Loading page...
Loading page...
This round is closed. Synced from the EU Funding & Tenders Portal on 9 November 2026.
Projects the EU funded under this call, with the organisation that led each one.
LIFE25-CET-RENReadyRenewable Energy National Readiness for Certification of Installers (RENReady)– Empowering Skills and Compliance
Led by Centre for Renewable Energy Sources and Saving Fondation · Greece · 2026 · Official record ↗
LIFE25-CET-RAA-PERMIT-BOOSTBoosting Renewable Energy Acceleration Implementation
Led by Th!nk e · Belgium · 2026 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Expected Impact:Proposals should result in:
Proposals should present the concrete results which will be delivered by the activities and demonstrate how these results will contribute to the topic-specific impacts. This demonstration should include a detailed analysis of the starting point and a set of well-substantiated assumptions and establish clear causality links between the results and the expected impact.
Proposals should quantify their results and impacts using the two sets of indicators provided for the topic (below), when they are relevant for the proposed activities. They should also propose indicators which are specific to the proposed activities. Proposals are not expected to address all the listed impacts and indicators. The results and impacts should be quantified for the end of the project and for 5 years after the end of the project.
The indicators for this topic include:
Proposals should also quantify their impacts related to the following common indicators for the LIFE Clean Energy Transition sub-programme:
Funding rate
Other Action Grants (OAGs) — 95%
Objective:Under the European Green Deal and the REPowerEU Plan, the EU has put in place a whole set of new pieces of climate and energy legislation, including the revised Energy Efficiency Directive, Renewable Energy Directive and Energy Performance of Buildings Directive. The revisions make the policy framework for sustainable energy more stringent and ambitious. While the legislative framework offers a good amount of flexibility to Member States to shape the policy measures according to their needs and framework conditions, accurate design, monitoring, projecting and evaluation are essential elements of implementation.
This topic aims to support the implementation of the main pieces of legislation in the field of sustainable energy, notably of the Energy Efficiency Directive (Scope A), the Renewable Energy Directive (Scope B) and the Energy Performance of Buildings Directive (Scope C).
This topic under the LIFE-2025-CET call for proposals exclusively aims at addressing the Renewable Energy Directive (Scope B). Applicants are invited to submit proposals for actions to support national public authorities and - where applicable - regional authorities in charge of the implementation of the Renewable Energy Directive (RED)[1]. Scopes A and C under this topic are not open in call LIFE-2025-CET.
Note that actions supporting the implementation of specific provisions of the Energy Efficiency Directive and the Energy Performance of Buildings Directive are partly addressed in other vertical topics.
Scope:Actions under this topic are expected to:
Actions under call 2025 are expected to support the implementation of specific provisions related to the streamlining of permit-granting process, renewables acceleration areas, information and training of installers and designers of selected renewable energy technologies.
Scope B: Support for the implementation of the Renewable Energy Directive
Lengthy administrative permit-granting procedures are one of the key barriers to investment in renewable energy projects and their related infrastructure. Directive (EU) 2018/2001 addressed this barrier by introducing rules on the organisation and maximum duration of the administrative part of the permit-granting procedure for renewable energy projects.
To support the faster deployment of renewable energy projects, Directive (EU) 2023/2413 has introduced a requirement for Member States to carry out a coordinated mapping for the deployment of renewable energy and related infrastructure in their territory. Member States should also designate as a sub-set of those areas, the renewables acceleration areas, specifically for one or more types of renewable energy plants and should indicate the type or types of energy from renewable sources that are suitable to be produced in such areas. A distinction is therefore introduced between projects located in renewables acceleration areas, for which deadlines and permitting can be further streamlined, and projects located outside such areas.
Following the adoption of the plans designating renewables acceleration areas, Member States should monitor any significant adverse environmental effects of the implementation of plans and programmes in order, inter alia, to identify, at an early stage, unforeseen adverse effects and to be able to undertake appropriate remedial action.
Another significant barrier slowing down the growth of renewables is the shortage of skilled professionals in some markets. In this context, the Renewable Energy Directive requires Member States to ensure that certification schemes or equivalent qualification schemes are available for installers and designers of all forms of renewable heating and cooling systems in buildings, industry and agriculture, for installers of solar photovoltaic systems, including energy storage, and for installers of recharging points enabling demand response. Those schemes need to be based on the criteria laid down in Annex IV of the Directive and each Member State is to recognise the certification awarded by other Member States in accordance with those criteria. If Member States identify a substantial gap between the available and necessary number of trained and qualified installers to achieve their renewable energy target, they will need to take measures to address that gap.
Capacity building, technical advisory services and enhanced cooperation between relevant implementing authorities can facilitate the effective implementation of the above provisions.
Proposals should clearly demonstrate the concrete interest of the competent implementation authorities, notably national authorities, to engage in, contribute to and use the results from project activities. Clear commitment can be demonstrated, for instance, through dedicated letters of support.
Actions under this topic are expected to address only one of the two areas below. The area addressed should be clearly specified in the introduction of the proposal.
Proposals addressing this area shall support competent national authorities in implementing relevant articles in the RED related to speeding up and streamlining permitting procedures and/or the development of plans designating renewables acceleration areas for one or more broad types of renewable energy sources. Within this context, and where appropriate, actions might also envisage the provision of support in defining effective strategies to mitigate potential environmental impacts and to facilitate social acceptance.
To that end, proposals are expected to strengthen the capacity, e.g. through the exchange of best practices and training/mentoring programmes and improve collaboration of implementing bodies within and across Member States. Proposals could support the development of new tools and methods or the adaptation and replication of existing effective tools and datasets that facilitate availability and access to data and improve quality of data. Proposals are also encouraged to establish an EU community of practitioners to facilitate mutual learning and support the harmonisation of legislation, where applicable.
Where appropriate, activities may also support the monitoring and evaluation of the implementation of relevant policy measures.
Proposals could also address permit-granting procedures for repowering or for new exploration, testing and production, including for pilot installations and innovative renewable energy technologies.
Addressing both permit-granting procedures and renewables acceleration areas will not necessarily lead to a higher score but could however be carried out if duly justified, for instance if the results from the action stemming from the designation of renewables acceleration areas would be used and would clearly provide added value for streamlining permit-granting procedures.
2. Support national authorities on the implementation of Article 18 of the RED
Proposals addressing this area shall support, including through technical advice and tools, competent national authorities in charge of the implementation of a framework to ensure a sufficient number of trained and qualified installers and designers of renewable heating and cooling systems in buildings, industry and agriculture, installers of solar photovoltaic systems, including energy storage, and installers of recharging points enabling demand response pursuant to article 18 of Directive 2018/2001 as amended. Actions shall carry out one or more of the following:
Proposals covering upskilling and reskilling activities such as the development/update of qualification and training schemes are not considered eligible within this topic.
Actions will be required to plan cooperation with the Skill4Energy Platform (planned to be launched by the European Commission in 2025 or 2026) and its governance bodies to disseminate information, promote best practices, and provide input to identify measures facilitating cross-border mobility and establish mutually recognised certifications.
Proposals must be submitted by at least 3 applicants (beneficiaries; not affiliated entities) from 3 different eligible countries.
The Commission considers that proposals requesting a contribution from the EU of up to EUR 2 million would allow the specific objectives to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
[1] Directive (EU) 2018/2001 as amended by Directive (EU) 2023/2413.
1. Admissibility Conditions: Proposal page limit and layout
described in section 5 of the call document.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in section 6 of the call document.
3. Other Eligible Conditions
described in section 6 of the call document.
4. Financial and operational capacity and exclusion
described in section 7 of the call document.
5a. Evaluation and award: Submission and evaluation processes
described section 8 of the call document and the Online Manual.
5b. Evaluation and award: Award criteria, scoring and thresholds
described in section 9 of the call document.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in section 4 of the call document.
6. Legal and financial set-up of the grants
described in section 10 of the call document.
Call document and annexes:
Call document
Application form templates
Standard application form (LIFE SAP and OAG) — the application form specific to this call is available in the Submission System
Detailed budget table (LIFE)
Participant information (LIFE)
Model Grant Agreements (MGA)
LIFE MGA 
Additional documents:
LIFE Multiannual Work Programme 2025-2027
LIFE Regulation 2021/783
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.