Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Based on projects the EU funded on the same subject in this programme.
PIONEEROPEN INNOVATION PLATFORM FOR OPTIMISING PRODUCTION SYSTEMS BY COMBINING PRODUCT DEVELOPMENT, VIRTUAL ENGINEERING WORKFLOWS AND PRODUCTION DATA
HORIZON-CL4-2022-RESILIENCE-01-25 · 2023 · Official record ↗
Carbon4MineralsTransforming CO2 into added-value construction products
HORIZON-CL4-2022-TWIN-TRANSITION-01-11 · 2023 · Official record ↗
THREADING-CO2VALORISATION OF CO2 WASTE STREAMS INTO POLYESTER FOR A SUSTAINABLE CIRCULAR TEXTILE INDUSTRY
HORIZON-CL4-2022-TWIN-TRANSITION-01-11 · 2023 · Official record ↗
MECALOCO2 FREE PRODUCTION OF CRITICAL RAW MATERIALS USING HYDROGEN
HORIZON-CL4-2024-TWIN-TRANSITION-01-34 · 2024 · Official record ↗
PlootoProduct Passport through Twinning of Circular Value Chains
HORIZON-CL4-2022-RESILIENCE-01-01 · 2023 · Official record ↗
ICO2NICInnovative electrochemical CO2 Conversion to Versatile Feedstock
HORIZON-CL4-2024-TWIN-TRANSITION-01-35 · 2025 · Official record ↗
EMPHATICALEfficient Methanol from Pumped Heat and Calcium Looping
HORIZON-CL4-2024-TWIN-TRANSITION-01-35 · 2024 · Official record ↗
E-ECO DownstreamDevelopment of heating technologies for the Efficient renewable Energy COnsumption of CO2-neutral DOWNSTREAM-processes
HORIZON-CL4-2024-TWIN-TRANSITION-01-46 · 2025 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
1 organisations have posted on the EU portal that they are looking for partners for this call.
Notices the EU posted on this call, newest first. Open one to read the official text.
If your lump sum budget contains any cost items in cost category C and/or D, please make sure to justify these items in the ‘Any comments’ sheet of the Excel detailed lump sum budget table.
The reason is that we simplified the proposal template, removing this information from Part B and bringing it closer to the relevant budget items.
Specifically, you must include justification in the ‘Any comments’ sheet if you are in any of the following situations:
If the sum of the costs for ’travel and subsistence’, ‘equipment’, and ‘other goods, works and services’ (i.e. the purchase costs) exceeds 15% of the personnel costs for a participant. If this is the case, justify the most expensive cost item(s) up to the level that the remaining costs are below 15% of personnel costs.
If other cost categories (e.g. internally invoiced goods and services) are used.
If in-kind contributions are used (non-financial resources made available free of charge by third parties, which must be included as direct costs in the corresponding cost category, e.g. personnel costs or purchase costs for equipment).
The submission session is now available for: HORIZON-CL4-2026-01-MAT-PROD-24, HORIZON-CL4-2026-01-MAT-PROD-46, HORIZON-CL4-2026-01-MAT-PROD-13, HORIZON-CL4-2026-01-MAT-PROD-01, HORIZON-CL4-2026-01-MAT-PROD-45, HORIZON-CL4-2026-01-MAT-PROD-05, HORIZON-CL4-2026-01-MAT-PROD-12, HORIZON-CL4-2026-01-MAT-PROD-41, HORIZON-CL4-2026-01-MAT-PROD-11, HORIZON-CL4-2026-01-MAT-PROD-14, HORIZON-CL4-2026-01-MAT-PROD-04, HORIZON-CL4-2026-01-MAT-PROD-31, HORIZON-CL4-2026-01-MAT-PROD-44, HORIZON-CL4-2026-01-MAT-PROD-23, HORIZON-CL4-2026-01-MAT-PROD-48
Projects are expected to contribute to the following outcomes:
There are only a few products that can be competitively produced from CO2. Increased opportunities for CCU from process industry emissions require the development of a larger portfolio of potential CO2-derived products. The higher cost of CO2-based products compared to conventional production routes is mostly driven by the high energy demand arising from the thermodynamic constraints of CO2. The smart integration of CO2 capture, purification and conversion can enable process optimisation with reduced energy consumption as well as reduced capital expenditure. Additionally, innovative processes can overcome the inherent equilibrium limitations of CCU production. The development of new integrated processes can be an opportunity to optimise the use of electricity, make use of available heat sources and relevant infrastructures and thus accelerate the development of CO2 valorisation.
Proposals under this topic are expected to address several of the following points:
Conversion of CO2 to methanol and fuels is considered outside the scope of this topic.
Showcase improved performance, scalability and cost efficiency of the proposed solution through at least one case at laboratory level pilot scale.
The inclusion of a GHG avoidance methodology[1] is recommended and should provide detailed descriptions of baselines and projected emissions reduction.
Proposals should include a business case and exploitation strategy, as outlined in the introduction to this Destination, underlining how the proposal will serve the purpose to boost industrial decarbonisation technologies supply chain in Europe. Proposals should consider representative real industrial sites demonstrating the solutions at least in open-loop computations. This should be done in parallel to the actual operation of the plants with validation of the benefits by simulations with accurate models. Experiments involving real industrial sites are encouraged. Societal- and environmental impact as well as implications for the workplace (including skills and organisational change) should be outlined.
This topic implements the co-programmed European partnership Processes4Planet.
null
Activities are expected to start at TRL 4-5 and achieve TRL 6 by the end of the project – see General Annex B.
[1] That could follow Innovation Fund methodology: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/innovfund/wp-call/2021/call-annex_c_innovfund-lsc-2021_en.pdf
1. Admissibility Conditions: Proposal page limit and layout
In order to include a business case and exploitation strategy, as outlined in the introduction to this Destination, the page limit in part B of the General Annexes is exceptionally extended by 3 pages.
Admissibility conditions are described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
The granting authority may, up to 4 years after the end of the action, object to a transfer of ownership or to the exclusive licensing of results, as set out in the specific provision of Annex 5.
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)  
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
Lump Sum MGA 
Operating Grants MGA 
Framework Partnership Agreement FPA 
Call-specific instructions 
Detailed budget table (HE LS) 
Information on financial support to third parties (HE) 
Information on clinical studies (HE) 
Guidance: "Lump sums - what do I need to know?"
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 7. Digital, Industry and Space
HE Main Work Programme 2026-2027 – 14. Horizontal Activities
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 4 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The industry sectors covered by the topics implementing Processes4Planet partnership are those sectors:
Read it on the EU portal ↗Answered 28 Oct 2026
Not necessarily but as written in the topic text “proposals should consider representative real industrial sites demonstrating the solutions at least in open-loop computations. This should be done in parallel to the actual operation of the plants with validation of the benefits by simulations with accurate models. Experiments involving real industrial sites are encouraged.”
Read it on the EU portal ↗Answered 22 Mar 2026
If the final product is a fuel, it is out of scope.
Read it on the EU portal ↗Answered 26 Feb 2026
If methanol is a main intermediate, it is out of scope.
Read it on the EU portal ↗Answered 26 Feb 2026
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.