Loading page...
Loading page...
This round is closed. Synced from the EU Funding & Tenders Portal on 9 November 2026.
Projects the EU funded under this call, with the organisation that led each one.
TRIDENTNext generaTion Resilient long-range European Counter-Battery system via heterogeneous Sensor fusion, AI-enhanced Decision support and firE coNTrol
Led by Thales Six Gts France SAS · France · 2026 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Expected Impact:The outcome should contribute to:
Objective:Given that artillery is still responsible for the vast majority of losses suffered by armies facing each other on the battlefield, this call topic aims to explore and mature the technologies required to destroy or neutralise all enemies’ artillery potential, thereby ensuring the survival of own forces and safeguarding their operational capacity.
Specific objective
In a changing geopolitical landscape, the armed forces of EU Member States and EDF Associated Countries face new and evolving threats. Artillery is responsible for 70% of combat losses. In this context, the ability to destroy or neutralise enemy artillery capabilities is vital to ensure the survival of land armies.
With the development of mobile manoeuvre concepts for field artillery (“shoot-and-scoot”) effective counter-battery fire has become increasingly more challenging as the required time from detection of enemy firing to own effect delivered in the target area might often exceed the time required for enemy formations to leave their firing positions. This is particularly a challenge at longer ranges, the tactical depth and farther, as the time of flight of our own munitions may pose a limitation on timely delivery of effect. It is therefore necessary to be able to detect and identify critical components of enemy artillery systems also in other postures than when firing.
This research topic aims at research of counter-battery capabilities, including detecting, locating, identifying, and communicating of the made observations.
Furthermore, capabilities to detect, locate and identify other enemy capabilities such as HQs, SHORAD, HIMAD, EW, FARP, logistics, etc. could be studied by opportunity through the R&T process.
Scope:The proposal must address:
The proposed technological solutions should present an optimal compromise on cost/performance.
Depending on the maturity of the technologies, it may also address other targets in tactical and operational depth.
Types of activities
The following types of activities are eligible for this topic:
Types of activities
(art 10(3) EDF Regulation)
Eligible?
(a)
Activities that aim to create, underpin and improve knowledge, products and technologies, including disruptive technologies, which can achieve significant effects in the area of defence (generating knowledge)
Yes
(mandatory)
(b)
Activities that aim to increase interoperability and resilience, including secured production and exchange of data, to master critical defence technologies, to strengthen the security of supply or to enable the effective exploitation of results for defence products and technologies (integrating knowledge)
Yes
(mandatory)
(c)
Studies, such as feasibility studies to explore the feasibility of new or upgraded products, technologies, processes, services and solutions
Yes
(mandatory)
(d)
Design of a defence product, tangible or intangible component or technology as well as the definition of the technical specifications on which such design has been developed, including partial tests for risk reduction in an industrial or representative environment
Yes
(optional)
(e)
System prototyping of a defence product, tangible or intangible component or technology
No
(f)
Testing of a defence product, tangible or intangible component or technology
No
(g)
Qualification of a defence product, tangible or intangible component or technology
No
(h)
Certification of a defence product, tangible or intangible component or technology
No
(i)
Development of technologies or assets increasing efficiency across the life cycle of defence products and technologies
No
Accordingly, the proposals must cover at least the following tasks as part of mandatory activities:
In addition, the proposals should cover the following tasks, as part of the optional activities:
Functional requirements
The proposed product and technologies should meet the following functional requirements:
The proposed product and technologies may meet the following functional requirements:
1. Admissibility Conditions: Proposal page limit and layout
described in section 5 of the call document
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in section 6 of the call document.
3. Other Eligible Conditions
described in section 6 of the call document.
4. Financial and operational capacity and exclusion
described in section 7 of the call document.
5a. Evaluation and award: Submission and evaluation processes
described section 8 of the call document and the Online Manual.
5b. Evaluation and award: Award criteria, scoring and thresholds
described in section 9 of the call document.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in section 4 of the call document.
6. Legal and financial set-up of the grants
described in section 10 of the call document.
Call document and annexes:
Call document (available shortly)
Application form templates
Standard application form (EDF) — the application form specific to this call is available in the Submission System
Detailed budget table (EDF RA)
Participant information (EDF)
List of infrastructure, facilities, assets and resources (EDF)
Actual indirect cost methodology declaration (EDF)
Ownership control declaration 
PRS declaration (EDF) 
Model Grant Agreements (MGA)
EDF, ASAP and EDIRPA MGA 
Additional documents:
EDF Annual Work Programme
EDF Regulation 2021/697
EDF Programme Security Instruction (PSI)
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment 
EU Grants AGA — Annotated Model Grant Agreement 
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 3 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
As a general principle, it is required that applicants use only the templates provided on the Funding & Tenders Portal. These templates have been designed in order to capture the information necessary to assess the eligibility of the proposal.
For development actions, as a derogation to this general principle, applicants may replace the following specific templates ‘harmonised capability declaration’ or ‘declaration on procurement intent and common specification’, with alternative forms such as a Letter of Intent (LoI) or a Memorandum of Understanding (MoU), if deemed more appropriate. From an evaluation standpoint, no difference will be made between the available templates and the alternative forms as long as they contain the same level of detail and information and are signed by the competent authorities.
For research actions, none of these above-mentioned templates are mandatory (not part of the eligibility nor the award criteria).
Read it on the EU portal ↗Answered 13 Sept 2025
In the “Tpl_Detailed Budget Table” under EDF-2025, when filling in the ‘Purchases’ section of the resource sheet(s) and running “Update content”, only the first line of the “travel and subsistence” is transferred to the Summary and Summary per Activity worksheets, while the added lines and the costs from ‘Equipment’ and ‘Other goods, works and services’ are ignored. What should I do?
Due to a technical issue, for cost category: “C.1Travel and subsistence” in the ‘resource’ sheets, please use only one row and do not use the function/button additional row. Adjust the number of trips, the costs and the description accordingly.
Read it on the EU portal ↗Answered 10 Oct 2025
Due to a clerical error an older version of the Ownership and Control Declaration template was available in some EDF 2025 topics. However, there is no significant difference between the different versions for EDF, so both versions can be used.
Read it on the EU portal ↗Answered 11 Sept 2025
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.