On this page · 5 sections→
Where the EU money came from
Funding by EU programme. Amounts are Alstom Transport SA's own share of each project, not the project's full budget.
- Horizon 2020€26.9M · 27 projects
- Horizon Europe€15.7M · 10 projects
- FP7 (2007 to 2013)€5.8M · 26 projects
Projects
63 EU-funded projects, newest first. Alstom Transport SA led 5 of them as coordinator. Each links to the official record.
- VALORAILAssociated partner
VAlue of LOw carbon and RAil assessment
Horizon Europe · 2026–2029 · Project on CORDIS ↗
- FP2-MORANE-2Partner
Flagship project 2 - MObile radio for RAilway Networks in Europe 2
Horizon Europe · 2024–2027 · Project on CORDIS ↗
€579ktheir share - EU-DOCs for smUCSAssociated partner
European Doctoral Programme for Smart Urban Coastal Sustainability
Horizon Europe · 2024–2029 · Project on CORDIS ↗
- EBRT2030Partner
European Bus Rapid Transit of 2030: electrified, automated, connected
Horizon Europe · 2023–2026 · Project on CORDIS ↗
€926ktheir share - FP4 - Rail4EARTHCoordinator
Europe’s Rail Flagship Project 4 - Sustainable and green rail systems
Horizon Europe · 2022–2026 · Project on CORDIS ↗
€6.9Mtheir share - FP6 - FutuRePartner
Europe’s Rail Flagship Project 6 - Delivering Innovative rail services to revitalise capillary lines and Regional rail services
Horizon Europe · 2022–2026 · Project on CORDIS ↗
€1.6Mtheir share - FP3 - IAM4RAILPartner
Europe’s Rail Flagship Project 3 - Holistic and Integrated Asset Management for Europe’s RAIL System
Horizon Europe · 2022–2026 · Project on CORDIS ↗
€2.1Mtheir share - FP1 - MOTIONALPartner
Europe’s Rail Flagship Project 1 - MObility managemenT multImodal envirOnment aNd digitAl enabLers
Horizon Europe · 2022–2026 · Project on CORDIS ↗
€690ktheir share - FP2 - R2DATOPartner
Europe’s Rail Flagship Project 2 - Rail to Digital automated up to autonomous train operation
Horizon Europe · 2022–2026 · Project on CORDIS ↗
€1.8Mtheir share - FP5 – TRANS4M-RPartner
Europe’s Rail Flagship Project 5 - Transforming Europe’s Rail Freight
Horizon Europe · 2022–2026 · Project on CORDIS ↗
€1.2Mtheir share - €49ktheir share
- X2Rail-5Partner
Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security
Horizon 2020 · 2020–2023 · Project on CORDIS ↗
€474ktheir share - LINX4RAIL2Partner
SYSTEM ARCHITECTURE AND CONCEPTUAL DATA MODEL FOR RAILWAY, COMMON DATA DICTIONARY AND GLOBAL SYSTEM MODELLING SPECIFICATIONS
Horizon 2020 · 2020–2023 · Project on CORDIS ↗
€44ktheir share - CONNECTA-3Partner
CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3
Horizon 2020 · 2020–2023 · Project on CORDIS ↗
€136ktheir share - PINTA3Coordinator
IP1 Traction TD1– Phase 3 and HVAC TD8
Horizon 2020 · 2020–2023 · Project on CORDIS ↗
€2.3Mtheir share - TAUROPartner
Technologies for Autonomous Rail Operation
Horizon 2020 · 2020–2023 · Project on CORDIS ↗
€133ktheir share - 5GRAILPartner
5G for future RAILway mobile communication system
Horizon 2020 · 2020–2023 · Project on CORDIS ↗
€1.2Mtheir share - FINE-2Partner
Furthering Improvements in Integrated Mobility Management (I2M), Noise and Vibration, and Energy in Shift2Rail
Horizon 2020 · 2019–2023 · Project on CORDIS ↗
€194ktheir share - X2Rail-4Coordinator
Advanced signalling and automation system - Completion of activities for enhanced automation systems, train integrity, traffic management evolution and smart object controllers
Horizon 2020 · 2019–2023 · Project on CORDIS ↗
€1.4Mtheir share - LINX4RAILPartner
System architecture and Conceptual Data Model for railway, common data dictionary and global system modelling specifications
Horizon 2020 · 2019–2022 · Project on CORDIS ↗
€137ktheir share - PIVOT2Partner
Performance Improvement for Vehicles on Track 2
Horizon 2020 · 2019–2023 · Project on CORDIS ↗
€90ktheir share - X2Rail-3Partner
Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication
Horizon 2020 · 2018–2021 · Project on CORDIS ↗
€997ktheir share - CONNECTA-2Partner
CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS. PhAse 2.
Horizon 2020 · 2018–2021 · Project on CORDIS ↗
€267ktheir share - PINTA2Coordinator
IP1 Traction TD1 and Brakes TD5 – Phase 2
Horizon 2020 · 2018–2021 · Project on CORDIS ↗
€6.2Mtheir share - ASSUREDPartner
fASt and Smart charging solutions for full size URban hEavy Duty applications
Horizon 2020 · 2017–2022 · Project on CORDIS ↗
€103ktheir share - PIVOTPartner
Performance Improvement for Vehicles on Track
Horizon 2020 · 2017–2019 · Project on CORDIS ↗
€76ktheir share - X2RAIL-2Partner
Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functions
Horizon 2020 · 2017–2021 · Project on CORDIS ↗
€435ktheir share - IN2STEMPOPartner
Innovative Solutions in Future Stations, Energy Metering and Power Supply
Horizon 2020 · 2017–2023 · Project on CORDIS ↗
€302ktheir share - MAESTROPartner
Modular laser based additive manufacturing platform for large scale industrial applications
Horizon 2020 · 2016–2019 · Project on CORDIS ↗
€248ktheir share - CONNECTAPartner
CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1.
Horizon 2020 · 2016–2018 · Project on CORDIS ↗
€436ktheir share - X2Rail-1Partner
Start-up activities for Advanced Signalling and Automation Systems
Horizon 2020 · 2016–2021 · Project on CORDIS ↗
€1.9Mtheir share - PINTACoordinator
IP1 Traction TD1 and Brakes TD5 – Phase 1
Horizon 2020 · 2016–2018 · Project on CORDIS ↗
€5.9Mtheir share - €237ktheir share
- AMASSPartner
Architecture-driven, Multi-concern and Seamless Assurance and Certification of Cyber-Physical Systems
Horizon 2020 · 2016–2019 · Project on CORDIS ↗
€206ktheir share - OPTIMISEDPartner
Operational Planning Tool Interfacing Manufacturing Integrated Simulations with Empirical Data
Horizon 2020 · 2015–2018 · Project on CORDIS ↗
€433ktheir share - €405ktheir share
- ROLL2RAILPartner
NEW DEPENDABLE ROLLING STOCK FOR A MORE SUSTAINABLE, INTELLIGENT AND COMFORTABLE RAIL TRANSPORT IN EUROPE
Horizon 2020 · 2015–2017 · Project on CORDIS ↗
€2.5Mtheir share - REFRESCOPartner
Towards a REgulatory FRamework for the usE of Structural new materials in railway passenger and freight CarbOdyshells.
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€216ktheir share - CRYSTALPartner
Critical System Engineering Acceleration
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€88ktheir share - FOSTER RAILPartner
Future Of Surface Transport Research Rail
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€28ktheir share
Show 23 more projects
- MERLINPartner
Sustainable and intelligent management of energy for smarter railway systems in Europe: an integrated optimisation approach
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€252ktheir share - €48ktheir share
- OSIRISPartner
Optimal Strategy to Innovate and Reduce energy consumption In urban rail Systems
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€580ktheir share - MAPICC 3DPartner
One-shot Manufacturing on large scale of 3D up graded panels and stiffeners for lightweight thermoplastic textile composite structures
FP7 (2007 to 2013) · 2011–2015 · Project on CORDIS ↗
€187ktheir share - MBATPartner
Combined Model-based Analysis and Testing of Embedded Systems
FP7 (2007 to 2013) · 2011–2014 · Project on CORDIS ↗
€128ktheir share - ACOUTRAINPartner
Virtual certification of acoustic performance for freight and passenger trains
FP7 (2007 to 2013) · 2011–2014 · Project on CORDIS ↗
€161ktheir share - EUREMCOPartner
European Railway Electromagnetic Compatibility
FP7 (2007 to 2013) · 2011–2014 · Project on CORDIS ↗
€178ktheir share - ADVANCEPartner
Advanced Design and Verification Environment for Cyber-physical System Engineering
FP7 (2007 to 2013) · 2011–2014 · Project on CORDIS ↗
€272ktheir share - OPENCOSSPartner
Open Platform for EvolutioNary Certification Of Safety-critical Systems
FP7 (2007 to 2013) · 2011–2015 · Project on CORDIS ↗
€340ktheir share - SECUR-EDPartner
Secured Urban Transportation - European Demonstration
FP7 (2007 to 2013) · 2011–2014 · Project on CORDIS ↗
€1.2Mtheir share - MARATHONPartner
Make Rail The Hope for protecting Nature
FP7 (2007 to 2013) · 2011–2014 · Project on CORDIS ↗
€179ktheir share - RIVASPartner
Railway Induced Vibration Abatement Solutions
FP7 (2007 to 2013) · 2011–2013 · Project on CORDIS ↗
€141ktheir share - EURAXLESPartner
EURAXLES: Minimizing the risk of fatigue failure of railway axles
FP7 (2007 to 2013) · 2010–2014 · Project on CORDIS ↗
- IMS&CPSPartner
Innovative Material Synergies & Composite Processing Strategies
FP7 (2007 to 2013) · 2010–2013 · Project on CORDIS ↗
€77ktheir share - PROTECTRAILPartner
The Railway-Industry Partnership for Integrated Security of Rail Transport
FP7 (2007 to 2013) · 2010–2014 · Project on CORDIS ↗
€813ktheir share - SKILLRAILPartner
Education and Training Actions for high skilled job opportunities in the railway sector
FP7 (2007 to 2013) · 2009–2011 · Project on CORDIS ↗
€28ktheir share - AEROTRAINPartner
AEROdynamicsTotal Regulatory Acceptance for the Interoperable Network
FP7 (2007 to 2013) · 2009–2012 · Project on CORDIS ↗
€158ktheir share - PANTOTRAINPartner
PANTOgraph and catenary interaction Total Regulatory Acceptance for the Interoperable Network
FP7 (2007 to 2013) · 2009–2012 · Project on CORDIS ↗
€176ktheir share - DYNOTRAINPartner
Railway Vehicle Dynamics and Track InteractionsTotal Regulatory Acceptance for the Interoperable Network
FP7 (2007 to 2013) · 2009–2013 · Project on CORDIS ↗
€172ktheir share - PMNIDEAPartner
Predictive Maintenance employing Non-intrusive Inspection & Data Analysis
FP7 (2007 to 2013) · 2009–2012 · Project on CORDIS ↗
€83ktheir share - €180ktheir share
- TRANSFEUPartner
Transport Fire Safety Engineering in the European Union
FP7 (2007 to 2013) · 2009–2012 · Project on CORDIS ↗
€101ktheir share - MODSAFEPartner
Modular Urban Transport Safety and Security Analysis
FP7 (2007 to 2013) · 2008–2012 · Project on CORDIS ↗
€69ktheir share
Works most with
Organisations that shared the most EU projects with this one. A good starting list for consortium partners.
- Deutsche Bahn AGGermany · 39 shared projects
- Societe Nationale SncfFrance · 36 shared projects
- Construcciones y Auxiliar de Ferrocarriles, S.A.Spain · 27 shared projects
- Trafikverket - TrvSweden · 26 shared projects
- Construcciones y Auxiliar de Ferrocarriles Investigacion y Desarrollo SLSpain · 26 shared projects
- Hitachi Rail Sts SpAItaly · 25 shared projects
- Union des Industries Ferroviaires Europeennes - UnifeBelgium · 24 shared projects
- Siemens Mobility GmbHGermany · 23 shared projects
- Union Internationale des Chemins de FerFrance · 23 shared projects
- Alstom Transportation Germany GmbHGermany · 22 shared projects
- Kungliga Tekniska HoegskolanSweden · 20 shared projects
- Deutsches Zentrum Fur Luft - und Raumfahrt eVGermany · 19 shared projects
- Siemens AktiengesellschaftGermany · 19 shared projects
- Network Rail Infrastructure LimitedUnited Kingdom · 19 shared projects
- Alstom Rail Sweden ABSweden · 18 shared projects
- Db Infrago AGGermany · 17 shared projects
Fields it works in
Research fields recorded on its Horizon projects.
- additive manufacturing
- aeronautical engineering
- air pollution engineering
- amorphous semiconductors
- artificial intelligence
- automation
- automotive engineering
- big data
- business models
- climatic change mitigation
- climatic changes
- coating and films
- composites
- computer security
Is this your organisation?
Claim it with an EUACC listing (€39 once, reviewed by our editors): add what you build, your team and what you are looking for. We pre-fill it from your EU records. Listed companies reach investors through our newsletter and get matched to new EU calls first.
Claim this profile →Source: CORDIS (Horizon Europe, Horizon 2020, FP7) and the EU Funding & Tenders Portal (other EU programmes), matched by the EU registration number (PIC). Past participation does not mean the organisation is open to new partnerships. Official website ↗
