Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Based on projects the EU funded on the same subject in this programme.
CISMACiSMA: Circular Steel for Mass Market Applications
HORIZON-CL4-2024-TWIN-TRANSITION-01-46 · 2024 · Official record ↗
CE-RISECircular Economy Resource Information System
HORIZON-CL4-2022-RESILIENCE-01-01 · 2023 · Official record ↗
IS2H4CSustainable Circular Economy Transition: From Industrial Symbiosis to Hubs for Circularity
HORIZON-CL4-2023-TWIN-TRANSITION-01-37 · 2024 · Official record ↗
PlootoProduct Passport through Twinning of Circular Value Chains
HORIZON-CL4-2022-RESILIENCE-01-01 · 2023 · Official record ↗
CIRCULOOSCircular and Dynamic Manufacturing Supply Chain Orchestration and OptimiSation
HORIZON-CL4-2022-TWIN-TRANSITION-01-06 · 2023 · Official record ↗
ICARUSICARUS. INCREASING CIRCULARITY IN PROCESS INDUSTRIES BY UPCYCLING SECONDARY RESOURCES
HORIZON-CL4-2023-TWIN-TRANSITION-01-42 · 2024 · Official record ↗
MOWSESMULTI-FACETED ASSESSMENT AND OPTIMIZATION OF WELDED STRUCTURAL GREEN STEEL PLATES FOR USE IN EUROPEAN SUSTAINABLE INFRASTRUCTURE
HORIZON-CL4-2024-TWIN-TRANSITION-01-46 · 2024 · Official record ↗
AUTO-TWINData-driven method based on a process mining approach for Automated Digital Twin generation, operations, and maintenance in circular value chains
HORIZON-CL4-2022-TWIN-TRANSITION-01-07 · 2022 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
1 organisations have posted on the EU portal that they are looking for partners for this call.
Notices the EU posted on this call, newest first. Open one to read the official text.
If your lump sum budget contains any cost items in cost category C and/or D, please make sure to justify these items in the ‘Any comments’ sheet of the Excel detailed lump sum budget table.
The reason is that we simplified the proposal template, removing this information from Part B and bringing it closer to the relevant budget items.
Specifically, you must include justification in the ‘Any comments’ sheet if you are in any of the following situations:
If the sum of the costs for ’travel and subsistence’, ‘equipment’, and ‘other goods, works and services’ (i.e. the purchase costs) exceeds 15% of the personnel costs for a participant. If this is the case, justify the most expensive cost item(s) up to the level that the remaining costs are below 15% of personnel costs.
If other cost categories (e.g. internally invoiced goods and services) are used.
If in-kind contributions are used (non-financial resources made available free of charge by third parties, which must be included as direct costs in the corresponding cost category, e.g. personnel costs or purchase costs for equipment).
The submission session is now available for: HORIZON-CL4-2026-01-MAT-PROD-24, HORIZON-CL4-2026-01-MAT-PROD-46, HORIZON-CL4-2026-01-MAT-PROD-13, HORIZON-CL4-2026-01-MAT-PROD-01, HORIZON-CL4-2026-01-MAT-PROD-45, HORIZON-CL4-2026-01-MAT-PROD-05, HORIZON-CL4-2026-01-MAT-PROD-12, HORIZON-CL4-2026-01-MAT-PROD-41, HORIZON-CL4-2026-01-MAT-PROD-11, HORIZON-CL4-2026-01-MAT-PROD-14, HORIZON-CL4-2026-01-MAT-PROD-04, HORIZON-CL4-2026-01-MAT-PROD-31, HORIZON-CL4-2026-01-MAT-PROD-44, HORIZON-CL4-2026-01-MAT-PROD-23, HORIZON-CL4-2026-01-MAT-PROD-48
Projects are expected to contribute to one or more of the following outcomes:
The topic aims to optimise the efficiency of materials, water and energy use by recycling and upcycling of side streams from production and end-of-use waste, to become more competitive, safe and sustainable. Material production becomes less dependent on imports and / or use of non-renewable materials by improving recovery along the value chain, developing and upscaling low-CO2 processes to recover materials, including to replace current efficient but CO2-intensive recycling.
The continuity and high resource demand for materials and energy of industrial processes need dependable availability of resources. The attainment of this target requires moving away from primary, often expensive, and rare resources, by the re-integration and valorisation of secondary resources (end-of-use waste) and industrial side-streams into the process industries as feedstock. Priority should be given to streams that contain critical and insufficiently available raw materials, and to streams with a large carbon footprint or a large required energy input for their production.
The development of technologies should encompass the entire value chain from the collection, dismantling, sorting and separation of waste to the processing of the streams and the production of new high-quality materials. The demonstration of the innovative, efficient, and economically viable technologies is required, considering a scale and conditions that can give reliable indications on the real-world economic potential. Minimizing the intake of energy and water should be considered.
Proposals under this topic are expected to address at least 3 of the following points:
Showcase improved performance, scalability and cost efficiency of the proposed solution through at least one case at laboratory level pilot scale. Digitalisation should be included when effective, but it must not be targeted independently from the development and validation of the necessary process technologies.
The re-integration of side streams in the production cycle can take place within one sector or across sectors (industrial symbiosis). Impacts of regulations must be considered and proposals for their modification and/or enhancement should be suggested where required.
Proposals should include a business case and exploitation strategy, as outlined in the introduction to this Destination.
This topic implements the co-programmed European Partnerships Processes4Planet and Clean Steel.
null
Activities are expected to start at TRL 4-5 and achieve TRL 6 by the end of the project – see General Annex B.
[1] Environmental, social and governance (ESG) ratings: Council and Parliament reach agreement - Consilium
1. Admissibility Conditions: Proposal page limit and layout
In order to include a business case and exploitation strategy, as outlined in the introduction to this Destination, the page limit in part B of the General Annexes is exceptionally extended by 3 pages.
Admissibility conditions are described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
To ensure a balanced portfolio covering also support for the steel sector, grants will be awarded to applications not only in order of ranking but at least also to two proposals that are the highest ranked that focus on the recovery of iron-containing residuals / waste / by-products using low-CO2 processes; provided that the applications attain all thresholds.
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
The granting authority may, up to 4 years after the end of the action, object to a transfer of ownership or to the exclusive licensing of results, as set out in the specific provision of Annex 5.
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)  
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
Lump Sum MGA 
Operating Grants MGA 
Framework Partnership Agreement FPA 
Call-specific instructions 
Detailed budget table (HE LS) 
Information on financial support to third parties (HE) 
Information on clinical studies (HE) 
Guidance: "Lump sums - what do I need to know?"
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 7. Digital, Industry and Space
HE Main Work Programme 2026-2027 – 14. Horizontal Activities
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 1 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The industry sectors covered by the topics implementing Processes4Planet partnership are those sectors:
Read it on the EU portal ↗Answered 28 Oct 2026
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.