Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Projects the EU funded under this call, with the organisation that led each one.
VERTI-GOVertical Operations ready to GO
Led by Honeywell International Sro · Czech Republic · 2026 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
GOF3GOF3 – Get Operations Fused; Shared Situational Awareness and Decision Support for Crewed and Uncrewed Aircraft in Controlled and Uncontrolled Low-Level Airspace
HORIZON-SESAR-2025-DES-IR-02-WA6-2 · 2026 · Official record ↗
PRIAMPlanning Regional-Scale Multimodal Operations for Innovative Air Mobility Services
HORIZON-SESAR-2023-DES-ER2-WA1-6 · 2024 · Official record ↗
ECHO 2European Concept for Higher Altitude Operations Phase 2: Towards the integration between Air Traffic Management and Higher Altitude Operations
HORIZON-SESAR-2022-DES-IR-01-WA3-2 · 2023 · Official record ↗
CICONIAClimate effects reduced by Innovative Concept of Operations - Needs and Impacts Assessment
HORIZON-SESAR-2022-DES-IR-01-WA2-1 · 2023 · Official record ↗
ZEUSZero/low Emission Aircraft Integration into Future European Air Traffic System
HORIZON-SESAR-2025-DES-ER-03-WA2-2 · 2026 · Official record ↗
NATICANext-Generation ATS Platform for Innovative, Climate-Conscious, and Secure Air Traffic Management
HORIZON-SESAR-2025-DES-IR-02-WA3-1 · 2026 · Official record ↗
DiFeRentDigital Flight enhanced Rules, enabling new technologies
HORIZON-SESAR-2025-DES-ER-03-WA1-2 · 2026 · Official record ↗
RESPONSEREduced or Single Pilot Operation iNcapacitation Safety Enhancement
HORIZON-SESAR-2023-DES-ER2-WA2-2 · 2024 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
To significantly advance the following development actions:
Research shall take into consideration the work done under EASA[1] on this element, especially in relation to General Aviation i-conspicuity needs.
The following list of R&I needs is proposed as an illustration of the potential project content, but it is not meant as prescriptive. Proposals may include other research elements beyond the proposed research elements below if they are justified by their contribution to achieve the expected outcomes of the topic and are fully aligned with the development priorities defined in the European ATM Master Plan.
EC IR 2014/1111[2] established the requirements for operations of crewed VCA, with specific requirements for the specification in the operational flight plan of at least two safe landing options at the destination, as well as adequate vertiports, diversion locations for VTOL aircraft (carrying out flights for medical missions in urban areas) (VEMs) operating sites that are available and permit a landing to be executed in a critical failure for performance (CFP). The research must establish how to fulfil this requirement from the ATS perspective, addressing:
The research must address the following cases:
The research must aim at delivering a TRL6 solution aimed at enabling the deployment of crewed VFR VCA and Progress towards a future solution applicable to crewed IFR VCA, for which an FF-ICE flight plan acceptance process must be defined and validated (for this point, coordination with relevant projects in WA1 and WA3 is required).
This element covers vertiport management for vertiports located in controlled airspace (class A-D) – which could also be in U-space airspace - and vertiports located in uncontrolled airspace (class F and G) that is not also declared as U-space airspace. Vertiports located in uncontrolled airspace that is also U-space airspace are covered in the element below (in this same WA).
Note that there is on-going work under project EUREKA.
This element covers vertiport management functions and activities that impact traffic management for vertiports located in U-space airspace, bearing in mind the constraints imposed by battery powered aircraft. This may include:
These processes should be identified, and consideration given to their optimisation in the context of U-space including collaborative decision making and coordination as appropriate. Note that there is on-going work under project EUREKA.
This topic covers vertiport management for vertiports in uncontrolled airspace (airspace F and G) that is also declared to be U-space airspace (expected to have significant traffic of small drones); the focus of the research is to ensure separation between small drones and VCA vertiport users. Vertiports that are not located under U-space airspace or that are located in U-space airspace in controlled airspace are covered by the element above (in this same WA).
Initially, the scope is focused on crewed VCA operations, but it is expected that the same concepts will be applicable for uncrewed VCA.
The aim of the research is to develop the concept for IFR crewed VCA, building on existing SESAR solutions for IFR helicopters “Optimised low-level IFR routes for rotorcraft” (SESAR solution #113) and “Independent rotorcraft operations at airports” (SESAR solution PJ.02-05). The solution should assess the applicability of existing IFR rotorcraft procedures and flight planning processes to VCA, adapting them where necessary.
In particular, the research must assess how VCA energy management constraints may affect the capability of VCA aircraft to follow the type of IFR clearances in use for helicopters and develop and validate their use for VCA, proposing and validating new clearances where needed.
Note the flight planning aspects related to the introduction of the landing sites in the FF-ICE flight plan should are linked to vertiport management and hence in scope of the previous bullet point “Vertiport management for crewed VCA”.
The objective of this element is to address pilot digital assistance and automation support for the VCA cockpit to support a simplified VCA workload (e.g., aimed at a reduction of VCA crew workload related to pilot’s tasks and tasks related to communication with ATM, implementation of tactical ATC clearances, and on-board implementation of strategic changes to the flight plan in the execution phase for IFR VCA (after an FF-ICE/R2 revision process). The scope includes in particular the development of cockpit automation to support a concept for digital ATM communications via CPDLC during all phases of flight (en-route, TMA and airport).
The ultimate objective is to make it possible that the flight crew workload is reduced to support the concept of one remote pilot overseeing from its working position two or more VCAs.
Note that there is on-going work on this research element under project OPERA.
The scope includes the development of navigation and procedures to enable all -weather take-off and landing for crewed or uncrewed VCA. Resilience of the navigation solution must be addressed. The solution is expected to progress from an initial flight-director-based concept towards the end goal of autopilot-based ATOL. Charts, procedure design and avionics should be addressed. Note that similarly to what happens today with Autoland for fixed-wing aircraft today, air traffic aspects e.g. clearance for approach, take-off and landing are not different in ATOL from vs. manual TOL (just like whether Autoland is used does not change the way ATM currently manages a flight), and hence do not need to be covered by this solution.
Note that there is on-going work on this research element under project OPERA.
VCA will first be certified as VFR, to later progress to IFR. The objective of the research is to increase the level of automation of VFR aircraft by ATC and FIS. Flight data processing systems (FDPSs) are designed for supporting ATC in the management of IFR aircraft, and typically do not provide adequate functionality to support ATC for the management of VFR aircraft. This results in VFR flights often causing unexpected ATS workload in the lower airspace. Research shall develop ATS automation tools and procedures to provide ATC or FIS services to VFR aircraft in airspace C-G and FIS services to IFR aircraft in uncontrolled airspace (airspace F and G). Research shall aim, as much as possible, at developing tools and concepts that can be applicable to both ATC (TWR or En-Route/TMA) and AFIS. The tools and procedures to be applicable will be applicable for all equipped VFR aircraft (not just VCA):
This research will pave the way for the introduction of digital flight rules, which is currently in scope of exploratory research.
[1] https://www.easa.europa.eu/en/research-projects/i-conspicuity-interoperability-electronic-conspicuity-systems-general-aviation
[2] https://eur-lex.europa.eu/eli/reg_impl/2024/1111/oj
[3] European Commission Implementing Rules EU IR 2021/664 and EU IR/665.
1. Admissibility Conditions:
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
This call is subject to restrictions for the protection of European communication networks.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in subsection 2.5 of the BAWP 2024-2025
Weighting per criteria in additions to the general award criteria:
Excellence: 40%
Impact: 40%
Implementation: 20%
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
The evaluation committee may be composed partially of representatives of EU institutions and agencies (internal experts).
To ensure a balanced portfolio, grants will be awarded to applications not only in order of ranking but at least also to those that are the highest ranked within topics within the same work area, provided that the application attains the threshold.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
described in Annex G of the Work Programme General Annexes.
The following exceptions apply.
1) A funding rate of 70% applies to all beneficiaries (regardless of their legal status).
2) Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programmefor Research and Innovation (2021-2027) – and in actions under theResearch and Training Programme of the European Atomic Energy Community (2021-2025).
3) Beneficiaries will be subject to the following additional dissemination obligations:
4) Beneficiaries will be subject to the following additional exploitation obligations:
For the purpose of complying with the objectives set in Council Regulation (EU) 2021/2085, the SRIA and the European ATM Master Plan,
Beneficiaries must acknowledge these obligations and incorporate them into the proposal, outlining the efforts they will make to meet them, and into Annex I to the grant agreement.
5) Grants awarded under this topic will be linked to the following actions:
Call HORIZON-SESAR-2022-DES-IR-01
Call HORIZON-SESAR-2022-DES-ER-01
A collaboration agreement is required.
The integration of a gender dimension (sex and gender analysis) into R&I content is not a mandatory requirement.
The maximum project duration is 36 months.
Call documents:
SESAR 3 Joint Undertaking Bi-Annual Work Programme (BAWP) 2024-2025 - Annex III
Application form templates
Standard application form (HE RIA, IA) - please note that only Part A of this template is applicable for this call. For Part B, see below.
SESAR 3 application form (RIA, IA) - Part B - this application form specific for this call is available in the Submission System.
Detailed budget table (HE LS)
Evaluation form templates
Standard evaluation form (HE RIA, IA) - will be used with the necessary adaptations based on specific award criteria (see BAWP, Annex III, section 2.5).
Model Grant Agreements (MGA)
Lump Sum MGA
Call-specific instructions
Guidance: "Lump sums - what do I need to know?"
Additional documents:
SESAR 3 Joint Undertaking Multi-Annual Work Programme (MAWP) 2022-2031
SESAR 3 Project Handbook
SESAR 3 Q&A Document
HE Main Work Programme 2023–2025 – 1. General Introduction
HE Main Work Programme 2023–2025 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2025 – 12. Missions
HE Main Work Programme 2023–2025 – 13. General Annexes
Council Regulation 2021/2085 of 19 November 2021 establishing the Joint Undertakings under Horizon Europe (SBA)
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.