please note that, according to Article 9.7 of the TEN-E Regulation (EU) 2022/869, the project promoter, or, where national law so provides, the competent authority, has to establish and regularly update a dedicated website with relevant information about the project of common interest, which shall be linked to the Commission website and the transparency platform referred to in Article 23 and which shall meet the requirements specified in point (6) of Annex VI. Commercially sensitive information shall be kept confidential. Project promoters shall also publish relevant information by other appropriate information means to which the public has open access.
Read it on the EU portal ↗Answered 30 Apr 2026
If several project promoters are involved in the implementation of the proposed action and will be incurring costs in connection with it, they should all be included as applicants in the proposal. In this case, it is mandatory to designate a coordinating applicant.
In case only one project promoter will be involved in the implementation of the proposed action and incurring costs in connection with it, the application should clearly explain how cooperation between the project promoters will be ensured. It is not necessary to include a formal delegation of the responsibility by the other project promoters in the application, but it is recommended to demonstrate how the cooperation between the project promoters will be ensured, as part of the information provided in the application forms.
Read it on the EU portal ↗Answered 31 Jul 2026
Studies with physical interventions are studies that imply interventions such as destructive tests, excavations, etc. aimed to define and develop a project fully and decide on its financing or final design. Typically, laboratory tests or tests of similar nature that have no impact on soil, air or water, would not be considered as having physical interventions. Additional examples of "physical interventions" can also be found in the Annex I and II of the EIA DirectivePDF.
It is the responsibility of the applicant(s) to determine the nature of the submitted action and work packages in light of the applicable definitions.
Read it on the EU portal ↗Answered 17 Jul 2026
Applicants must demonstrate the commercial non-viability of a project on the basis of the mandatory documents that are requested in the case of grant application for works where applicable: cross-border cost allocation (CBCA) decision, business plan and cost-benefit analysis (CBA).
For PCIs and PMIs falling under the categories set out in point (1)(e) and points (2) and (5) of Annex II of the TEN-E Regulation and for electricity storage projects falling under the category set out in point (1)(c) of Annex II of the TEN-E Regulation that are not regulated, applicants should demonstrate the lack of commercial viability via an evaluation carried out by the relevant national authority or, where applicable, the national regulatory authority.
Read it on the EU portal ↗Answered 11 Jun 2026
A combination of CEF and national funding is possible provided that the two sources of funding do not finance the same costs and do not exceed the total eligible costs of the action. Applicants must indicate the sources of funding for the project in the proposal, under Part B section 2.3 ‘Financial maturity’, so that CINEA can analyse the combination of funds. The applicant should provide information on the national funding and clearly explain that it is national funding and not an EU fund that is distributed by the Member state.
Please also read FAQ 16802 on state aid rules.
Read it on the EU portal ↗Answered 11 Jun 2026
There is no earmarking of funds or prioritization of any specific project category. The evaluation is a comprehensive assessment taking into account the objectives of the call and evaluating all proposals on an equal basis with respect to the award criteria. As indicated in the call text, in line with article 3(2)(b) of the CEF Regulation (EU) 2021/1153, this call for proposals puts priority on technologies and PCI/PMIs contributing to the decarbonisation of the economy. The indicative budget is also indicated in the call text, while a certain budget flexibility is possible within the multiannual work programme.
Read it on the EU portal ↗Answered 30 Apr 2026
There is no obligation to stick to the exact scope of a previous feasibility study carried out for the PCI. However, the result of previous studies would normally be taken into account when defining further stages of the project. Furthermore, we will also look at any previous studies funded by CEF or other EU funds to make sure that there is no double funding.
See also: ec.europa.eu
Read it on the EU portal ↗Answered 30 Apr 2026
These are two different but related things. Deliverables are the project outputs, the main results of the action activities, e.g.: documentation for the detailed Environmental Impact Studies, engineering design study, commissioning of the transmission line.
Means of verification are on the other hand proof of completion of milestones and are meant to allow checking the action progress, e.g.: written notification of the contractor to the beneficiaries, publication of the tender notice in the OJEU, Contractor's progress report approved. The list of means of verification of an action may include deliverables, if they allow to measure progress or completion of milestones, but not necessarily.
Read it on the EU portal ↗Answered 30 Apr 2026
The number of milestones per work package will depend on the complexity of each work package. There is no maximum established for the call. As a rule of thumb, each work package should have at least two milestones, one at the start and one at the end. In Work packages that last more than a year, there should ideally be at least one milestone every 12 months.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes. Please check also:
Read it on the EU portal ↗Answered 30 Apr 2026
Such an entity may apply if the eligibility criteria related to the applicant and the project as described in the work programme and in the call for proposals are met, i.e. the company is involved in the implementation of an action related to one of the projects of common interest on the PCI list and it obtained the agreement of the concerned Member State.
Read it on the EU portal ↗Answered 30 Apr 2026
First, it should be noted that, in order to be eligible for grants for works, the project should provide significant positive externalities (such as security of supply, system flexibility, solidarity or innovation). As to the analysis, it is the project promoters' own calculation. Information should be included in the project-specific cost-benefit analysis (CBA) consistent with the methodology drawn up pursuant to Article 11 of the TEN-E Regulation, in the business plan and other assessments, carried out notably by possible investors or creditors or the national regulatory authority. The CBA should demonstrate the existence of significant positive externalities by the country concerned, including their (monetary) quantification.
Read it on the EU portal ↗Answered 30 Apr 2026
Concerned national regulatory authorities shall coordinate and come up with one CBCA decision. If they cannot agree on one coordinated decision within six months of the date on which the request was received by the last national regulatory authority concerned, they should refer the question to ACER (Agency for the Cooperation of Energy Regulators) (see Article 16(7) of the TEN-E Regulation).
Read it on the EU portal ↗Answered 30 Apr 2026
Applicants need to demonstrate positive externalities in their project specific cost-benefit analysis drawn up pursuant to Article 16(4), point (a), of the TEN-E Regulation. They should provide evidence concerning the existence of significant positive externalities, such as security of supply, system flexibility, solidarity, or innovation.
The existence of significant positive externalities is one of the eligibility criteria for grants for works. Applicants for Works proposals have to provide information on positive externalities as part of the application form BPDF, under the Impact criterion.
Read it on the EU portal ↗Answered 30 Apr 2026
This is up to the applicant. Please consider who is carrying out the different WPs, for example, if it is the same contractor or a different one, if there are one or several procurements, etc.
Read it on the EU portal ↗Answered 30 Apr 2026
It is up to the applicant(s) to define the milestone or task that starts the project. Typically, the start of a works project is not the kick-off of the physical construction, as there are usually preceding phases, e.g. tendering of contractors, supply of material, etc., which could be part of the application.
Read it on the EU portal ↗Answered 30 Apr 2026
In principle yes, unless the CBCA decision itself contains a validity date or a provision on the need to revise it under certain conditions, or is not applicable anymore due to relevant changes in the project characteristics, costs, benefits, etc. The TEN-E Regulation does not provide for the expiration of a CBCA decision, nor does it for its revision. In line with Article 16(3) of the TEN-E Regulation, project promoters shall keep all concerned national regulatory authorities (NRAs) regularly informed (at least once per year until the project is commissioned) of the progress and the identification of costs and impacts associated with it. However, relevant changes to the project, which are likely to have an effect on the CBCA decision (e.g., cost overruns or changes in benefits), should be notified to the concerned NRAs. In particular, if the CBCA decision was prepared on the basis of a cost-benefit analysis which is not in line with the latest CBA prepared in the framework of the PCI/PMI selection process or is not consistent with ENTSO-E/ENTSOG methodology, the CBCA Decision may need to be updated. NRAs should confirm in such case whether the CBCA Decision remains applicable in its current terms, or it needs to be revised or updated.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, state aid rules apply. In the Application form Part B, Section 2.2, you are requested to provide information on state aid.
Read it on the EU portal ↗Answered 30 Apr 2026
After the call closure, statistics on the number of proposals received and the total requested funding will be available in the call updates on the call page in the EU Funding and Tenders Portal.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, if the CEF financial assistance is requested for different actions and these can be clearly defined and differentiated - such as a feasibility study and a detailed engineering study - it is possible to request grants for studies more than once for the same PCI/PMI, including under the same call.
Please note however that it is recommended that such studies are combined in the same proposal, if submitted under the same call for proposals.
Read it on the EU portal ↗Answered 30 Apr 2026
According to the conditions of the call, certified TSOs are exempt from demonstrating their financial and operational capacity. The date of the certification does not matter, as long as the certification decision is valid and no changes have taken place in the structure of the TSO that would require a new certification decision.
Read it on the EU portal ↗Answered 30 Apr 2026
This is at the discretion of the applicant. Please consider the guidance provided in the application form B, 6.2 Work packages and activities. However, note that the Part B has a page limit of 120 pages in total.
Read it on the EU portal ↗Answered 30 Apr 2026
CEF Energy may co-fund actions that are either studies or works. No mixed proposals, e.g. studies and works, can be co-funded. However, it is possible to submit more than one proposal related to the same PCI under this call. In such case, the activities of the two proposals must be clearly defined and cannot overlap.
The notions of studies and works are defined in Article 2 of Regulation (EU) 2021/1153 of the European Parliament and of the Council of 7 July 2021 establishing the Connecting Europe Facility.
See examples of actions already co-funded under CEF Energy.
Read it on the EU portal ↗Answered 30 Apr 2026
A maximum project end date of up to 31/12/2030 is indicated in the 2024 call document. There is no specific maximum duration for studies or works actions. However, please be aware that the maturity of the proposed project will be evaluated taking into account the planned end date of the envisaged tasks.
Read it on the EU portal ↗Answered 26 Apr 2024
A communication and dissemination plan is not required by the CEF-E-2026-PCI-PMI Call.
Beneficiaries must engage in communication and dissemination activities, namely:
Read it on the EU portal ↗Answered 11 Jun 2026
Technical deliverable such as inspection reports can be submitted in the national language, but we would request a short technical summary in order to be able to assess it.
Read it on the EU portal ↗Answered 30 Apr 2026
The coordinator must send the reports on the progress of the action for information also to the Member States concerned or provide them with access to the project in the Portal, so that Member States can verify the reports themselves. Member States do not need to certify any longer the reports. The final amounts paid to the actions will be published. The Commission and CINEA will inform the CEF Committee about any changes to the grant amounts during the lifetime of the actions.
Read it on the EU portal ↗Answered 30 Apr 2026
Yes, it is possible.CEF Energy grants take the form of a reimbursement of a percentage of eligible costs actually incurred. To be eligible, costs declared must comply with the eligibility criteria laid down in Article 6 of the model grant agreement.You may contract part of your Action's activities, in line with Article 9.3 of the model grant agreement.As regards the financial reporting during the Action's implementation, only eligible costs incurred for the implementation of the Action must be declared in the financial statement accompanying the cost claims, regardless of whether they are internal costs or external costs linked to contracting. The final amount of the CEF grant will be calculated on the basis of those costs found eligible. In any case, the grant will not exceed the maximum amount as specified in the Data Sheet (see Point 3) of the grant agreement. Indirect costs are not eligible under this call.
Read it on the EU portal ↗Answered 30 Apr 2026
A single application may be submitted in relation to two PCIs/PMIs in the same cluster, with all relevant project promoters listed as applicants. However, in this case an application leads to a single grant agreement covering the two PCIs/PMIs.
Read it on the EU portal ↗Answered 30 Apr 2026
In the case of a multi-beneficiary application, if the proposal is retained for funding, a multi-beneficiary Grant Agreement will be signed. Please note that the fact that parts of the Action to be exclusively implemented by one of the beneficiaries does not affect the liability regime under the Grant Agreement as defined under Article 22 of the model Grant Agreement and Data Sheet point 4.4 Recoveries. As regards the financial liability for recoveries (see Data Sheet point 4.4 Recoveries -Joint and several financial liability for recovery), the model Grant Agreement foresees several options. Please note that the option by default is option 1- limited joint and several liability of other beneficiaries — up to the maximum grant amount of the beneficiary.
Read it on the EU portal ↗Answered 30 Apr 2026
As stated in the Call text, the percentage range is 25-50%. This will be determined individually for each project according to the specific duration of the project. As a general principle, the pre-financing amount will be calculated as the amount of the maximum EU contribution, divided by the number of reporting periods and potentially diminished by a percentage.
Read it on the EU portal ↗Answered 30 Apr 2026
Applicants who need to prove their operational capacity should provide all the information that demonstrates the technical capability to successfully implement the action. This should include at least the annual activity report and proof of completion of previous projects and may include as well audited accounts if they provide additional evidence, but in principle, they are not necessary.
Read it on the EU portal ↗Answered 30 Apr 2026
Please note that there is a strict prohibition of double funding from the EU budget. If some activities have not been implemented under a previous grant agreement and no costs related to these activities were declared and reimbursed under this grant agreement, then they can be included as part of another proposed Action as long as they fulfil the criteria of the new call and if the previous grant has been closed.
Applicants are requested in the application form (section 8 Declaration) to declare if the project as a whole or any part of it have benefitted from any other EU grant and are (or will be) submitted for any other EU grants.
Double funding is considered as fraud to the EU budget, which may lead to an exclusion as described under Article 7 of the call text.
Read it on the EU portal ↗Answered 30 Apr 2026
As indicated in Article 16.2 of the model grant agreement, the granting authority does not obtain ownership of the results of the Action. However, as stated in the grant agreement (see Article 16.3), the granting authority has the right to use non-sensitive information relating to the action and materials and documents received from the beneficiaries (notably summaries for publication, deliverables, as well as any other material, such as pictures or audio-visual material, in paper or electronic form) for policy, information, communication, dissemination and publicity purposes — during the action or afterwards.
Read it on the EU portal ↗Answered 30 Apr 2026
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.