On this page · 5 sections→
Where the EU money came from
Funding by EU programme. Amounts are MAX IV Laboratory, Lund University's own share of each project, not the project's full budget.
- FP7 (2007 to 2013)€111M · 256 projects
- Horizon 2020€0 · 1 project
Projects
257 EU-funded projects, newest first. MAX IV Laboratory, Lund University led 74 of them as coordinator. Each links to the official record.
- PIPPIPartner
Protein-excipient Interactions and Protein-Protein Interactions in formulation
Horizon 2020 · 2016–2019 · Project on CORDIS ↗
- APPROACHPartner
Applied Public-Private Research enabling OsteoArthritis Clinical Headway
FP7 (2007 to 2013) · 2015–2020 · Project on CORDIS ↗
€163ktheir share - HYBRID-GENESCoordinator
The Repeatability of Genetic Architecture
FP7 (2007 to 2013) · 2015–2017 · Project on CORDIS ↗
€198ktheir share - AVIANMALARIAGENETICSCoordinator
Patterns and drivers in malaria-like infections: meta and infra-population dynamics of specialised parasites
FP7 (2007 to 2013) · 2015–2016 · Project on CORDIS ↗
€198ktheir share - TENDON_MECHBIOCoordinator
Biomechanics and mechanobiology of the Achilles tendon
FP7 (2007 to 2013) · 2014–2016 · Project on CORDIS ↗
€206ktheir share - LEUKEMIABARRIERCoordinator
The Leukemia-Initiating Cell: Genetic Determinants, Escape Mechanisms and Ontogenic Influence
FP7 (2007 to 2013) · 2014–2019 · Project on CORDIS ↗
€2.0Mtheir share - CLIASCoordinator
Measurement and Control of Light Fields for Application in Science and Technology
FP7 (2007 to 2013) · 2014–2015 · Project on CORDIS ↗
€72ktheir share - CASCEFFPartner
Modelling of dependencies and cascading effects for emergency management in crisis situations
FP7 (2007 to 2013) · 2014–2017 · Project on CORDIS ↗
€434ktheir share - MOVE2ADAPTCoordinator
Linking landscape genetic structure with local adaptation to changing environments
FP7 (2007 to 2013) · 2014–2016 · Project on CORDIS ↗
€198ktheir share - MEXTIMPartner
Measurement of temperature exposure and integration over time
FP7 (2007 to 2013) · 2014–2019 · Project on CORDIS ↗
€42ktheir share - STEMTARGETCoordinator
Targeting Leukemia Stem Cells
FP7 (2007 to 2013) · 2014–2018 · Project on CORDIS ↗
€100ktheir share - COMPASSCoordinator
Colloids with complex interactions: from model atoms to colloidal recognition and bio-inspired self assembly
FP7 (2007 to 2013) · 2014–2019 · Project on CORDIS ↗
€2.5Mtheir share - MAMBACoordinator
Molecular mechanism of amyloid β aggregation
FP7 (2007 to 2013) · 2014–2019 · Project on CORDIS ↗
€2.5Mtheir share - GREENANOFILMSPartner
Development and application of ultra-high resolution nano-organized films by self-assembly of plant-based materials for next generation opto- and bio-electronics
FP7 (2007 to 2013) · 2014–2017 · Project on CORDIS ↗
€169ktheir share - S-HELPPartner
Securing Health.Emergency.Learning.Planning
FP7 (2007 to 2013) · 2014–2017 · Project on CORDIS ↗
€438ktheir share - ABBIPartner
Audio Bracelet for Blind Interaction: a new technology based on sensory-motor rehabilitation for visually impaired children
FP7 (2007 to 2013) · 2014–2017 · Project on CORDIS ↗
€407ktheir share - €434ktheir share
- ABACUSCoordinator
Parallel computing based on designed networks explored by self-propelled, biological agents
FP7 (2007 to 2013) · 2014–2016 · Project on CORDIS ↗
€584ktheir share - MAMMOETPartner
MAssive MiMO for Efficient Transmission
FP7 (2007 to 2013) · 2014–2016 · Project on CORDIS ↗
€514ktheir share - BASTIONPartner
Board and SoC Test Instrumentation for Ageing and No Failure Found
FP7 (2007 to 2013) · 2014–2017 · Project on CORDIS ↗
€582ktheir share - €640ktheir share
- INTELLIREMEDPartner
Low-cost remote monitoring and control system for in-situ remediation of soil
FP7 (2007 to 2013) · 2013–2015 · Project on CORDIS ↗
€26ktheir share - FLEXIFABPartner
Flexible fabrication of lightweight aluminium transport structures
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€35ktheir share - €260ktheir share
- SAFETYPACKPartner
Innovative non- intrusive laser gas sensors on food production for real time quality/safety in line control of food packaging and bottling systems
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€149ktheir share - SSL-eratePartner
Accelerate SSL Innovation for Europe
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€593ktheir share - NEUROSTEMCELLREPAIRPartner
European stem cell consortium for neural cell replacement, reprogramming and functional brain repair
FP7 (2007 to 2013) · 2013–2017 · Project on CORDIS ↗
€565ktheir share - MultISynPartner
Multimodal Imaging of rare Synucleinopathies
FP7 (2007 to 2013) · 2013–2018 · Project on CORDIS ↗
€848ktheir share - ECCO-MATEPartner
Experimental and Computational Tools for Combustion Optimization in Marine and Automotive Engines
FP7 (2007 to 2013) · 2013–2017 · Project on CORDIS ↗
€271ktheir share - BIOENERGYPartner
Biofuel Cells : From fundamentals to applications of bioelectrochemistry
FP7 (2007 to 2013) · 2013–2017 · Project on CORDIS ↗
€260ktheir share - ENIGMAPartner
Enlightenment and Innovation, Ensured through Pre Commercial Procurement in Cities
FP7 (2007 to 2013) · 2013–2015 · Project on CORDIS ↗
€115ktheir share - Athero-B-CellPartner
Targeting and exploiting B cell functions for treatment in cardiovascular disease
FP7 (2007 to 2013) · 2013–2018 · Project on CORDIS ↗
€441ktheir share - EPIONEPartner
Natural sensory feedback for phantom limb pain modulation and therapy
FP7 (2007 to 2013) · 2013–2017 · Project on CORDIS ↗
€557ktheir share - CAPITALPartner
CIVITAS CAPITAL – making the best of CIVITAS!
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
- ACEPartner
Accelerating Cross- border Engagement (ACE): Accelerating the early Engagement of highly innovative ICT start-ups, SMEs and entrepreneurs in Cross-Border cooperation and venturing
FP7 (2007 to 2013) · 2013–2015 · Project on CORDIS ↗
€106ktheir share - EurHolMemCoordinator
The Europeanisation of the Holocaust memory in Eastern Europe
FP7 (2007 to 2013) · 2013–2014 · Project on CORDIS ↗
€138ktheir share - €196ktheir share
- SMARTSPECPartner
Smart Specialisation For Regional Innovation
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€262ktheir share - NEUROSCAFFOLDSPartner
Rapid prototyping scaffolds for the nervous system
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€405ktheir share - BIOFINDERCoordinator
New biomarkers for Alzheimer’s & Parkinson’s diseases - key tools for early diagnosis and drug development
FP7 (2007 to 2013) · 2013–2018 · Project on CORDIS ↗
€1.5Mtheir share
Show 40 more projects
- BrainVisualEcologyCoordinator
Linking neuronal activity to ecology: How the sensory environment of a species shapes the neural representation of the external world in the insect brain
FP7 (2007 to 2013) · 2013–2015 · Project on CORDIS ↗
€206ktheir share - SEFIRAPartner
Socio-economic implications for individual responses to Air Pollution Policies in EU +27
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€90ktheir share - SUPPORTING LIFEPartner
Supporting Low-cost Intervention For disEase control
FP7 (2007 to 2013) · 2013–2017 · Project on CORDIS ↗
€297ktheir share - TUMORGANCoordinator
Exploring the tumor as a communicating organ
FP7 (2007 to 2013) · 2013–2018 · Project on CORDIS ↗
€1.5Mtheir share - IN-BRAINCoordinator
IN VIVO REPROGRAMMING: A NOVEL ROUTE TO BRAIN REPAIR
FP7 (2007 to 2013) · 2013–2018 · Project on CORDIS ↗
€1.5Mtheir share - MESH-WISEPartner
Self-organising MESH Networking with Heterogeneous Wireless Access
FP7 (2007 to 2013) · 2013–2017 · Project on CORDIS ↗
€307ktheir share - LIBERATIONPartner
LInking farmland Biodiversity to Ecosystem seRvices for effective ecofunctional intensificATION
FP7 (2007 to 2013) · 2013–2017 · Project on CORDIS ↗
€335ktheir share - INFERNOSPartner
Information, Fluctuations, and Energy Control in Small Systems
FP7 (2007 to 2013) · 2013–2015 · Project on CORDIS ↗
€342ktheir share - ICOS-INWIREPartner
ICOS improved sensors, network and interoperability for GMES
FP7 (2007 to 2013) · 2013–2015 · Project on CORDIS ↗
€81ktheir share - MCNETITNPartner
Training Network for Monte Carlo Event Generators for LHC Physics
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€776ktheir share - NANOEMBRACEPartner
Embracing One Dimensional Semiconductor Nanostructures
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€271ktheir share - COMBOPartner
COnvergence of fixed and Mobile BrOadband access/aggregation networks
FP7 (2007 to 2013) · 2013–2016 · Project on CORDIS ↗
€384ktheir share - DYN@MOPartner
DYNamic citizens @ctive for sustainable MObility
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
- INNOVAGEPartner
Social Innovations Promoting Active and Healthy Ageing
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€580ktheir share - BRAINVECTORSPartner
From Brain Gene Transfer Towards Gene Therapy: Pharmacological Assessment of AAV, CAV and LVV""
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€211ktheir share - Sexual AssistanceCoordinator
Commercial Sex, ‘Sexual Assistance’ and People with Disabilities: A Qualitative Inquiry on Sweden, Britain, and Switzerland
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€181ktheir share - DD-PDCoordinator
A novel mechanism to regulate gene expression in the brain
FP7 (2007 to 2013) · 2012–2013 · Project on CORDIS ↗
€43ktheir share - METAfluxCoordinator
Mire Ecosystem Transition Area Flux
FP7 (2007 to 2013) · 2012–2014 · Project on CORDIS ↗
€241ktheir share - EUBITOXCoordinator
European Urbanization and its consequnces for Bird Health and Performance
FP7 (2007 to 2013) · 2012–2017 · Project on CORDIS ↗
€100ktheir share - NUMBERSCoordinator
Number Cognition and Philosophy of Arithmetic
FP7 (2007 to 2013) · 2012–2014 · Project on CORDIS ↗
€181ktheir share - DRUGSFORDPartner
Preclinical development of drugs and drug delivery technology for the treatment of inherited photoreceptor degeneration
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€767ktheir share - EURO DISHPartner
Study on the need for food and health research infrastructures in Europe
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€24ktheir share - MIRIFISENSPartner
Mid InfraRed Innovative lasers For Improved SENSor of hazardous substances
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€181ktheir share - PerformWOODPartner
Performance standards for wood in construction - delivering customer service life needs
FP7 (2007 to 2013) · 2012–2014 · Project on CORDIS ↗
€56ktheir share - GRANULAR MECHANICSCoordinator
Combined 4D experimental grain-scale characterisation of grain-strains, force transfer and kinematics in natural granular material (sand) under load
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€100ktheir share - BRIGITPartner
New tailor-made biopolymers produced from lignocellulosic sugars waste for highly demanding fire-resistant applications
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€636ktheir share - BIOINTENSEPartner
Mastering bioprocess Integration and intensification across scales
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€656ktheir share - SPREEPartner
SERVICIZING POLICY FOR RESOURCE EFFICIENT ECONOMY
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€221ktheir share - NWS4LIGHTCoordinator
Nanowires for solid state lighting
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€1.2Mtheir share - REFORM CAPACITYCoordinator
The Reform Capacity of Governments
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€1.2Mtheir share - ENTITLEPartner
ENTITLE. European Network of Political Ecology
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€238ktheir share - DON-HypoCoordinator
The role of dissolved organic nitrogen (DON) on the development and extend of eutrophication-driven hypoxia and responses to global warming
FP7 (2007 to 2013) · 2012–2014 · Project on CORDIS ↗
€181ktheir share - TENLAWPartner
Tenancy Law and Housing Policy in Multi-level Europe
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€290ktheir share - ASTROGEOBIOSPHERECoordinator
An astronomical perspective on Earth's geological record and evolution of life
FP7 (2007 to 2013) · 2012–2017 · Project on CORDIS ↗
€1.9Mtheir share - risk factors cancerCoordinator
Genetic and environmental risk factors for common malignant tumours especially breast cancer and melanoma
FP7 (2007 to 2013) · 2012–2017 · Project on CORDIS ↗
€1.2Mtheir share - GOOSEPHYSIOLCoordinator
Resilience to global change in long-lived species: physiological comparisons between Arctic and temperate-breeding barnacle geese
FP7 (2007 to 2013) · 2012–2014 · Project on CORDIS ↗
€174ktheir share - ERYTHROTHERAPYCoordinator
DEFINING NEW DRUGS AND DRUG TARGETS FOR TREATMENT OF ANEMIA
FP7 (2007 to 2013) · 2012–2016 · Project on CORDIS ↗
€100ktheir share - ViCyPhySysCoordinator
Virtual Cyber-Physical Systems
FP7 (2007 to 2013) · 2012–2014 · Project on CORDIS ↗
€241ktheir share - COPEPartner
Combating Poverty in Europe: Re-organising Active Inclusion through Participatory and Integrated Modes of Multilevel Governance
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€364ktheir share - PEPMIPPartner
Robust affinity materials for applications in proteomics and diagnostics
FP7 (2007 to 2013) · 2012–2015 · Project on CORDIS ↗
€253ktheir share
Showing the 80 most recent of 257 projects.
Works most with
Organisations that shared the most EU projects with this one. A good starting list for consortium partners.
- Centre National de la Recherche Scientifique CNRSFrance · 32 shared projects
- Commissariat A L Energie Atomique et aux Energies AlternativesFrance · 22 shared projects
- Max-Planck-Gesellschaft zur Forderung der Wissenschaften eVGermany · 19 shared projects
- The Chancellor Masters and Scholars of the University of CambridgeUnited Kingdom · 18 shared projects
- Consiglio Nazionale Delle RicercheItaly · 17 shared projects
- Katholieke Universiteit LeuvenBelgium · 16 shared projects
- Eidgenoessische Technische Hochschule ZuerichSwitzerland · 16 shared projects
- Danmarks Tekniske UniversitetDenmark · 16 shared projects
- Ecole Polytechnique Federale de LausanneSwitzerland · 16 shared projects
- The Chancellor, Masters and Scholars of the University of OxfordUnited Kingdom · 15 shared projects
- Institut National de la Sante et de la Recherche MedicaleFrance · 15 shared projects
- Imperial College of Science Technology and MedicineUnited Kingdom · 15 shared projects
- University College LondonUnited Kingdom · 15 shared projects
- Uppsala UniversitetSweden · 14 shared projects
- Agencia Estatal Consejo Superior de Investigaciones CientificasSpain · 13 shared projects
- The University of ManchesterUnited Kingdom · 13 shared projects
Fields it works in
Research fields recorded on its Horizon projects.
- 4G
- 5G
- DNA
- HIV
- RNA
- absorption spectroscopy
- aeronautical engineering
- agriculture
- air pollution engineering
- aircraft
- alcohols
- aliphatic compounds
- alkali metals
- alkaline earth metals
Is this your organisation?
Claim it with an EUACC listing (€39 once, reviewed by our editors): add what you build, your team and what you are looking for. We pre-fill it from your EU records. Listed companies reach investors through our newsletter and get matched to new EU calls first.
Claim this profile →Source: CORDIS (Horizon Europe, Horizon 2020, FP7) and the EU Funding & Tenders Portal (other EU programmes), matched by the EU registration number (PIC). Past participation does not mean the organisation is open to new partnerships. Official website ↗
