Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Based on projects the EU funded on the same subject in this programme.
22-EU-TC-RBGP Part VIII CRail Baltica - 1435 mm standard gauge railway line development in Estonia, Latvia and Lithuania (Part VIII)
CEF-T-2022-CORECOEN-RAIL-WORKS · 2023 · Official record ↗
24-EU-TC-RBGP Part X CRail Baltica - 1435 mm standard gauge railway line development in Estonia, Latvia and Lithuania (Part X C)
CEF-T-2024-CORECOEN-RAIL-WORKS · 2025 · Official record ↗
23-EU-TC-RBGP Part IX CRail Baltica - 1435 mm standard gauge railway line development in Estonia, Latvia and Lithuania (Part IX C)
CEF-T-2023-CORECOEN-RAIL-WORKS · 2024 · Official record ↗
24-EU-TG-DCM IMP 25-29Digital Capacity Management Implementation 2025-2029
CEF-T-2024-SIMOBGEN-REMIB-WORKS · 2025 · Official record ↗
23-FR-TG-GPSO-prepGPSO - Grand Projet du Sud-Ouest - studies and works to prepare the new high-speed line on the Atlantic corridor
CEF-T-2023-COREGEN-RAIL-WORKS · 2024 · Official record ↗
23-FR-TG-LNMP-CPDD1-CRD2New railway Line between Montpellier et Perpignan (LNMP) on the Mediterranean Corridor: climate proofed detailed design of Phase 1 and climate resilient design of Phase 2
CEF-T-2023-COREGEN-RAIL-WORKS · 2024 · Official record ↗
22-EU-TG-RE-AVIBUS-TELT-2Lyon – Torino base tunnel access: Upgrading of the rail historic line Bussoleno – Avigliana
CEF-T-2022-COREGEN-RAIL-WORKS · 2023 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
The objective of this call is to develop rail transport infrastructure projects on the TEN-T core[1] network.
Works and / or studies related to:
Priority will be given to projects fostering the development of high-speed rail in line with the Commission communication on high-speed rail [2].
Support will not be given to railway stations, except for railway infrastructure components. If the project includes such components, they shall be presented as a separate work package. Support will not be given to track side ERTMS deployment, electronic interlockings and/or Class A radio communication (5G/FRMCS/GSM-R) components. Support will not be given to activities related to the Class B systems nor to rolling stock.
Projects shall comply with the provisions of Directive (EU) 2016/797 [3] and with the related Technical Specifications for Interoperability. Where relevant, projects shall also be compatible with the alignment of operating procedures across borders to ensure the most effective use of the supported infrastructure.
In case a proposal combines studies and works components, these must address different sections / activities.
Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.
[1] For the purpose of this call, project proposals located on the extended core network are not eligible.
[2] COM(2025) 903 final of 5 November 2025.
[3] Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (OJ L 138, 26.5.2016, p. 44) which replaces Directive 2008/57/EC as of 31 October 2020.
1. Admissibility conditions: Proposal page limit and layout
described in section 5 of the call document.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible countries
described in section 6 of the call document.
3. Other eligibility conditions
described in section 6 of the call document.
4. Financial and operational capacity and exclusion
described in section 7 of the call document.
5a. Evaluation and award: Submission and evaluation processes
described section 8 of the call document and the Online Manual.
5b. Evaluation and award: Award criteria, scoring and thresholds
described in section 9 of the call document.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in section 4 of the call document.
6. Legal and financial set-up of the grants
described in section 10 of the call document.
Call document and annexes:
CEF-T-2026-CORECOEN
Application form templates
Standard application form — the application form specific to this call is available in the Submission System
Detailed budget table per WP
Letter of support/MS agreement
Timetable (Gannt Chart)
Simplified CBA calculator
Full CBA cash flow template
Environmental compliance file
Additional documents:
Amended Work Programme 2021-2027 - 5 June 2026
CEF Regulation 2021/1153
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Decision on unit costs for SME owners
Decision on unit costs for personnel (usual cost accounting practices)
Applicants asked the EU 25 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
A rail infrastructure project located on the TEN-T core network, addressing a cross-border link or a missing link, that is not included in Annex Part III, point 1 of the CEF Regulation 2021/1153, can be supported for funding.
Read it on the EU portal ↗Answered 17 Sept 2026
Concerning works projects, only the railway infrastructure components of a railway station are eligible for funding. A non-exhaustive list of railway infrastructure components of a railway station includes tracks, platforms (including access to the platforms) and any dedicated buildings where technical equipment necessary for railway operations or control is installed. Ancillary facilities and equipment such as taxi ranks, bus bays, car parks (including kiss & ride facilities) or road accesses to stations as well as passenger information systems and/or camera surveillance systems are not considered as part of the railway infrastructure components.
Concerning study projects, as it may be difficult to differentiate the part of the study related to the infrastructure component of the railway station from the part related to facilities for passengers, proposals that include elements related to these facilities are eligible when they are integrated into and form a smaller component of a railway infrastructure proposal.
In addition, it must be noted that the proposed railways infrastructure components cannot be related to the Class B systems and must be in line with the TSIs.
Read it on the EU portal ↗Answered 24 Aug 2026
No, studies/works covering the upgrading/modernisation of railway lines with a track gauge different from the European standard nominal track gauge (1435 mm) are not eligible for funding, unless they support the migration to the European standard nominal track gauge or are located in a Member State, or a part thereof, with a railway network detached from the Union main railway lines.
Read it on the EU portal ↗Answered 24 Aug 2026
Studies/works concerning railway infrastructure components related to maintenance workshop/rolling stock depots, including their railway connections to the core network are eligible for funding.
Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.
However, a proposal only focusing on railway infrastructure components related to maintenance workshop/rolling stock depots (including their railway connections to the core network) might be considered as a lower priority.
Read it on the EU portal ↗Answered 24 Aug 2026
Under the rail topic of CEF Transport 2026 calls, only rail infrastructure projects located on the core rail network, or connecting a core network inland and maritime port to the core rail network, are eligible for funding. The rail infrastructure (or any other type of infrastructure) located within the port area is not eligible under the calls.
Read it on the EU portal ↗Answered 17 Aug 2026
No. Light rail, such as tram or metro is not eligible for funding under the rail topics.
Read it on the EU portal ↗Answered 10 Aug 2026
As indicated in the “Information Note to the CEF Transport Coordination Committee” of 13/12/2018, “activities kept under existing Grant Agreements will not be funded under reflow calls and CEF 2 calls”.
This rule applies even if the original Grant Agreement which included the activities is now closed, unless the technical scope of these activities, and the corresponding grant amount, was removed from the Grant Agreement before its end date to allow the reuse of the unused CEF funding.
Read it on the EU portal ↗Answered 7 Jul 2026
Studies and works related to Traffic Control Centres (TTC) and/or Local Control Command and Signalling System Centres are eligible for funding. However, the Centres must be in line with the TSIs and cannot include any component related to Class B systems.
Read it on the EU portal ↗Answered 1 Jul 2026
Yes, in principle such an intervention would be eligible. However, if submitted as a standalone proposal, it might be considered as a lower priority.
Read it on the EU portal ↗Answered 29 Jun 2026
Yes, automatic track gauge changeover systems between countries with a different track gauge are eligible for funding. However, if submitted as a standalone proposal, they might be considered as a lower priority.
Read it on the EU portal ↗Answered 29 Jun 2026
Yes, Railway studies and works which also include a road component, such as a service road allowing the access to the railway infrastructure, during and after its construction for inspection or maintenance purposes, or other road elements directly resulting from the construction of the railway infrastructure or the removal of a level-crossing, are eligible for funding. However, the applicant should justify in the proposal that the concerned service roads are necessary for inspection or maintenance purposes and that the construction/reconstruction of the concerned road elements is a direct consequence of the rail intervention.
Read it on the EU portal ↗Answered 29 Jun 2026
No, funiculars are not eligible for funding.
Read it on the EU portal ↗Answered 29 Jun 2026
Under the CEF Transport Call, no support is given to activities related to Class B systems. Support is only given, under the rail topic, to TSI-compliant railway signalling systems.
Read it on the EU portal ↗Answered 29 Jun 2026
Electronic interlockings comprise a system processing digital input and output data to prevent conflicting train movements in a safe way, including i) Central Interlocking Unit (“Digital Interlocking”) based on a Central Processing Unit (CPU), ii) Interlocking Logic, set of rules and algorithms that govern the safe and permissible routes for train movements, iii) Signal box (or Interlocking shelter), a device next to railway tracks, providing interface between digital interlocking and railway equipment such as point machines, train detection devices, signals, etc., iv) Power cabling and optical fibre data cabling related with digital interlocking, v) Interface interlocking – Centralised Traffic Control (CTC), vi) Interface Radio Block Centre (RBC) – CTC, vii) Interface between Interlocking/RBC and/or interlocking/Traffic Management System. These elements, together with a detailed design of the interlocking are not eligible for funding under the CEF Transport, rail topics
Read it on the EU portal ↗Answered 29 Jun 2026
No, the rolling stock cannot be funded as part of a railway infrastructure proposal.
Read it on the EU portal ↗Answered 25 Jun 2026
Under the CEF Transport 2026 calls, all project components should be merged into a single CBA.
In the event that the full CBA requirement applies, one CBA report & cash flow template should be submitted, covering all works/activities included in the project.
In the event that the simplified CBA requirement applies, one simplified CBA calculator should be submitted covering all works/activities included in the project.
If the applicant decides to submit two separate project proposals, each covering a single investment, each proposal must include a cost‑benefit analysis (CBA), and the projects must be designated as twinned.
Read it on the EU portal ↗Answered 2 Oct 2026
Funding is strictly restricted to railway infrastructure components (e.g. substructure, superstructure, catenary, etc.). Transshipment equipment, whether mobile or stationary, and whether newly acquired, upgraded, or electrified, does not constitute a railway infrastructure component and is therefore not supported.
Read it on the EU portal ↗Answered 15 Aug 2026
Under the CEF transport Calls, no support is given to activities related to Class B systems. Support is only given, under the rail topic, to TSI-compliant railway signalling systems
Read it on the EU portal ↗Answered 29 Jun 2026
Under the rail topic of CEF Transport 2026 calls, if the scope of the proposal concerns a passenger railway line, it should be located on the TEN-T core passenger network. If it concerns a freight railway line, it should be located on the TEN-T core freight network. If the proposal concerns a mixed railway line (freight and passenger), it may be located on either the TEN-T core passenger or core freight network.
Read it on the EU portal ↗Answered 24 Sept 2026
Applicants must submit (upload) the Environmental Compliance File for all applications. For works applications and study applications with physical intervention, the ECF must be completed with (i) the environmental compliance questionnaire duly filled in, along with the requested information being applicable i.e. non-technical summary, and (ii) the declarations signed by the competent authority (i) for monitoring Natura 2000 sites and (ii) under the water framework directive 2000/60/EC.
Regarding study projects without physical intervention, and works projects that do not affect significantly the environment, the ECF must be uploaded by ticking the box of ‘project type’, and including in the comments boxes for each question ‘not applicable’. For these applications, no declarations signed by the competent authority are needed.
The works projects that do not affect significantly the environment concern applications for Single European Sky ATM Research (SESAR), Intelligent Transport Systems (ITS), VTMIS, RIS, telematics application systems, actions exclusively related to implementation of electric vehicles charging stations in existing build-up areas, solutions to improve accessibility for persons with reduced mobility, and vessels and rail rolling stock retrofitting.
Read it on the EU portal ↗Answered 9 Sept 2026
Under the 2026 call for proposals, the proposals submitted to the following calls are exempted from submitting a CBA:
For these calls, the submission system does not contain an upload slot for the upload of CBA documentation.
Read it on the EU portal ↗Answered 30 Jun 2026
Works connecting the TEN-T core network with core rail-road freight terminals can be supported for funding. While the call text explicitly highlights maritime, inland waterway, and air connections as primary priorities, connecting the TEN-T core network to core rail-road terminals still aligns with the main objective of addressing missing links on the TEN-T core network. However, the rail infrastructure (or any other type of infrastructure) located within the rail-road terminal area is not eligible under the calls.
Read it on the EU portal ↗Answered 27 Aug 2026
As set out in Section 6 of the call texts, twinned proposals are proposals relating to the same project that are submitted under different calls and/or topics. Where proposals form part of the same Global Project, this must be clearly indicated in Part B. However, proposals submitted under the same topic are not considered twinned proposals, even if they form part of the same Global Project. They will be evaluated as separate proposals.
Read it on the EU portal ↗Answered 15 Aug 2026
Only feasibility and prefeasibility studies also covering, on top of the future railway infrastructure components, the expected ERTMS, Class A radio communication (5G/FRMCS/GSM-R), interlockings deployment strategy are supported under the railway topic. Standalone final studies/executive design on ERTMS, Class A radio communication (5G/FRMCS/GSM-R), interlockings deployment being a final step before works commencement, as well as the works, are not supported.
Read it on the EU portal ↗Answered 30 Jul 2026
No. Section 2 of the call texts define which infrastructure elements can be supported. Synergetic elements are not supported under this topic.
Read it on the EU portal ↗Answered 8 Jul 2026
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.