Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Projects the EU funded under this call, with the organisation that led each one.
EU4ENEREUropean energy communities empowered for grid-integrated, cross-sectoral and co-owned ENERgy future
Led by Sampol Ingenieria y Obras S.a. · Spain · 2027 · Official record ↗
ESTIRPEEfficient Sustainable Tools and Innovations for the EneRgy Communities EmPowerment through Renewable Energies
Led by Etra Investigacion y Desarrollo SA · Spain · 2027 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
CELINECross-sectorial integrated digital services Enabling energy Localized InnovatioN and community Empowerment
HORIZON-CL5-2023-D3-03-04 · 2024 · Official record ↗
INTELLIGENTINteroperable Tools for nEtwork-aware, Ledger-based Local energy sharIng and flexibility manaGEment leveraging user engagemeNT
HORIZON-CL5-2023-D3-03-05 · 2024 · Official record ↗
DR-RISEDemand Response - Residential Innovation for a Sustainable Energy system
HORIZON-CL5-2022-D4-01-01 · 2023 · Official record ↗
U2DemoUse of open-source P2P energy sharing platforms for energy democratization
HORIZON-CL5-2023-D3-03-05 · 2024 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Project results are expected to contribute to all of the following expected outcomes:
The project should:
Preferably semantically interoperable interactions, as enabled by the ETSI SAREF ontologies, are used. Furthermore, the project should follow the IEC TR 63097 Smart Grid Roadmap, and where relevant, the developed solutions should be open for off-shelf integration using common communication and data standards.
The project should benefit from the direct participation of energy communities, smart appliances manufacturers, home energy devices manufacturers, home and building energy management system developers, Distribution System Operators (DSOs), and aggregators.
However, in order to comply with Article 33, 36 and 54 of Directive (EU) 2019/944, TSOs or DSOs participating in this project should not own, develop, manage or operate energy storage facilities or recharging points for electric vehicles. Moreover, the role of the distribution system operator in facilitating peer to peer trading should be without prejudice to the rules in Article 35 Directive (EU) 2019/944.
The developed solutions have to be tested within, at least, three energy communities from different European countries, preferably in regions with different socio-economic development contexts and different resource availabilities. Technical and social characteristics should be used in the project to validate the developed solutions' credibility. The demonstration sites should cover complex and technologically advanced energy communities, each located within the range of neighbouring secondary substations supplying a variety of customers/prosumers with close-to-autarky local energy generation, a range of energy vectors, a significant share of storage facilities, and flexible topology already available or to be achieved as an integral part of the project. The secondary substation should be already equipped with advanced monitoring and control systems.
In order to increase the replication potential of the deployed solutions the three energy communities are invited to closely collaborate with similar energy communities.
The selected projects are expected to contribute to the BRIDGE initiative and actively participate in its activities. Additional contributions to the ‘Alliance for Internet of Things Innovation’ (AIOTI) and other relevant activities (e.g., clusters of digital projects and coordinating actions) might be considered when relevant.
In particular, this topic requires the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities.
null
Activities are expected to achieve TRL 7-8 by the end of the project – see General Annex B. Activities may start at any TRL.
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
The following exceptions apply: subject to restrictions for the protection of European communication networks.
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
described in Annex G of the Work Programme General Annexes.
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
HE MGA 
Additional documents:
HE Main Work Programme 2025 – 1. General Introduction
HE Main Work Programme 2025 – 8. Climate, Energy and Mobility
HE Main Work Programme 2025 – 14. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment 
EU Grants AGA — Annotated Model Grant Agreement 
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 4 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
Industrial and commercial areas can also be considered, provided the energy community abides by the membership, governance, and mission purpose requirements for renewable or citizen energy communities in the sense of Directive (EU) 2018/2001 and Directive (EU) 2019/944.
Read it on the EU portal ↗Answered 29 Oct 2025
It is a REC/CEC that operates de facto behind a secondary substation with close-to-autarky local energy generation, a range of energy vectors and assets, a significant share of storage facilities, and flexible topology already available or to be achieved as an integral part of the project. This requirement does not prejudge the possibility for such a REC/CEC to be de jure wider in terms of geographical scope, whether based on national law or statutes of the community.
Read it on the EU portal ↗Answered 26 Nov 2025
HEMS and BEMS should be linked to the DSO interface at the secondary substation. Secondary substation should support autonomous control and local coordination and gain intelligence to meet requirements from the edge (customer) systems and tools. It must allow coordination of the operation of energy community assets, including increase reliability of grid operation using energy community resources. The role of DSO is important in this context.
Read it on the EU portal ↗Answered 25 Nov 2025
This can be accepted under the following conditions:
It would be problematic if the core AID driven energy sharing model is built or trained within a closed platforms that others cannot access without a paid license or permission. This would risk locking future development into a proprietary environment.
Read it on the EU portal ↗Answered 17 Oct 2025
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.