Loading page...
Loading page...
This round is closed. Synced from the EU Funding & Tenders Portal on 9 November 2026.
Based on projects the EU funded on the same subject in this programme.
GENIUSGENIUS: 6G connEcted eNvironments for logIstics and mUltimodal tranSportation
HORIZON-JU-SNS-2025-02-STREAM-D-01 · 2026 · Official record ↗
Moore4PowerMore than Moore for Disruptive Innovations in Power Electronics
HORIZON-JU-CHIPS-2025-IA-two-stage · 2026 · Official record ↗
IMAGIOIMAGING AND ADVANCED GUIDANCE FOR WORKFLOW OPTIMIZATION IN INTERVENTIONAL ONCOLOGY
HORIZON-JU-IHI-2022-01-02 · 2023 · Official record ↗
NexaSphereNexaSphere: NexGen 3D Networks Spin Harmonies across 6G, AI, and unified TN/NTN.
HORIZON-JU-SNS-2024-STREAM-B-01-03 · 2025 · Official record ↗
SEASONSElf-mAnaged Sustainable high-capacity Optical Networks
HORIZON-JU-SNS-2022-STREAM-A-01-03 · 2023 · Official record ↗
tRail5.0Driving the digital transformation of the European rail ecosystem towards Industry 5.0
HORIZON-JU-ER-2025-EXPLR-01 · 2026 · Official record ↗
ADROIT6GDistributed Artificial Intelligence-driven open and programmable architecture for 6G networks
HORIZON-JU-SNS-2022-STREAM-B-01-01 · 2023 · Official record ↗
CHASSISChiplet-based Hardware Architectures for Software-defined Vehicles
HORIZON-JU-CHIPS-2025-IA-HPA · 2025 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Building upon the results of S2R, Europe’s Rail FP6-Future and Pods4Rail projects as well as EU-member states rail research and innovation activities, the action stemming from this topic is expected to contribute to provide sustainable, attractive and passenger centred solutions to regional and suburban areas by developing light weight and cost efficient rolling stock and an automated Multi-Modal Mobility-System with “moving infrastructures”.
Workstream 1: Flagship Area 6 Rolling Stock cluster
Work-stream 1 aims at further developing a regional railway vehicle which is a small lightweight vehicle based on the results of EU-Rail FP6-Future[1], adapted according to numerous specific requirements influenced by the different lines and the corresponding categories of regional lines (e.g. topography, passenger capacity, etc.). The key objectives are the cost reduction and adaptation to the corresponding infrastructure of capillary lines (poor superstructure, narrow curves etc.). These factors have a high influence on the mechanical and electrical architecture of the vehicle and thus on the car body design and the running gears.
To ensure the alignment with the key objectives, close monitoring will be implemented using key performance indicators (KPIs). Within FA6 a set of High level KPIs has been identified, targeting the main impacts foreseen for the Flagship Area.
Work-stream 2: Automated Multi-Modal Mobility-System with “moving infrastructures”
This work-stream should further develop an Automated Multi-Modal Mobility-System system design, based on the results of the EU-Rail Pods4Rail[2] project which defined the foundations for such a system. Design concepts for the Carrier on rail but also on road and conceptual design of a selected sample Transport Units, as well as for components and equipment for the Transport Units were drafted.
This work-stream should specify the technical requirements of the main subsystem of a pod system with specific focus on the Carrier, Transport Unit and the Handling System. The focus should remain on the railway application, however, intramodality should be ensured by considering road and ropeway carriers.
This workstream should further work on the development of the Mobility Management System already started in the Pods4Rail project and to further detail the technical basis for the autonomous operation of the system, including the investigation of system components of the Mobility Management System in a laboratory environment.
In addition, the political, economic, social, technical, legal and environmental (PESTLE) consideration of the realisation of a pods system should be assessed as well as developing concepts for integration into existing multimodal mobility environment.
The project stemming from this topic should develop under the following capabilities the enablers and any other which may contribute to deliver the afore-mentioned expected outcome:
Workstream 1: Flagship Area 6 Rolling Stock cluster
This work-stream should develop a virtual concept design for lightweight modular regional vehicles for both G1 (Group 1: regional lines with significant connection with mainline) and G2 (Group 2 regional lines with no or limited connection with mainline) lines (TRL4/5) based on the technical parameters defined for solutions developed in FP6-Future D5.1[3] coming from additional requirements collected from regional rail operators and considering potential dual use operation ( civilian and military purposes). The virtualisation should focus on the following not extensive list of key vehicle components such as the car body, running gear and powertrain.
The action should demonstrate the safety with an appropriate safety assessment method. In addition, it shoulddemonstrate the benefit deriving from the new vehicle concept on Society Reediness (SR), on weight and energy consumption reduction as well as on cost saving both for CAPEX and OPEX in a quantitative manner. The results should support European standardisation activities to ensure a broad market uptake coming from the new vehicle concept.
Develop, test and validate the following components considering a small vehicle concept for G1 lines up to intended environment:
Work-stream 2: Automated Multi-Modal Mobility-System with “moving infrastructures“
null
Activities are expected to achieve a minimum between TRL 4 and TRL 6, depending on the enabler addressed, or higher by the end of the project – see part B of the Horizon Europe Work Programme 2026-2027 General Annexes for a guide to the TRL definitions and criteria to be used.
[1] https://rail-research.europa.eu/rail-projects/fp6-future/
[2] https://rail-research.europa.eu/rail-projects/pods4rail/
[3] https://rail-research.europa.eu/pages/fp6-future/deliverables
[4] https://pods4rail.eu/#deliverables
[5] https://pods4rail.eu/#deliverables
[6] https://pods4rail.eu/#deliverables
1. Admissibility Conditions: Proposal page limit and layout
Regarding admissibility conditions and related requirements, part A of the Horizon Europe Work Programme 2026-2027 General Annexes applies, with the following exception: the limit for a full Research and Innovation Action application is set to 70 pages.
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
The granting authority can fund a maximum of one project.
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
The award criteria included in part D of the Horizon Europe Work Programme 2026 – 2027 General Annexes are complemented with additional criteria as specified in Annex VIII to this Work Programme.
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
The starting date of grants awarded under this topic may be as of the submission date of the application. Applicants must justify the need for a retroactive starting date in their application. Costs incurred from the starting date of the action may be considered eligible.
As specified in section 2.3.8.1 of the Work Programme, in order to facilitate the contribution to the achievement of the EU-Rail objectives, the options regarding 'linked actions' of the EU-Rail Model Grant Agreement and the provisions therein, is enabled in the corresponding EU-Rail Grant Agreements.The action that is expected to be funded under this topic will be complementary to the following projects:
The action that is expected to be funded under this topic will be complementary to the actions that are expected to be funded under the following topics:
Please note that the list is non-exhaustive as additional Linked Projects may follow at a later stage of the programme implementation to complement the activity.
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
In addition, as specified in section 2.3.8.1 of the Work Programme, and to facilitate contributions to considering the key contributing role of this topic, in designing the dissemination and communication activities, the proposal shall consider that the project will be part of the overall EU-Rail Programme and to ensure coherence across the programme and alignment with Europe’s Rail objectives will have to follow the Europe’s Rail Communication and Dissemination Guidelines for Europe’s Rail Funded Projects as described in the EU-Rail Governance and Process Handbook (https://rail-research.europa.eu/about-europes-rail/europes-rail-reference-documents/functioning-of-the-europes-rail-ju/)
described in Annex G of the Work Programme General Annexes.
Indicative Budget
The total indicative budget for the topic is EUR 3.1 million.
Applicant Private [As defined in Article 2(5) of Council Regulation (EU) 2021/2085.] Members of the EU-Rail part of consortia responding to this topic must provide in-kind contributions to additional activities to be declared via the template model available on the F&T portal. The amount of total in-kind contributions (i.e. in-kind contributions for operational activities and in-kind contributions for additional activities) must be no less than 1.263 [In order to support a leverage factor of no less than the ratio between the contribution from members other than the Union and the Union financial contribution, as on the basis of Articles 88 and 89 of Council Regulation (EU) 2021/2085.] times the funding request, in aggregate, of these applicant Private Members. Any discrepancy must be well and duly justified.
In this respect, the grant agreements will set, in principle, annual deliverable on in-kind contributions for the projects selected under this topic, as well as mandatory reporting requirements, for those applicants who are Private Members of EU-Rail.
Indicative Project Duration
42 months. This does not preclude submission and selection of a proposal with a different project duration.
Contribution to the monitoring and implementation, standardisation, of the EU-rail Programme
Applicants are expected to deliver relevant information (data, results, etc.) as mutually agreed, to the JU and the Linked Project[s] to contribute to the advancement of the Innovation and System Pillars [Refer to the revised Multi-Annual Work Programme available https://rail-research.europa.eu/wpcontent/uploads/2024/06/Annex_GB-Decision_08_24_Revised_MAWP.pdf] activities, as well as in view of the development and implementation of EU policy and legislation (including Technical Specifications for Interoperability and Common Safety Methods) and the development of European standards. As specified in section 2.3.8.1 of the Work Programme, and to facilitate contributions to European or international standards, the EU-Rail grant agreements will include an additional information obligation related to standards. Beneficiaries must inform EU-Rail (up to four years after the end of the action) if the results can be reasonably expected to contribute to European or international standards.
Key Performance Indicators
Work-stream 1 should actively contribute to measure and monitor the specific quantitative KPIs as defined in the expected impact, including its contribution to the Europe’s Rail Master Plan impacts. Outcomes are to be delivered at a calendar annual basis by each year end.
Collaboration work required with other Destinations
Work-stream 1 should foresee activities/tasks related to the regional rail architecture and integrated demonstration concept to the actions to be funded under HORIZON-JU-ER-2025-FA6-01.
Interaction with the System Pillar
The System Pillar aims to guide, support and secure the work of the Innovation Pillar (i.e. to ensure that research is targeted on commonly agreed and shared customer requirements and operational needs, compatible and aligned to the system architecture), and the Innovation Pillar will impact the scope of the System Pillar where new technologies or processes mean that innovations can drive a change in approach, as well as delivering detailed specifications and requirements. In this respect, the proposal should allocate necessary resources that would be dedicated to areas linked to the System Pillar conceptual and architecture works – particularly addressing specification development and demonstration activities following architectural aspects.
The alignment of the activities will primarily take place during the Grant Preparation Phase and ramp up phase of the awarded proposal, and there will be continued, structured and regular interaction through the life of the project.
The action should actively contribute to the update of the EU-Rail Standardisation and TSIs input plan (STIP) wherever relevant. Similarly, the action should contribute to the development and implementation of EU policy and legislation including Technical Specifications for Interoperability (especially input on weight reduction impacting the TSI LOC and PASS) and Common Safety Methods, as well as to publications of the System Pillar.
Gender dimension
In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement.
Other
It is expected that the project stemming from this topic:
Europe's Rail - Work Programme 2026
Europe's Rail Master Plan
Europe's Rail - Multi Annual Work Programme
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Application form - Part B (HE EU-RAIL, RIA)
Evaluation form templates — will be used with the necessary adaptations
Evaluation form (HE EU-RAIL, RIA/IA)
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
Lump Sum MGA 
Call-specific instructions 
Information on financial support to third parties (HE) 
Guidance: "Lump sums - what do I need to know?"
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.