Loading page...
Loading page...
Opens 15 December 2026, deadline 14 April 2027. Synced from the EU Funding & Tenders Portal on 23 November 2026.
Based on projects the EU funded on the same subject in this programme.
FLEXSHIPFlexible and modular large battery systems for safe on-board integration and operation of electric power, demonstrated in multiple type of ships
HORIZON-CL5-2022-D5-01-01 · 2023 · Official record ↗
TRUSTEEfuTure pRoof efficient and sUSTainable dEployment of zEwt
HORIZON-CL5-2024-D5-01-16 · 2025 · Official record ↗
BLAZETECBREAKTHROUGHS IN THERMAL BATTERIES THROUGH ZERO-EMISSION HIGH-TEMPERATURE STATIC THERMAL-TO-ELECTRIC CONVERTERS
HORIZON-CL5-2023-D3-03-01 · 2024 · Official record ↗
BatteReverseA next-generation automated, connected, and standardised process for increased safety, efficiency, and sustainability of Li-ion BATTEry REVERSE logistics
HORIZON-CL5-2022-D2-01-10 · 2023 · Official record ↗
NEXTBMSNEXT-generation physics and data-based Battery Management Systems for optimised battery utilization
HORIZON-CL5-2022-D2-01-09 · 2023 · Official record ↗
Battery2LifeBATTERY Management system and System design for stationary energy storage with 2nd LIFE batteries
HORIZON-CL5-2023-D2-01-04 · 2024 · Official record ↗
PHOENIXBuilding more reliable and performant batteries by embedding sensors and self-healing functionalities to detect degradation and repair damage via advanced Battery Management System
HORIZON-CL5-2022-D2-01-06 · 2023 · Official record ↗
eWAVEEfficient HV-electric modular battery and distribution systems for sustainable WAterborne VEssels
HORIZON-CL5-2024-D5-01-11 · 2025 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
76 organisations have posted on the EU portal that they are looking for partners for this call.
Project outputs and results are expected to contribute to all the following expected outcomes:
This topic aims to improve the suitability of fully-battery-electric operation of ferries, short sea shipping, offshore and inland vessels, considering the services they provide, their operation profiles and the possibilities to interact with charging infrastructure. Aspects like increasing the autonomy range of operation and fast charging are a crucial element for short sea shipping and inland routes with short docking periods. Fast charging may also put added strain on batteries in terms of output and durability. Optimization of the onboard electrical architecture and battery chemistry as well as optimized battery monitoring and management systems and more extensive training of crew can to some extent address this challenge. Life cycle aspects should be considered by design in the integration and operation of vessels, as well as the end-of-life of batteries, making sure that operations can be performed during the whole expected life of the vessel. The topic also explores the need to increase the power capability of fully electric vessels, aiming to define scenarios in which the increase of the peak propulsion power is needed to ensure the safety of operations. Proposals should cover the interface between vessels and port operations addressing the regulatory requirements, including operational procedures.
Proposals should address all the following aspects:
Proposals must justify the contribution of their objectives, results, intellectual property (IP) management and exploitation strategy to the EU added value creation and strategic autonomy throughout the supply and value chain, including competitiveness of the EU waterborne industry, enhancement of the EU’s R&I capacity, technological know-how capabilities and human capital, and resilience of the EU industrial and manufacturing base. Proposals are encouraged to prioritise shipyards, equipment manufacturers and suppliers located in the EU and EEA.
This topic implements the co-programmed European Partnership on ‘Zero Emission Waterborne Transport’ (ZEWT). As such, projects resulting from this topic will be expected to report on results to the European Partnership ‘Zero Emission Waterborne Transport’ (ZEWT) in support of the monitoring of its KPIs.
Technology Readiness Level - Technology readiness level expected from completed projects
Activities are expected to achieve TRL 8 by the end of the project – see General Annex B. Activities may start at any TRL.
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
The granting authority may, up to 4 years after the end of the action, object to a transfer of ownership or to the exclusive licensing of results, as set out in the specific provision of Annex 5.
described in Annex G of the Work Programme General Annexes.
Not applicable.
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA) 
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
HE MGA 
HE Unit MGA 
Call-specific instructions 
Not applicable.
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 8. Climate, Energy and Mobility
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Other open or upcoming calls on related topics.
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-23
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.