Loading page...
Loading page...
Opens 20 April 2027, deadline 22 September 2027. Synced from the EU Funding & Tenders Portal on 23 November 2026.
Based on projects the EU funded on the same subject in this programme.
ECO-READYAchieving Ecological Resilient Dynamism for the European food system through consumer-driven policies, socio-ecological challenges, biodiversity, data-driven policy, sustainable futures
HORIZON-CL6-2022-CLIMATE-01-04 · 2022 · Official record ↗
OceanNexusAssessing consequences in the cascading of climate Tipping in the ocean-Marine ecology-society connection
HORIZON-CL6-2025-02-CLIMATE-02 · 2026 · Official record ↗
BioDiMoBotAutonomous Longtime Aquatic Biodiversity and Ecology Monitoring Robot
HORIZON-CL6-2024-BIODIV-01-2 · 2025 · Official record ↗
CIRAWAAgro-ecological strategies for resilient farming in West Africa
HORIZON-CL6-2022-FARM2FORK-01-12 · 2023 · Official record ↗
NatureRestoreRNatureRestoreR: guiding nature restoration through integrated ecological modelling
HORIZON-CL6-2025-01-BIODIV-05 · 2026 · Official record ↗
BCOMINGBiodiversity Conservation to Mitigate the risks of emerging infectious diseases
HORIZON-CL6-2021-BIODIV-01-11 · 2022 · Official record ↗
BUTTERFLYMainstreaming pollinator stewardship in view of cascading ecological, societal and economic impacts of pollinator decline
HORIZON-CL6-2024-BIODIV-01-3 · 2025 · Official record ↗
Kappa-FluEcology and biology of HPAIV H5 (Kappa-Flu)
HORIZON-CL6-2022-FARM2FORK-02-03-two-stage · 2023 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Project results are expected to contribute to all of the following expected outcomes:
Achieving the goals of the EU biodiversity strategy for 2030, the Kunming-Montreal Global Biodiversity Framework, and assessing progress towards their defined targets, requires coherent, integrated and long-term monitoring approaches, underpinned by FAIR (Findable, Accessible, Interoperable and Re-usable) data systems. Many existing in-situ data collections (i.e. genomic assessments, ground sampling, drone and airborne observations) were not designed with Satellite Remote Sensing integration in mind (i.e. for validation and calibration, integrated data products, or statistical scaling of information) and lack the structure, interface and metadata required to support advanced analytics, including AI. FAIR data on species and ecosystems will also help to ensure that biodiversity preservation is a mainstream feature of other sectors, such as agriculture, transport, energy or the bioeconomy. There is a need for systemic, harmonised or standardised biodiversity data at Earth’s surface in order to support AI applications ranging from genome to space and to build up our knowledge on the status and trends of habitats, species, ecosystems, and on the drivers of decline.
To address these challenges, proposals should:
Proposals should earmark resources for cooperation with existing initiatives such as in-situ data collection frameworks (e.g., GBIF, OBIS, LUCAS).The Joint Research Centre (JRC) may join the selected consortium in relation to effective coordination with the EC Knowledge Centre for Biodiversity (KCBD) and its Science Service, as well as incorporating the in-situ data from European Commission steered biodiversity monitoring schemes such as LUCAS, specifically LUCAS grassland, and EMBAL (European Monitoring of Biodiversity in Agricultural Landscapes). Proposals may consider services offered by European research infrastructures[4].
This topic is part of the Biodiversity cluster of the EC-ESA Earth System Science Initiative (ESSI). Proposals should foresee sufficient mean for effective coordination with projects selected under ESA’s FuturEO programme.
[1] The “EU ecosystem typology” is a classification of ecosystem types developed by the Commission and the European Environmental Agency, in collaboration with Member States and it is tailored to meet EU needs. Its first level is legislated and is used for the reporting under in Annex IX of Regulation (EU) 691/2011.
[2] Ecotones are areas of steep transition between ecological communities, ecosystems, and/or ecological regions along an environmental or other gradient. (S. Kark, Effects of Ecotones on Biodiversity, Reference Module in Life Sciences, Elsevier, 2017, ISBN 9780128096338, https://doi.org/10.1016/B978-0-12-809633-8.02290-1)
[3] https://www.egi.eu/project/sage/.
[4] The catalogue of European Strategy Forum on Research Infrastructures (ESFRI) research infrastructures portfolio can be browsed from ESFRI website https://ri-portfolio.esfri.eu/
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
The Joint Research Centre (JRC) may participate as member of the consortium selected for funding as a beneficiary with zero funding, or as an associated partner. The JRC will not participate in the preparation and submission of the proposal - see General Annex B.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA) 
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
Lump Sum MGA 
Call-specific instructions 
Detailed budget table (HE LS) 
Guidance: "Lump sums - what do I need to know?"
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 9. Food, Bioeconomy, Natural Resources, Agriculture and Environment
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 1 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The second bullet of the Scope refers to developing technical capabilities across terrestrial, freshwater and marine ecosystems, while the third bullet allows demonstration and verification cases to focus on specific ecosystems.
Proposals may therefore focus their demonstrations on selected ecosystems, while addressing the broader objectives of interoperability and harmonisation to answer to diverse use cases, across terrestrial, freshwater and marine ecosystems in Member States and Associated Countries, including how their technical approaches contribute to these objectives.
Read it on the EU portal ↗Answered 17 Nov 2026
Other open or upcoming calls on related topics.
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-23
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.