This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Notices the EU posted on this call, newest first. Open one to read the official text.
EVALUATION results
Published: 18.04.2023
Deadline: 07.09.2023
Available budget: EUR 14 950 000
The results of the evaluation are as follows:
Topic LIFE-2023-PLP-CLIMA:
Number of proposals submitted (including proposals transferred from or to other calls): 0
Number of inadmissible proposals: 0
Number of ineligible proposals: 0
Number of above-threshold proposals: 0
Total budget requested for above-threshold proposals: EUR 0
Topic LIFE-2023-PLP-ENER:
Number of proposals submitted (including proposals transferred from or to other calls): 2
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of above-threshold proposals: 1
Total budget requested for above-threshold proposals: EUR 599 631.21
Topic LIFE-2023-PLP-Bauhaus-Phoenix-Emerald:
Number of proposals submitted (including proposals transferred from or to other calls): 16
Number of inadmissible proposals: 1
Number of ineligible proposals: 8
Number of above-threshold proposals: 5
Total budget requested for above-threshold proposals: 4 799 883.83 EUR
We recently informed the applicants about the evaluation results for their proposals.
On 7 September 2023, a total of 34 proposals were submitted in response to the following topics:
The submission session is now available for: LIFE-2023-PLP-CLIMA(LIFE-PJG), LIFE-2023-PLP-ENER(LIFE-PJG), LIFE-2023-PLP-Bauhaus-Phoenix-Emerald(LIFE-PJG), LIFE-2023-PLP-NAT-ENV(LIFE-PJG)
Expected Impact:The specific project awarded in the framework of this call shall have a substantial support to policy development and legislative implementation on Vehicle-to-Grid integration leading to:
These actions shall ultimately contribute significantly to peak-shaving and to decouple electric power generation from fossil fuels.
Applicants are expected to define, calculate, explain and achieve the expected impacts as described in the Award criterion ‘Impact’
Objective:Based on article 11 of the LIFE Regulation 2021/783, the LIFE Multi Annual Work Programme 2021-2024, includes the possibility to finance each year a limited number of projects designed to support specific needs for the development and implementation of Union environment policy and legislation. Once a year, in consultation with Member States, the Commission makes an inventory of the specific needs regarding the development and implementation of Union environmental or climate policy and legislation that need to be addressed during the following years and identifies among them the needs that could be addressed by specific projects.
Scope:Specific project:
The proposed project should develop and check the feasibility of legislation/support schemes enabling the use of EV batteries (when connected) as home batteries / to feed energy communities – and removing any potential administrative barrier (including to their authorisation), when plugged in with smart plugs at home / in collective residential buildings / @work / roadside “slow” charging points. The project shall include a dissemination exercise for public authorities across Member States.
Specific need addressed:
In quantitative terms EV battery storage is notable relevant as:
1) Cars are parked about 95% of the time – most of this time EVs can be plugged-in.
2) EVs batteries are relatively big, also compared to home batteries (to make a comparison, a standard Power wall is 9 to 18 kWH, an EV battery typically 75 kWH, up to 100 kWh (with city cars around 50 kWh) – a large potential for storage – and for smart charging; as IEA recalls, we will need a huge amount of diffused and concentrated energy storage to decarbonise energy – and EVs will be a large contributor (with thermal energy stored in highly-insulated tanks via Heat Pumps, this is the major source of demand flexibility); we are all evolving not only to prosumers, but to actors in a real-time pricing market, where electricity can be extremely cheap when lots of renewables are producing and no thermal power plant Is running, to very expensive in peaks.
3) We already supported – at corporate fleet level, through the Innovation Fund, “Virtual Power Plants” constituted by fleets managed by an energy aggregator.
Still, the absence of an incentivising legislative framework might entail administrative barriers and red tape preventing this potential to be exploited.
1. Admissibility conditions: described in section 5 of the call document 
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in section 6 of of the call document
3. Other eligibility conditions: described in section 6 of the call document
4. Financial and operational capacity and exclusion: described in section 7 of the call document
6. Legal and financial set-up of the grants: described in section 10 of the call document
Documents
Call documents:
Call document
Standard application form
Mandatory Annexes to the application form
Detailed budget table 
Participant information
Optional Annexes:
Letters of support
Cofinancing declaration
Maps
Description of sites
LIFE Reference Documents
LIFE Programme General MGA v1.0
Annoted Model Grant Agreement (AGA)
EU Financial Regulation 2018/1046 
LIFE Regulation 2021/783
LIFE Work Programme 2021-2024
Confirm the current call documents and submission conditions with the funding authority.