Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Official evaluation results the EU published for this call.
Funding cutoff score: 14.50. Every funded proposal scored at least this.
Projects the EU funded under this call, with the organisation that led each one.
ENHANCEMENTEmissions mitigatioN tHrough cArboN CapturE froM bioENergy and its application in hard to abaTe industry
Led by SINTEF AS · Norway · 2025 · Official record ↗
eREGENERATEREsistive heatinG in structured hydrophobic sorbents for a highly EfficieNt and fully Electrified DiRect Air CapTurE technology
Led by SINTEF AS · Norway · 2025 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
C-SinkActions required to secure the large-scale deployment of the leading CDR approaches to meet EU climate targets
HORIZON-CL5-2022-D1-01-01-two-stage · 2023 · Official record ↗
SEAO2-CDRStrategies for the Evaluation and Assessment Of Ocean based Carbon Dioxide Removal
HORIZON-CL5-2022-D1-01-01-two-stage · 2023 · Official record ↗
UPTAKEBridging current knowledge gaps to enable the UPTAKE of carbon dioxide removal methods
HORIZON-CL5-2022-D1-01-01-two-stage · 2023 · Official record ↗
RESCUEResponse of the Earth System to overshoot, Climate neUtrality and negative Emissions
HORIZON-CL5-2021-D1-01-01 · 2022 · Official record ↗
ICARUSInternational cooperation for sustainable aviation biofuels
HORIZON-CL5-2022-D3-03-02 · 2023 · Official record ↗
Bio-FlexCLCFlexible chemical looping combustion for combined heat and power production from biogenic residues with negative emission
HORIZON-CL5-2023-D3-02-01 · 2024 · Official record ↗
WILDCARDEFFECTS OF REWILDING IN FORESTS AND AGRICULTURAL LANDS ON CARBON SEQUESTRATION AND DIVERSITY
HORIZON-CL5-2022-D1-02-05 · 2024 · Official record ↗
SSH CENTRESocial Sciences and Humanities for Climate, Energy aNd Transport Research Excellence
HORIZON-CL5-2021-D2-01-13 · 2022 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Notices the EU posted on this call, newest first. Open one to read the official text.
Call update: EVALUATION results
Published: 07.12.2022
Deadline: 04.02.2025
Available budget: EUR 138.600.000
The results of the evaluation for each topic are as follows:
D3-02-01
D3-02-02
D3-02-03
D3-02-04
D3-02-05
D3-02-06
D3-02-07
D3-02-08
D3-02-09
D3-02-10
D3-02-11
D3-02-12
D3-02-13
Number of proposals submitted (including proposals transferred from or to other calls)
26
120
101
52
31
76
12
33
13
66
27
34
2
Number of inadmissible proposals
-
-
-
-
-
-
-
-
-
1
-
-
1
Number of ineligible proposals
3
3
1
4
1
3
1
-
4
-
-
1
-
Number of above-threshold proposals
13
69
43
26
12
31
8
10
2
35
7
17
1
Total budget requested for above-threshold proposals (EUR/millions)
38.9
268.5
151.5
105.0
83.4
150.5
23.8
49.1
30.0
70.5
49.5
109.2
0.6
Number of proposals retained for funding
2
3
2
2
2
2
1
2
2
4
2
2
1
Number of proposals in the reserve list
2
3
3
2
2
2
2
2
-
2
2
2
-
Funding threshold
14.00
15.00
15.00
15.00
15.00
15.00
15.00
14.50
11.50
15.00
14.50
14.50
10.50
Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14
5
18
18
7
3
13
2
3
-
11
4
7
-
Number of proposals with scores lower than 14 and higher or equal to 13
2
23
11
5
4
11
2
-
-
10
2
3
-
Number of proposals with scores lower than 13 and higher or equal to 10
6
28
14
14
5
7
4
7
2
14
1
7
1
Summary of observer report:
“As independent observer, I thoroughly familiarized myself with the call and evaluation documentation, along with the provided instructions. I actively participated in briefings, group discussions, and panel meetings, gained full access to the online evaluation SEP system, and closely followed the evaluation process, including the review of individual assessments and consensus reports.
The evaluation was meticulously conducted, characterized by fairness, impartiality, expertise, and transparency. The evaluation summary reports and the ranking lists, as the final products, uphold high-quality standards and fully comply with the established guidelines and applicable rules.
Each consensus meeting was efficiently managed, supported by robust quality control measures and a detailed final calibration process, ensuring consistency in evaluation outcomes. Throughout the process until the final panel meetings, the principles of impartiality, fairness, and confidentiality were rigorously observed.”
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Call HORIZON-CL5-2024-D3-02 has closed on the 04/02/2025 (17:00).
593 proposals have been submitted.
The breakdown per topic is:
Evaluation results are expected to be communicated in May 2025.
Please note that we have replaced the Detailed Budget Table (HE Lump sum) template in the Submission System with a version that includes the updated SME owner unit cost rate (more information available ec.europa.eu). If you are not using the SME owner unit cost and have already filled in the previous Detailed Budget Table template, then you can submit this Excel file. However, if you are using the SME owner unit cost, please use the version available now in the submission system.
We apologise for the inconvenience.
The submission session is now available for: HORIZON-CL5-2024-D3-02-11, HORIZON-CL5-2024-D3-02-09, HORIZON-CL5-2024-D3-02-08, HORIZON-CL5-2024-D3-02-01, HORIZON-CL5-2024-D3-02-03, HORIZON-CL5-2024-D3-02-05, HORIZON-CL5-2024-D3-02-02, HORIZON-CL5-2024-D3-02-06, HORIZON-CL5-2024-D3-02-13, HORIZON-CL5-2024-D3-02-10, HORIZON-CL5-2024-D3-02-04, HORIZON-CL5-2024-D3-02-07, HORIZON-CL5-2024-D3-02-12
Please note that the deadline of this call (HORIZON-CL5-2024-D3-02) has been postponed from 21 January 2025 to 04 February 2025.
The European Union aims at reducing its net greenhouse gas emissions by at least 55% by 2030 compared to 1990 levels, and at achieving carbon neutrality by 2050. Under the European Green Deal, the Commission has also adopted a zero-pollution action plan, with a zero-pollution ambition, and a Biodiversity Strategy. In view of achieving these ambitious targets it is appropriate to further explore the development of direct air carbon capture and storage (DACCS) and bioenergy carbon capture and storage (BECCS) as CO2 capture technologies in combination with CO2 storage, duly assessing their impacts on other environmental challenges.
The project is expected to develop highly innovative CCUS /carbon negative technologies leading to CO2 removal. It should enable the cost-effective deployment of technologies such as DACCS and/or BECCS ideally linking them to industrial clusters with special emphasis of these technologies to safe CO2 underground storage and CO2 utilisation.
Project results are expected to contribute to at least one of the following expected outcomes:
This topic focusses on DACCS and BECCS, which are technologies that can help reaching climate neutrality by 2050 by creating the carbon sinks required to balance out residual emissions in 2050.
The objective of this topic is to further the technological development of DACCS and BECCS, and addressing the environmental, social and economic challenges and benefits with the view of establishing this concept as a viable technology to fight climate change. The potential technologies require major technological breakthroughs.
Projects should substantiate the potential for the proposed solutions in the area(s) of DACCS and/or BECCS as CO2 mitigation option by conducting an LCA in conformity with guidelines developed by the Commission, such as the Innovation Fund GHG methodology and the relevant ISO standards and the EU Taxonomy Regulation. This life cycle consideration should include the sustainability of biomass and the renewable origin of electricity but also assess other environmental dimensions (requirements for land, water; impacts on air and water quality, biodiversity; distances to major storage clusters, leakages etc.).
Technology development has to be balanced by an assessment of the societal readiness towards the proposed innovations. Relevant end users and societal stakeholders (such as civil society organisations, non-governmental organisations, and local associations) will be identified in the proposal and involved in deliberative activities to understand and address their concerns and needs. This will be analysed during the project using appropriate techniques and methods from the social sciences and humanities, in order to create awareness, gain feedback on societal impact and advancing society’s readiness for the proposed solutions. Projects, therefore, could consider the inclusion of relevant SSH expertise in order to enhance the societal impact of the related research activities. Projects should also explore the socio-economic and political barriers to acceptability and awareness with a view to regulatory or policy initiatives and include aspects of circularity and best use of resources.
Plan for the exploitation and dissemination of results for proposals submitted under this topic should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan, financial model) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).
Proposals that include research into the use of direct air capture and BECCS for enhanced oil recovery will not be considered. Proposals are expected to take into account the related activities within the EU ETS Innovation Fund and the EU Catalyst Partnership. International cooperation with Mission Innovation countries is encouraged in line with the Carbon Dioxide Removal Mission (CDR Mission). [1].
Successful projects will be encouraged to join the EU CCUS knowledge sharing project network.
null
Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.
[1] Applicants are reminded that legal entities established in China are not eligible to participate in Innovation Actions in any capacity. Please refer to the Annex B of the General Annexes of this Work Programme for further details.
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
In order to ensure a balanced portfolio of activities covering both DACCS and BECCS technologies, grants will be awarded not only in order of ranking but at least also to one proposal dealing with the technology that has not been covered by the proposal selected first, provided they attain all thresholds (and subject to available budget). This condition to ensure a balanced portfolio will also be considered to be met if one project addressing both aspects is funded.
Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025). [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
 
7. Specific conditions: described in the [specific topic of the Work Programme]
 
Documents
Call documents:
Standard application form — call-specific application form is available in the Submission System
Normal
0
21
false
false
false
FR-BE
X-NONE
X-NONE
MicrosoftInternetExplorer4
/* Style Definitions */
table.MsoNormalTable
{mso-style-name:"Table Normal";
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-parent:"";
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin-top:0cm;
mso-para-margin-right:0cm;
mso-para-margin-bottom:8.0pt;
mso-para-margin-left:0cm;
line-height:107%;
mso-pagination:widow-orphan;
font-size:11.0pt;
font-family:"Calibri",sans-serif;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-bidi-font-family:"Times New Roman";
mso-bidi-theme-font:minor-bidi;
mso-fareast-language:EN-US;}
Standard application form (HE RIA, IA)
Template excel for the detailed budget costs breakdown (Lump Sum)
Presentation - Lump Sum Funding: What do I need to know?
Decision authorising Lump Sum under Horizon Europe
Standard evaluation form — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
MGA
Lump Sum MGA v1.0
Call-specific instructions
Detailed budget table (HE LS)
 
Guidance: "Lump sums - what do I need to know?"
 
Additional documents:
HE Main Work Programme 2023–2024 – 1. General Introduction
HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2024 – 13. General Annexes
HE Programme Guide
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 9 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
No. The topic explicitly asks that projects lead to carbon removal from the atmosphere, which is different from recycling CO2.
Read it on the EU portal ↗Answered 22 Jan 2025
The aim of the Bridge initiative is to increase the impact of projects in 2 ways:
Projects are expected to support the provision of advice and evidence for EU policy making by taking an active role in at least one of the Bridge working groups, by contributing to its annual work programme and related reports. They would also be expected to participate in the Bridge annual general assembly and, more generally, by sharing experiences and best practices with the other Bridge member projects. Applicants could already specify in their application the activities and the fields of interests for the cooperation with the Bridge initiative. Applicants are not expected to contact the Bridge secretariat during the proposal preparation but only when the project has been awarded.
Read it on the EU portal ↗Answered 24 Feb 2023
Ideally, specifically designed vehicles should be used, but retrofitting can also be considered.
Read it on the EU portal ↗Answered 10 Jul 2024
Preferably passenger (EVs) or light duty commercial vehicles (ELCVs).
Read it on the EU portal ↗Answered 10 Jul 2024
Read it on the EU portal ↗Answered 24 May 2024
The topic expects activities to achieve TRL 3-4 by the end of the project , thus “novel” refers mainly to the production pathway. Without being excluded, non-existing fuels would require activities of more fundamental research.
Read it on the EU portal ↗Answered 24 May 2024
Using only biogas constituents is not sufficient from a technical point of view, as biogas contains typically 40% CO2 and less than 1% hydrogen. Extra hydrogen and energy would be needed. Therefore the topic specifies “Process energy will also be renewable. …Pathways via production of renewable hydrogen or renewable hydrogen ionic compounds from all forms and origins of renewable energy (e.g., electricity, direct sunlight, heat) are in scope.”
Read it on the EU portal ↗Answered 24 May 2024
The Renewable hydrogen ionic compounds are understood as ionic compounds formed between at least two elements, one of which is hydrogen.
Read it on the EU portal ↗Answered 29 Apr 2024
Project are expect to develop new sustainable materials with improved characteristics. The materials listed are examples (‘such as’) and other innovative materials are also possible.
Read it on the EU portal ↗Answered 3 Apr 2024
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.