Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Based on projects the EU funded on the same subject in this programme.
PUSH2HEATPushing forward the market potential and business models of waste heat valorisation by full-scale demonstration of next-gen heat upgrade technologies in various industrial contexts.
HORIZON-CL5-2021-D4-01-04 · 2022 · Official record ↗
SOLINDARITYSOLar-driven INDustrial power And heat upgRaded with hIgh-temperature heaT pumps for enhanced integrated process efficiencY
HORIZON-CL5-2023-D3-01-04 · 2024 · Official record ↗
USES4HEATUnderground Large Scale Seasonal Energy Storage for Decarbonized and Reliable Heat
HORIZON-CL5-2023-D3-01-14 · 2023 · Official record ↗
SUSHEATSmart Integration of Waste and Renewable Energy for Sustainable Heat Upgrade in the Industry
HORIZON-CL5-2022-D4-01-04 · 2023 · Official record ↗
TechUPGRADEThermochemical Heat Recovery and Upgrade for Industrial Processes (TechUPGRADE)
HORIZON-CL5-2022-D4-01-04 · 2023 · Official record ↗
STOREDGEA LONG DURATION AND CUTTING-EDGE THERMOCHEMICAL HEAT STORAGE AND UPGRADING TECHNOLOGY FOR HEAT AND POWER APPLICATIONS
HORIZON-CL5-2024-D2-01-04 · 2025 · Official record ↗
GEOSYNGEOTHERMAL SYNERGY: ENHANCING INDUSTRIAL ENERGY EFFICIENCY THROUGH STEAM HIGH-TEMPERATURE HEAT PUMPS AND HEAT-POWERED COOLING SYSTEMS WITH OPERATIONAL FLEXIBILITY AND PUBLIC TRUST
HORIZON-CL5-2024-D3-01-06 · 2024 · Official record ↗
ZIMBAZero-carbon Industrial heat production by aMmonia water aBsorption heAt transformer
HORIZON-CL5-2023-D3-02-04 · 2024 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Project results are expected to contribute to all of the following expected outcomes:
This topic aims to satisfy the need for process heat in the more industrial sectors by upgrading excess/waste heat from the process itself, possibly combined with heat recovered in nearby locations or local renewable heat, as a cost-efficient way to improve energy efficiency and reduce the GHG emissions and air pollutants and the use of fossil fuels. Thermal and/or electrical energy storage can be integrated, if it can contribute to better matching heat sources with process needs and/or to offer more flexible electricity consumption from the grid.
The temperature of the heat supplied to the process is not specified, but the proposals will be evaluated on their potential to enable the deployment of heat upgrade solutions in more sector(s) and process(es), where they are not yet state-of-the art.
Projects must address all the following items:
Technology Readiness Level - Technology readiness level expected from completed projects
Activities are expected to achieve TRL 7-8 by the end of the project – see General Annex B. Activities may start at any TRL.
[1] https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/opportunities/topic-details/life-2024-cet-heatpumps
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
The granting authority may, up to 4 years after the end of the action, object to a transfer of ownership or to the exclusive licensing of results, as set out in the specific provision of Annex 5.
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA) 
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
Lump Sum MGA 
Call-specific instructions 
Detailed budget table (HE LS) 
Guidance: "Lump sums - what do I need to know?"
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 8. Climate, Energy and Mobility
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 3 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The “Full-scale” specified in the title “Full-scale demonstration of heat upgrade solutions in industrial processes” is developed in the objective “increase the recovery and upgrade of locally available heat for covering process needs and significantly or totally phasing out of fossil fuel use” and the specified TRL 7-8. This means that the project should not be limited to a pilot demonstration covering a small portion of heating needs, but should include full-scale or industrial-scale equipment and system that, ideally, completely replace the use of fossil fuels. If not completely, a least a significant portion of the heat produced from fossil fuels must be replaced by the new system, and full coverage should be achievable by duplicating the equipment physically demonstrated in the project, without major modifications to its design. This would be particularly true with standardized modular equipment (for example, a heat pump), several units of which can be connected in parallel to reach the required total heating power.
Read it on the EU portal ↗Answered 31 Aug 2026
Innovative integration of mature heat upgrade technology into an improved solution that enables “covering process needs and significantly or totally phasing out of fossil fuel use, while preserving or enhancing its global competitiveness” is eligible.
Read it on the EU portal ↗Answered 19 Feb 2026
The topic specifies: “Optimise and demonstrate physically within one or more operational industrial site(s), the transformation of process(es) in at least one industrial by recovering excess/waste heat from the process itself, possibly combined with local renewable heat or heat recovered in nearby locations and local thermal and/or electrical energy storage, and by upgrading the heat (e.g. with heat pump) for use in the process(es).” It means at least part of the recovered heat must come from at least one of the (sub-)processes of the targeted industrial site itself, this recovered heat can be combined with other internal or external sources, possibly from an industrial or district heat network, then upgraded, finally used in at least one the (sub-)process(es) of the same industrial site. The expected outcome “for covering process needs and significantly or totally phasing out of fossil fuel use”, excludes any significant import of waste heat recovered from another industrial plant or heating system using fossil fuel.
Read it on the EU portal ↗Answered 1 Jul 2026
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.