Loading page...
Loading page...
Synced from the EU Funding & Tenders Portal on 9 November 2026.
Based on projects the EU funded on the same subject in this programme.
Battery2LifeBATTERY Management system and System design for stationary energy storage with 2nd LIFE batteries
HORIZON-CL5-2023-D2-01-04 · 2024 · Official record ↗
SEAMLESS-PVDevelopment of advanced manufacturing equipment and processes aimed at the seamless integration of multifunctional PV solutions, enabling the deployment of IPV sectors
HORIZON-CL5-2022-D3-01-03 · 2023 · Official record ↗
PV4PlantsAgriPV system with climate, water and light spectrum control for safe, healthier and improved crops production
HORIZON-CL5-2022-D3-01-06 · 2023 · Official record ↗
exFanNovel recuperation system to maximize exergy from anergy for fuel cell powered geared electric aircraft propulsion system.
HORIZON-CL5-2023-D5-01-08 · 2023 · Official record ↗
NEXTBATNext generation technologies for battery systems in transport electrification based on novel design approach to increase performance and reduce carbon footprint
HORIZON-CL5-2022-D2-01-05 · 2023 · Official record ↗
SHINE PVSustainable, High-throughput, Industry-ready, Next-generation technology for European manufacturing leadership in PV
HORIZON-CL5-2024-D3-01-01 · 2025 · Official record ↗
Micro-Bio-CHPDevelopment of a novel highly efficient energy supply system for energy autonomous multi-family buildings based on biomass gasification coupled with an SOFC and a PV system
HORIZON-CL5-2021-D3-03-08 · 2022 · Official record ↗
ETIPPVSECSUPPORT TO THE SOLAR PHOTOVOLTAIC RESEARCH AND INNOVATION COMMUNITY TOWARDS THE IMPLEMENTATION OF THE SET PLAN BY THE ETIP PV SECRETARIAT
HORIZON-CL5-2025-02-D2-11 · 2026 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Notices the EU posted on this call, newest first. Open one to read the official text.
The submission session is now available for: HORIZON-CL5-2026-11-D3-05, HORIZON-CL5-2026-11-D3-06, HORIZON-CL5-2026-11-D3-23, HORIZON-CL5-2026-11-D3-14, HORIZON-CL5-2026-11-D3-04
Agrivoltaics or the co-location of agricultural activity and PV electricity production is a novel form of PV deployment which could provide farmers with diversified revenue sources and ecological benefits, while reducing land use competition, siting restrictions or adverse impacts on biodiversity and agricultural production. Optimizing system designs and business practices will help to enable simultaneous land use creating synergy for both agriculture and electricity production; this can benefit farmers, lower PV costs and enable the European Union to reach the goals of the EU solar energy strategy.
Similarly, offshore/nearshore PV systems represent a tremendous deployment potential in Europe and globally, due to their advantages in conserving land resources and optimizing light utilization. However, prevailing technical challenges limit deployment in most sea conditions usually found in Europe.
Project results are therefore expected to contribute to some of the following expected outcomes, depending on the proposed system (agriPV or offshore/nearshore PV):
Proposals must address only one of the two areas (agriPV or offshore/nearshore PV). They are expected to demonstrate:
Achieving societal acceptance and sustainability in agriPV development requires clarity in permitting procedures, promoting energy justice principles, mitigating agronomic risks, and balancing economic development with environmental conservation (notably biodiversity). These dimensions need to be addressed holistically with the involvement of policymakers, industry stakeholders, and local communities working towards a just and equitable deployment of agriPV. In the case of offshore/nearshore PV, aesthetic appreciation, as well as possible conflicts of interest related to water areas (with e.g., commercial shipping, fishing, sand extraction, military use, and recreational sailing) or colocation should be looked at.
Whenever the expected exploitation of project results entails developing, creating, manufacturing and marketing a product or process, or creating and providing a service, the plan for the exploitation and dissemination of results must include a strategy for such exploitation as well as a strong business case and sound exploitation strategy. The exploitation plan should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).
This topic requires the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities.
This topic implements the co-programmed European Partnership for Innovation in Photovoltaics (EUPI-PV). As such, projects resulting from this topic will be expected to report on the results to the European Partnership for Innovation in Photovoltaics (EUPI-PV) in support of the monitoring of its KPIs.
Technology Readiness Level - Technology readiness level expected from completed projects
Activities are expected to achieve TRL 7-8 by the end of the project – see General Annex B. Activities may start at any TRL.
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
To ensure a balanced portfolio, grants will be awarded to proposals not only in order of ranking but at least also to two proposals that are the highest ranked within the area of agriPV and at least also to two proposals that are the highest ranked within the area of offshore/nearshore PV, provided that proposals attain all thresholds.
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
The granting authority may, up to 4 years after the end of the action, object to a transfer of ownership or to the exclusive licensing of results, as set out in the specific provision of Annex 5.
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA) 
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
Lump Sum MGA 
Call-specific instructions 
Detailed budget table (HE LS) 
Guidance: "Lump sums - what do I need to know?"
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 8. Climate, Energy and Mobility
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 13 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The construction costs of a 5 MW AgriPV demo plant cannot be entirely funded by the supported project. Only the depreciation costs for equipment, infrastructure, and other assets, calculated based on the project duration and percentage of use in the project would be considered as eligible costs.
Read it on the EU portal ↗Answered 28 Sept 2026
The topic requires “System demonstrators of adequate scale (min 5 MW altogether) at different EU climate zones. As it calls for an Innovation Action requiring the participation of at least 3 independent legal entities, each established in a different EU Member State or Associated Country, with at least one established in an EU Member State, the 5 MW would apply to all the proposed demonstrators (in the different EU climate zones). Therefore, a single demonstrator below 5MW is an adequate scale as far as all demonstrators in the project total 5MW.
Read it on the EU portal ↗Answered 30 Oct 2026
The (at least some) innovation must relate to the physical PV system, therefore if the physical PV system is existing (and not innovatively refurbished), this demonstration site does not count towards the 5MW.
Read it on the EU portal ↗Answered 5 Oct 2026
In principle the 5 MW requirement refers to newly constructed (innovative) PV capacity.
Read it on the EU portal ↗Answered 28 Sept 2026
Read it on the EU portal ↗Answered 28 Sept 2026
Yes. New AgriPV plants that have already reached the Ready to Build (RTB) phase do count toward the 5 MW requirement, provided they are still new projects (i.e. not yet commissioned or in operation) and otherwise meet the topic requirements. Reaching RTB indicates that a project is ready for construction, but it does not change its status as a new project.
Read it on the EU portal ↗Answered 28 Sept 2026
Yes, after permits are obtained.
Read it on the EU portal ↗Answered 28 Sept 2026
The answer is no, as the topic explicitly mentions crops and not livestock.
Read it on the EU portal ↗Answered 28 Sept 2026
No, the topic is specifically dedicated on offshore/nearshore PV applications.
Read it on the EU portal ↗Answered 28 Sept 2026
The definition of nearshore can be seen researchgate.net.
Read it on the EU portal ↗Answered 28 Sept 2026
Read it on the EU portal ↗Answered 28 Sept 2026
Yes, they must.
Read it on the EU portal ↗Answered 20 Oct 2026
Yes, they must be. This is as a consequence of the fact that they must be requested during the design phase of the project (even at the start of the design phase).
Read it on the EU portal ↗Answered 13 Oct 2026
Other open or upcoming calls on related topics.
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.