Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Official evaluation results the EU published for this call.
Funding cutoff score: 14.50. Every funded proposal scored at least this.
Projects the EU funded under this call, with the organisation that led each one.
CRedIBlECircular REDesign for a Resource-efficient, Innovative, and Transformative Built Environment
Led by Kauno Technologijos Universitetas · Lithuania · 2025 · Official record ↗
Le ColazLe' Colaz: Building an Adaptable Future Brick by Brick through A Comprehensive Framework for Circular, Secure, and AI-Optimized Sustainable Construction
Led by Ethnicon Metsovion Polytechnion · Greece · 2025 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
ZEBAIInnovative methodologies for the design of Zero-Emission and cost-effective Buildings enhanced by Artificial Intelligence
HORIZON-CL5-2023-D4-01-01 · 2024 · Official record ↗
META BUILDPowering the METAmorphosis of BUILDings towards a decarbonised and sustainable energy system
HORIZON-CL5-2023-D4-01-05 · 2024 · Official record ↗
BuildONAffordable and digital solutions to Build the next generatiON of smart EU buildings
HORIZON-CL5-2022-D4-01-03 · 2023 · Official record ↗
DRASTICDemonstrating Real and Affordable Sustainable Building Solutions with Top-level whole life-cycle performance and Improved Circularity
HORIZON-CL5-2022-D4-02-05 · 2023 · Official record ↗
SNUGInnovative methodology based in circular economy and artificial intelligence to foster the transition to Sustainable and very high eNergy performance bUildinGs at a cost optimal level
HORIZON-CL5-2022-D4-02-05 · 2023 · Official record ↗
LEGOFITAdaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes
HORIZON-CL5-2022-D4-01-02 · 2023 · Official record ↗
GreeNestNEST InGrained ecosystem foR zEro EmissioN buildings
HORIZON-CL5-2023-D4-01-01 · 2024 · Official record ↗
SMARTeeSTORYIntegrated, interoperable, smart and user-centred building automation and control system for better energy performance of non-residential historic buildings coupling physics & data-based approaches
HORIZON-CL5-2022-D4-01-03 · 2023 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Notices the EU posted on this call, newest first. Open one to read the official text.
Call update: EVALUATION results
Published: 07.12.2022
Deadline: 04.02.2025
Available budget: EUR 50.000.000
The results of the evaluation for each topic are as follows:
D4-02-01
D4-02-02
D4-02-03
D4-02-04
D4-02-05
Number of proposals submitted (including proposals transferred from or to other calls)
31
73
54
106
93
Number of inadmissible proposals
1
-
-
-
-
Number of ineligible proposals
1
3
1
1
6
Number of above-threshold proposals
17
33
17
25
33
Total budget requested for above-threshold proposals (EUR/millions)
130.7
133.1
68.1
96.2
162.1
Number of proposals retained for funding
2
2
2
2
2
Number of proposals in the reserve list
2
2
2
2
2
Funding threshold
14.50
15.00
14.50
14.50
15.00
Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14
4
8
6
5
14
Number of proposals with scores lower than 14 and higher or equal to 13
4
9
-
6
6
Number of proposals with scores lower than 13 and higher or equal to 10
9
16
11
14
13
Summary of observer report:
“The way in which CINEA conducts evaluations is a well-developed chain of action that ensures a thorough and fair assessment of proposals. External experts develop Individual Evaluation Reports that are discussed in a consensus meeting week to identify the merits of the proposals and deliver an Evaluation Summary Report that gives feedback to applicants. Evaluators are provided with extensive information and guidance on how to assess proposals correctly. Calibration between panels of the same topic is taken very seriously and is introduced in daily calibration meetings. Consistency between the text and the scores applied is checked by external Quality Controllers and Senior Project Managers in order to provide comparable evaluation results of all panels of the topic. The well designed and documented process allied with the IT tool SEP (System for Evaluation of Proposals), ensured a high degree of transparency regarding the traceability of all steps of the evaluation.”
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Call HORIZON-CL5-2024-D4-02 has closed on the 04/02/2025 (17:00).
357 proposals have been submitted.
The breakdown per topic is:
Evaluation results are expected to be communicated in May 2025.
The submission session is now available for: HORIZON-CL5-2024-D4-02-05, HORIZON-CL5-2024-D4-02-03, HORIZON-CL5-2024-D4-02-02, HORIZON-CL5-2024-D4-02-04, HORIZON-CL5-2024-D4-02-01
Please note that the deadline of all 5 topics under call HORIZON-CL5-2024-D4-02 has been postponed from 21 January 2025 to 04 February 2025.
Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:
Scope:Based on the integration of innovative tools, products and techniques, to enable construction and renovation that embeds the principle of extending the service life of buildings, and facilitate adaptability to changing user needs (e.g. for optimal use of indoor space or to improve working and living conditions), reuse, and deconstruction, in a life-cycle optimisation and circular economy perspective.
Proposals are expected to address all of the following:
This topic requires the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities.
This topic implements the co-programmed European Partnership on ‘People-centric sustainable built environment’ (Built4People). As such, projects resulting from this topic will be expected to report on results to the European Partnership ‘People-centric sustainable built environment’ (Built4People) in support of the monitoring of its KPIs.
Selected proposal(s) could consider the involvement of the European Commission's Joint Research Centre (JRC). The JRC may provide support in research activities related to the design for adaptability, design-for-deconstruction and re-use of building elements for both new construction and renovation of buildings.
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
The Joint Research Centre (JRC) may participate as member of the consortium selected for funding.
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
 
7. Specific conditions: described in the [specific topic of the Work Programme]
 
Documents
Call documents:
Standard application form — call-specific application form is available in the Submission System
Standard application form (HE RIA, IA)
Standard evaluation form — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
MGA
HE General MGA v1.0
Additional documents:
HE Main Work Programme 2023–2024 – 1. General Introduction
HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2024 – 13. General Annexes
HE Programme Guide
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 7 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
Read it on the EU portal ↗Answered 2 Dec 2024
Also: Should applicants secure a certain share of the budget for these activities?
Answer:
To make the sentence easier to understand, it should be read as follows:
"Contribute to the objectives of the Built4People partnership and to the Built4People network of innovation clusters."
The B4P projects are required to contribute to the B4P Partnership in two ways:
-Projects must identify relevant activities in line with the partnership objectives and then, for reporting purposes, provide the B4P partners with the necessary information and data on the project's contributions to the overall partnership Key Performance Indicators. This aspect will be explained in more detail during the kick-off meeting of the selected projects.
-In parallel, projects may have to participate in events aiming at strengthening innovation clusters, for example by sharing their experience, by presenting their activities and showcasing the results of the projects.
These contributions do not require a specific percentage of the proposal budget to be allocated for Built4People-related activities.
Read it on the EU portal ↗Answered 18 Oct 2024
The B4P projects are required to contribute to the B4P Partnership in two ways:
-Projects must identify relevant activities in line with the partnership objectives and then, for reporting purposes, provide the B4P partners with the necessary information and data on the contribution of the projects to the overall partnership key performance indicators. This aspect will be explained in more detail during the kick-off meeting of the selected projects.
-In parallel, projects may have to participate in events aiming at strengthening innovation clusters, for example by sharing their experience, by presenting their activities and showcasing the results of the projects.
-These contributions do not require specific percentage of the proposal budget to be allocated for Built4People-related activities.
Read it on the EU portal ↗Answered 1 Oct 2024
The JRC can contribute to the projects selected for funding under this call through its experience in sustainable materials and modular construction methods. JRC's project Novel Modular and Reusable Panels for Safe & Carbon-Free Buildings (REUSE project) is at the forefront of advancing modular building systems that enhance building adaptability and life span, aligning with the call's objectives to foster circularity in the construction sector. JRC's innovations include prefabricated, eco-friendly bio-based materials and products, designed for quick assembly, disassembly, and material recovery. By incorporating design-for-deconstruction principles, JRC's approach actively supports the reuse of building components, significantly reducing waste and promoting sustainable practices in both new construction and renovation projects. This approach also aids carbon neutrality by utilizing sustainable materials.
The JRC’s ELSA testing facilities could be used for full-scale building tests to experimentally validate the technology’s effectiveness. Through this activity, the JRC could offer the winning projects opportunities for experimental verification of the proposed solutions on full-scale building prototypes, specifically for pilots or use cases.
Read it on the EU portal ↗Answered 18 Oct 2024
The Commission Services cannot provide further elaboration on the topic text. Regarding the expected TRL, the topic text indicates that activities are expected to achieve a TRL 5-6 by the end of the project. There is no indication of a start TRL. It is up to the participants to decide how they approach the validation requirements at TRL 5-6. Proposals are expected to address both aspects, i.e. solutions that address all components of buildings and that are validated at TRL 5-6 by the end of the project.
Read it on the EU portal ↗Answered 29 Apr 2024
The topic text requires, among others, that the solutions are validated in residential and non-residential projects, half of which should be renovation projects. Additionally, the validation of the solutions should cover at least two different countries, with diverse climatic conditions. When proposing the use of a virtual environment, applicants have to demonstrate that they will still meet all validation requirements of the call text and achieve at least TRL 5 at the end of the project.
Read it on the EU portal ↗Answered 29 Apr 2024
The topic text does not specifically refer to ‘disassembly’. However, the topic text requires proposals, among others, to validate construction and renovation solutions that ‘(…) facilitate deconstruction and reuse (…)’, ‘(...) improve the ease of reuse of construction elements and products from existing buildings (…)’ and ‘(…) can flexibly adapt to local / regional sourcing of innovative products and materials to increase replication. (…)’. Experts will assess whether the proposed solutions and environment are in line with the call text and of sufficient ambition. They will also assess the expected impact of the proposal using the standard evaluation criteria, in particular regarding the pathways to achieve the expected outcomes and impacts specified in the work programme, as well as the likely scale and significance of the contributions from the project, and the suitability and quality of the measures to maximise expected outcomes and impacts.
Read it on the EU portal ↗Answered 29 Apr 2024
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.