Loading page...
Loading page...
This round is closed. Synced from the EU Funding & Tenders Portal on 9 November 2026.
Based on projects the EU funded on the same subject in this programme.
LtALighter Than Aire Hydrogen Valley
HORIZON-JU-CLEANH2-2025-06-01 · 2026 · Official record ↗
PYRAH2Pyrolytic Renewable Approach for Hydrogen and Carbon Production: Efficient Transformation of Biogenic Wastes into Hydrogen and High-Value Solid Carbon for New Industrial Value Chains
HORIZON-JU-CLEANH2-2025-01-06 · 2026 · Official record ↗
HiWhyVHigh Coast to West Coast Hydrogen Valley
HORIZON-JU-CLEANH2-2025-06-01 · 2026 · Official record ↗
FlHyPortsFlemish Hydrogen Ports Valley
HORIZON-JU-CLEANH2-2025-06-02 · 2026 · Official record ↗
PermittHyTraining Permitting Staff in Hydrogen Techologies
HORIZON-JU-CLEANH2-2025-05-03 · 2026 · Official record ↗
CRYOSTARCertification Roadmap to Yield an Optimal and Safety methodology of crashworthiness for an integrated cryogenic Tank for liquid hydrogen storAge on board of future aiRcraft
HORIZON-JU-CLEAN-AVIATION-2025-03-FTA-02 · 2025 · Official record ↗
CAVENDISHConsortium for the AdVent of aero-Engine Demonstration and aircraft Integration Strategy with Hydrogen
HORIZON-JU-CLEAN-AVIATION-2022-01-HPA-01 · 2023 · Official record ↗
H2SCOREHydrogen Storage and Fuel Cells for Optimised Renewable Energy Communities
HORIZON-JU-CLEANH2-2025-04-01 · 2025 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
As Europe strives towards its objective of climate neutrality, renewable hydrogen at industrial scale is pivotal for decarbonising energy-intensive sectors. Large-scale water electrolysis is central to this transition, yet Europe faces significant challenges in building gigawatt-scale hydrogen production plants that are reliable enough to ensure consistent operation and financially sustainable to attract unsubsidised investment. Current projects struggle with costly and fragmented system integration, limited scalability from electrolyser providers and unoptimised Balance-of-Plant (BoP) systems, resulting in high electrolytic hydrogen costs. In particular:
Aside from these hurdles, the BoP of a hydrogen plant can be built with components (pumps, exchangers, separators, piping, instruments, compression, purification, storage etc.) that already have a high level of maturity inherited from similar industries (oil & gas, water, etc.), apart from stacks for which iterative improvements are still expected.
Thus, it is possible to overcome some of the current limitations by relying on mature components while exploring innovative new plant architectures (electrical, process), new construction philosophies, new integrations between parts of the plant, etc., pushing the mature components to their current capacity limits.
The main challenge is to achieve a unified vision of different stakeholders (OEM, integrator, EPC contractors, operators, developers, etc.) in the design of a hydrogen plant, with a common objective of making it as cost-effective and reliable as possible. Moving away from the pre-existing model to create a new one is challenging even if based on mature components as it requires opening/exploring/closing multiple ways in parallel by engaging all stakeholders in the discussion.
By building robust and efficient system designs, the projects outcomes should identify best fit evolutions to expect in future steps for components becoming bottlenecks to improve and optimise factories, and by such paving the way to future works at European level.
The results are expected to position Europe as a global leader in designing and implementing gigawatt-scale hydrogen plants, stimulate industrial investment, and foster a sustainable hydrogen economy through innovation, integration, and cost-efficiency.
Project results are expected to contribute to the following expected outcomes:
Project results are expected to contribute to the following objectives at the full plant scope:
More specifically for the electrolysis part of the plant, the project results should contribute to the relevant KPIs of the SRIA[4], with an objective to reach 2030 targets in priority. As an example for alkaline technology : Electrical Consumption at 48kWh/kg, CAPEX at 400 €/kW, O&M cost at 35 €/kg/day/year, Turn-Down Ratio (Cold start 300s).
This topic aims to drive innovation in integrated hydrogen production plants by reimagining plant design, architecture, and deployment models. The focus should be on developing novel concepts for highly efficient, cost-competitive, and reliable electrolytic hydrogen production plants at very large scales (≥400 MW), leveraging commercially available electrolyser stacks, advanced system engineering, and innovative BoP and plant components (e.g., purification, compression, thermal integration, power electronics). As relevant, the design specifications and components innovation roadmaps (e.g to optimise performances and durability when operating dynamically or improve end of life recycling), is also encouraged.
Proposals should deliver a complete fully replicable plant concept: a hydrogen production facility capable of delivering renewable hydrogen ex-works (without transport) at highest consumption quality, using available resources (e.g. water and electricity) and complying with EU regulations (notably RFNBO criteria).
The project should cover the following elements:
Proposals should include RAM analysis, CAPEX Class 3 estimates with FEED-level documentation, and clear OPEX, energy, and water consumption assessments. Designs development will be supported by advanced modelling and optimisation tools to enable robust techno-economic analyses and guide system optimisation. Innovation will focus on system-level integration using existing, proven electrolyser stacks. Proposals should also validate the proposed approach through a representative project case study, demonstrating practical feasibility and scalability. The designed system will target a minimum capacity of 400 MW, with a clear pathway to scale up to 1 GW and beyond.
The following elements are out of scope:
Consortia should include various stakeholders of the hydrogen value chain including, but not limited to, components manufacturers, system manufacturers (at least 2), system integrators, project developers, plant operators, end users, etc. Consortia will gather all technical & economic expertise needed not only for the implementation of the project but also will associate related sectorial clusters and associations helping to ensure the replicability of the project outcomes. To support the replicability of the projects outcomes, project outputs e.g. deliverables, models, etc. are expected to be mainly publicly available.
Projects should build on previous, and find synergies with projects supported under this year Call such as but not only HORIZON-JU-CLEANH2-2026-01-04 ‘Innovative business models advancing renewable electrolysis integration in industry‘ and projects supported by the Process4Planet Partnership and Clean Steel Partnership as well as those projects, activities and initiatives supported by and placed under the Innovation Fund.
For additional elements applicable to all topics please refer to section 2.2.3.2
The JU estimates that an EU contribution of maximum EUR 2.50 million would allow these outcomes to be addressed appropriately.
[1] https://www.hydrogeninsight.com/electrolysers/cost-of-electrolysers-for-green-hydrogen-production-is-rising-instead-of-falling-bnef/2-1-1607220
[2] https://www.iea.org/reports/global-hydrogen-review-2024
[3] https://www.tweedekamer.nl/downloads/document?id=2024D22079
[4] https://www.clean-hydrogen.europa.eu/knowledge-management/strategy-map-and-key-performance-indicators/clean-hydrogen-ju-sria-key-performance-indicators-kpis
[5]
[6] https://cordis.europa.eu/project/id/101137925
[7] https://cordis.europa.eu/project/id/101112220
[8] https://cordis.europa.eu/project/id/101111784
[9] https://cordis.europa.eu/project/id/101111899
[10] https://cordis.europa.eu/project/id/101192352
[11] https://cordis.europa.eu/project/id/101192503
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
Page limit for Innovation Actions: For all Innovation Actions the page limit of the applications are 70 pages.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
Additional eligibility condition: Maximum contribution per topic
For some topics, in line with the Clean Hydrogen JU SRIA, an additional eligibility criterion has been introduced to limit the Clean Hydrogen JU requested contribution mostly for actions performed at high TRL level, including demonstration in real operational environment and with important involvement from industrial stakeholders and/or end users such as public authorities. Such actions are expected to leverage co-funding as commitment from stakeholders. It is of added value that such leverage is shown through the private investment in these specific topics. Therefore, proposals requesting contributions above the amounts specified per each topic below will not be evaluated
Additional eligibility condition: Membership to Hydrogen Europe / Hydrogen Europe Research
For the topics listed below, in line with the Clean Hydrogen JU SRIA, an additional an additional eligibility criterion has been introduced to ensure that one partner in the consortium is a member of either Hydrogen Europe or Hydrogen Europe Research. This concerns topics targeting actions for large-scale demonstrations, flagship projects and strategic research actions, where the industrial and research partners of the Clean Hydrogen JU are considered to play a key role in accelerating the commercialisation of hydrogen technologies by being closely linked to the Clean Hydrogen JU constituency, which could further ensure full alignment with the SRIA of the JU. This approach shall also ensure the continuity of the work performed within projects funded through the H2020 and FP7, by building up on their experience and consolidating the EU value-chain. In the Call 2026 this applies to: development and demonstration of flexible and standardised hydrogen storage systems and demonstration and operation of reversible solid oxide cell systems operation for local grid-connected hydrogen production and utilisation. This will also apply to the Hydrogen Valleys (flagship) topics as they are considered of strategic importance for the European Union ambitions to double the number of Hydrogen Valleys by 2025 as well as to the more recent European Commission’s inspirational target to have at least 50 Hydrogen Valleys under construction or operational by 2030 across the entire EU. For the Hydrogen Valleys topics a large amount of co-investment/co-funding of project participants/beneficiaries including national and regional programmes is expected.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
STEP (Sovereignty) Seal
For the Hydrogen Valleys topics, as shown below, STEP Seal (so called “Sovereignty Seal” under the STEP Regulation) will be awarded to proposals exceeding all of the evaluation thresholds set out in this Annual Work Programme. The STEP Seal is a label, which aims to increase the visibility of quality projects available for funding and help attract alternative and cumulative funding for quality projects, and simultaneously to provide a potential project pipeline for regional and national programmes.
STEP (Sovereignty) Seal is applicable to the following topics:
6. Legal and financial set-up of the grants
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
In addition to the standard provisions, the following specific provisions in the model grant agreement will apply:
1. Lump Sum
This year’s call for proposals will take the form of lump sums as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021- 2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025)[2].
Lump sums will be used across all topics in the Call 2026.
[2] DECISION authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) ls-decision_he_en.pdf (europa.eu)
2. Full capitalised costs for purchases of equipment, infrastructure or other assets purchased specifically for the action
For some topics, in line with the Clean Hydrogen JU SRIA, mostly large-scale demonstrators or flagship projects specific equipment, infrastructure or other assets purchased specifically for the action (or developed as part of the action tasks) can exceptionally be declared as full capitalised costs. This concerns the topics below:
3. Subcontracting
For all topics: an additional obligation regarding subcontracting has been introduced, namely that subcontracted work may only be performed in target countries set out in the call conditions.
The beneficiaries must ensure that the subcontracted work is performed in the countries set out in the call conditions.
The target countries are all Member States of the European Union and all Associated Countries.
4. Intellectual Property Rights (IPR), background and results, access rights and rights of use (article 16 and Annex 5 of the Model Grant Agreement (MGA))
An additional information obligation has been introduced for topics including standardisation activities: ‘Beneficiaries must, up to 4 years after the end of the action, inform the granting authority if the results could reasonably be expected to contribute to European or international standards’. These concerns the topics below:
described in the chapter 2.2.3.2 of the Clean Hydrogen JU 2026 Annual Work Programme
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Application form - Part B (HE CleanH2 RIA, IA)
Application form - Part B (HE CleanH2 CSA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Standard evaluation form (HE CSA)
Guidance
HE Programme Guide
Model Grant Agreements (MGA)
Lump Sum MGA
Call-specific instructions
Detailed budget table (HE LS) 
Clean Hydrogen JU - Annual Work Programme 2026 (AWP 2026)
 AWP 2026
Clean Hydrogen JU - Strategic Research and Innovation Agenda (SRIA) 
SRIA Clean Hydrogen JU
Lump Sums Guidance
Guidance: "Lump sums - what do I need to know?"
Comprehensive information on lump sum funding in Horizon Europe 
FAQ on Call HORIZON-JU-CLEANH2-2026
FAQ Document
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.