This round is closed. Synced from the EU Funding & Tenders Portal on 9 November 2026.
Projects are expected to deliver results aligned with the expected results set out below and to evidence their contribution through dedicated KPIs defined in the proposal. Expected results include:
Proposals shall define, baseline and track KPIs such as added throughput (e.g., tonnes/month of propellant powder or explosives; units/month of propulsion systems/warheads; filling lines output), time-to-rate, lead-time reduction, yield/quality improvements, qualified output delivered, reserved capacity parameters, numbers of staff trained, and indicators evidencing risk mitigation (e.g., raw-material securing measures, safety performance and compliance readiness, supply-chain robustness and obsolescence management outcomes).
Where implemented, the physical and cyber protection WP is expected to deliver measurable improvements in site and production security, evidenced through threat assessment protected sites to support the security measures and KPIs (e.g., coverage of protected areas/assets, detection/alert performance, response readiness, critical vulnerabilities mitigated). Those KPIs shall be linked to the project’s overall risk register and show how risk exposure is reduced and how production continuity is improved, thereby limiting the likelihood and/or impact of incidents that could delay production ramp-up or affect output and delivery reliability (including, where relevant, the availability of reserved capacity and the achievement of workforce-related milestones).
The objective of this call is to reinforce the EU industrial production capacity of defence products, including their components and corresponding raw materials.
This topic aims to strengthen the competitiveness, responsiveness and ability of the EDTIB to reinforce EU industrial production capacity for energetic components (including their components and corresponding raw materials insofar as they are intended or used wholly for the production of defence products) that constitute critical bottlenecks for key defence product across land, air, naval and underwater domains:
Actions shall be aligned with the objectives, scope and priorities of this call topic and shall contribute to the competitiveness of the EU defence technological and industrial base by securing specific production capacity for:
As industrial reinforcement actions, proposals shall integrate a robust approach to managing key risks (including safety, supply-chain and obsolescence, life-cycle and maintainability, and industrialisation) and shall, where relevant, take into account the necessity to include provisions allowing to upgrade quickly the targeted defence product based on the evolving lessons identified from the battlefield.
Applicants may include an optional dedicated Work Package (WP) implementing a supporting action as defined in Article 13(d) of Regulation (EU) 2025/2643, to reinforce the physical and cyber protection of the production capacity targeted by the action, including on security against UxS/drone-enabled threats. The objective is to reduce the risk of disruption, sabotage or interference affecting production continuity, ramp-up and deliveries, complementing the proposal’s overall risk-management approach (notably safety, supply-chain and obsolescence, industrialisation/integration, and maintainability risks) and supporting the achievement of the industrial KPIs set for lead time and capacity.
Proposals shall implement Industrial Reinforcement Actions, in line with Regulation (EU) SENSITIVE EN 11 EN 2025/2643, targeting the specific defence product and production capacities listed under “Objectives pursued”.
Proposals shall demonstrate the criticality of the targeted defence product and associated production capacity, and justify the urgency of reinforcing availability and security of supply through the proposed industrial reinforcement activities.
Proposals shall set out an industrial reinforcement plan supported by a risk-management approach that addresses the identified risks and the measures to ensure availability and security of supply, including risks specific to energetic materials (e.g. process safety, hazardous materials handling, permits, and upstream precursor availability).
Activities linked to the physical and cyber protection WP may include expert threat assessment, procurement, installation and initial integration of proportionate solutions as well as efforts to connect to a national or European security system for: (i) counter-UxS site protection measures (detection/alerting and other authorised protective measures), and/or (ii) cyber protection measures of production-relevant networks and systems (including monitoring, hardening and secure access) which includes obtaining the European Union Cybersecurity Certification (EUCC) schemes for products used in the IRA activity, as well as acceptance testing and operational set-up necessary for effective deployment, in order to work towards compliance with the NIS2 Directive, where applicable, and alignment with standards such as ISO/IEC 27001 and IEC 62443.
Where implemented, the physical and cyber protection WP shall clearly specify the protected assets, threat assessment for the to be protected sites to support the security measures, interfaces with production continuity and KPIs, explain how these measures reduce risks that could otherwise impact the delivery of the proposal’s core industrial results (e.g., lead-time reduction, throughput/capacity increase, reserved capacity where applicable, and workforce readiness) and present efforts to link the respective site’s security system with a national and/or European security system.
Actions shall not have started before 5 March 2024 and shall not have been completed before the signature of the Grant Agreement (GA). The duration and the starting date of the action will be set out in the GA. The action shall have an indicative duration of three to five years; in any event, it shall be completed no later than 31 December 2033.
Budget
The Commission is considering a total budget of EUR 166 400 000 for the call for proposals.
The maximum EU contribution per funded project will not exceed EUR 30 000 000 allowing several proposals to be funded.
The Commission is considering supporting specifically any optional work packages dedicated to the reinforcement of the physical and cyber protection of the industrial capacity targeted by the action, with a maximum EU contribution of EUR 500 000 per funded project.
Depending on the number and quality of received proposals and the requested Union financial contributions, the Commission may decide to reallocate budget between calls.
Minimum financial size of the actions
The minimum financial size of the action to be eligible for funding is EUR 2 000 000.
Maximum number of legal entities forming part of the consortium
The number of legal entities forming part of the consortium shall not exceed 15 as per Article 21(3)(c) of the Regulation (EU) 2025/2643.
1. Admissibility conditions: Proposal page limit and layout
described in section 5 of the call document.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible countries
described in section 6 of the call document.
3. Other eligibility conditions
described in section 6 of the call document.
4. Financial and operational capacity and exclusion
described in section 7 of the call document.
5a. Evaluation and award: Submission and evaluation processes
described section 8 of the call document and the Online Manual.
5b. Evaluation and award: Award criteria, scoring and thresholds
described in section 9 of the call document.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in section 4 of the call document.
6. Legal and financial set-up of the grants
described in section 10 of the call document.
Call document and annexes:
Call document
Application form templates
Application Form (EDIP and USI)
Detailed Budget Table (EDIP LS)
Participant Info (EDIP and USI)
List of Infrastructure, facilities, assets and resources (EDIP and USI)
Ownership Control Declaration
Procurement Strategy (EDIP and USI)
Model Grant Agreements (MGA)
EDF, ASAP, EDIRPA, EDIP and USI Lump Sum MGA
Additional documents:
EDIP Work Programme
EDIP Regulation 2025/2643
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 21 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
Repair and maintenance activities are not eligible when they constitute stand-alone operational support or routine in-service maintenance. However, such activities may be considered eligible where they directly contribute to an industrial reinforcement action.
Read it on the EU portal ↗Answered 2 Jun 2026
As indicated in the first call for proposals for IRA calls, Single applicants or consortia may apply. Consortia must not exceed 15 legal entities. SEAPs may participate alone or as part of a consortium. Proposals that include activities within the meaning of Article 12(1)(d) of the EDIP Regulation and where no SEAP participates must be submitted by consortia that are composed of at least 3 independent entities from 2 different EU Member States (only beneficiaries count; not affiliated entities). For more details, please refer to the call document, already available in the F&T portal.
Read it on the EU portal ↗Answered 7 Oct 2026
Information on the infrastructure, facilities, assets and resources used by subcontractors to perform the action should be included in the participants information document requested as part of the application file.
Read it on the EU portal ↗Answered 2 Jun 2026
Costs related to the construction or acquisition of buildings and infrastructure may be eligible where they are strictly necessary for the implementation of the industrial reinforcement action linked to the activities referred to in Article 12(1) of the EDIP Regulation. Such costs must be specifically justified and demonstrably linked to the project activities. Infrastructures, including general site infrastructures, that are not strictly necessary to enable the industrial reinforcement action will not be eligible for funding.
Read it on the EU portal ↗Answered 4 Jun 2026
No, neither the costs related to the procurement of the final defence products nor their components nor their corresponding raw materials is eligible.
Read it on the EU portal ↗Answered 2 Jun 2026
EDIP calls appear under EDF technical configuration framework in the Funding and Tender portal. However, all EDIP calls and topics are clearly identified with EDIP in their identifiers (e.g. EDF-EDIP-2026-XXX).
The same does apply with the Model Grant Agreement which is common for actions funded via lump-sum both under EDF and EDIP, with some provisions only applying to EDIP and some others only applying to EDF.
This does not imply that there is any link between the EDF and the EDIP Regulations, which are fully independent.
Read it on the EU portal ↗Answered 28 Sept 2026
There is no requirement under the EDIP Regulation or the EDF-EDIP-P-2026-LS-IRA-EC call to submit LoI/LoS.
Applicants may still submit other supporting documents, including letters from Ministries of Defence (or linked entities) or financial institutions, where relevant for the evaluation of the proposal or the credibility of the financing and budgetary arrangements.
Read it on the EU portal ↗Answered 11 Jun 2026
The call document provides instructions on how to submit sensitive information under 11. How to submit an application, and more specifically : The zip archive must be submitted password-protected (using AES-256 encryption method), with a size of less than 100 MB. The password (and any other passwords used in the documents) must be communicated before the deadline for submission to the following email address: DEFIS-EDIP-PROPOSALS-PWD@ec.europa.eu (together with the proposal ID and the name of the zip archive).
The relevant procurement-related templates are designed so as not to require disclosure of commercially sensitive information such as supplier identity or detailed pricing information. The requested information is limited to categories of components, percentages, practices to determine origin and the existence of appropriate procurement/compliance frameworks.
Read it on the EU portal ↗Answered 22 May 2026
The Information webinar on Industrial Reinforcement Actions (IRA) within the European Defence Industrial Programme (EDIP) will take place on May 27th 10.00-12.00 (Brussels time).
The webinar will be open to registered participants, targeting specifically eligible applicants as well as representatives from Member States/Associated countries. The webinar will consist of a presentation by DG DEFIS on IRA calls (both under EDIP and USI) and conditions to apply, replies to FAQs that have been sent beforehand to DG DEFIS and a live Q&A session.
Submit your registration application ec.europa.eu, by Monday May 25th .
More information on EDIP IRA, including tutorials, can be found at the EDIP IRA homepage, where you will also be able to stream the webinar afterwards.
Read it on the EU portal ↗Answered 19 May 2026
The IRA call conditions define “tier-1 components” as “ those procured directly by the end manufacturer independently of their functionality or criticality in the defence product.
There is no reference to “main components” in the definition of Tier-1 component. It refers to all Tier-1 procured components related to the product whose capacity is being increased.
Please be aware that the call conditions foresee two calculation methods, one of them allowing to take into account Tier-1 components and the total manufacturing costs at the level of subsystems built in-house together with the cost of the Tier-1 procured components ready to be integrated directly in the production capacity being increased until (but excluding the last manufacturing process ahead of the packaging and quality control).
Read it on the EU portal ↗Answered 11 Jun 2026
Dissemination and communication activities are not part of the evaluation criteria. Those details will be discussed during the Grant Agreement Preparation (GAP) and implementation of the GA, in full consideration of the sensitivity of the information.
Read it on the EU portal ↗Answered 11 Jun 2026
For details on project duration, please refer to the applicable call conditions. For example, according to the call EDF-EDIP-P-2026-LS-IRA, actions shall not have started before 5 March 2024 and shall not have been completed before the signature of the Grant Agreement (GA). The duration and the starting date of the action will be set out in the GA. The action shall have an indicative duration of three to five years; in any event, it shall be completed no later than 31 December 2033.
Read it on the EU portal ↗Answered 11 Jun 2026
Loitering munitions are listed as possible targeted defence products in the IRA-EC, IRA-PE and USI-MAB calls. No standardised definition is given but loitering munitions are expendable unmanned weapon systems designed to loiter over an area before being directed onto a target. The assessment will be made in light of the scope/objectives of the relevant topic under the applicable call conditions.
Read it on the EU portal ↗Answered 3 Jun 2026
The video recording and the slides of the info session are available online:
Video youtu.be
Read it on the EU portal ↗Answered 2 Jun 2026
The contribution for the optional work package is included in the overall ceiling for the maximum EU contribution per project.
Read it on the EU portal ↗Answered 2 Jun 2026
Based on the applicable IRA call conditions and Article 12 EDIP, the project is considered completed once the supported production capacity has been installed, commissioned and is operational in accordance with the objectives, deliverables, milestones and KPIs defined in the grant agreement.
The published call conditions do not establish a requirement to demonstrate a predefined minimum production volume or a minimum duration of production activity after commissioning. However, where production-output KPIs, ramp-up targets or operational-performance indicators are included in the proposal and grant agreement, applicants may be required to demonstrate achievement of those commitments.
Read it on the EU portal ↗Answered 26 May 2026
In the context of the EDIP declaration, “non-reimbursable public or private sources” refers to non-reimbursable financing instrument, that may be either public or private (e.g grant, procurement contract, but not limited to it).
When the applicant has to repay the funding of the action in any way, this is classified as “own financing”. This type of financing that would require reimbursement/repayments can include:
- Loans;
- any other action that could require reimbursement/repayment with the undertaking’s own funds.
Article 10.2(d) of the EDIP Regulation states that actions or parts thereof, that are already fully financed from other public or private sources, shall not be eligible for funding under EDIP. This would be the case for instance of an action, or part thereof, that has been funded to 100 % of its costs and through a non-reimbursable financial instrument.
In this case, the action, or the part thereof that has already been fully financed by a non-reimbursable instrument, cannot qualify as eligible for funding under EDIP.
However, even if the action, or part thereof, was funded to 100 % of its costs, if the financial instrument was a reimbursable one then the action, or the part thereof can qualify as eligible for funding under EDIP.
Read it on the EU portal ↗Answered 22 May 2026
Under the applicable award criteria and evaluation guidance, “cross-border cooperation” is not limited to formal consortium composition. The assessment may also take into account subcontracting, supply-chain participation, technology provision, raw-material supply and other cross-border industrial cooperation involving entities established in different Member States or associated countries, including “subcontractors” and “other legal entities in the supply chain”, cooperating in the implementation of the action.
Read it on the EU portal ↗Answered 26 May 2026
The EC does not request information on the control and ownership of subcontractors. However, the subcontracting work must be performed in the EU.
Read it on the EU portal ↗Answered 2 Jun 2026
The origin of purchased tier-1 component is independent from ownership/control of the manufacturer. For components imported into the EU (+AC/UA), the origin is as shown in the customs documents or purchase documents, in line with the relevant customs laws. In the case of components bought within the EU (+AC/UA), origin is defined as the place where the component underwent its last substantial, economically justified processing or working, in an undertaking equipped for that purpose and resulting in the manufacture of a new product or representing an important stage of manufacture, in compliance with the definition in the EU Customs Code.
Read it on the EU portal ↗Answered 2 Jun 2026
A project that is completed before the signature of the grant agreement is not eligible for IRA funding.
Read it on the EU portal ↗Answered 2 Jun 2026
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09