Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Based on projects the EU funded on the same subject in this programme.
21-DE-E-ENEREGIO SOBOSEnergy Region Südostbayern Oberösterreich Salzburg
CEF-E-2021-CBRENEW-PREPSTUDIES · 2022 · Official record ↗
21-EE-E-GORIOConceptual Engineering Study for Gulf of Riga Offshore Wind Farm
CEF-E-2021-CBRENEW-PREPSTUDIES · 2022 · Official record ↗
2022-07-EU-S-M-22-CICERONEGreenNH3studCeo allIance Cross-border European green hydROgeN valuE chain - Green Ammonia infrastructure study
CEF-E-2022-CBRENEW-STUDIES · 2023 · Official record ↗
2022-07-EU-S-M-23-CICERONE-AmmoniaCICERONE-Ammonia
CEF-E-2023-CBRENEW-STUDIES · 2024 · Official record ↗
22-HR-E-ADRIA WINDPreparatory Study for Establishing an Offshore Wind Farm in the Northern Adriatic Sea
CEF-E-2022-CBRENEW-PREPSTUDIES · 2023 · Official record ↗
22-EU-DIG-BEGONIAEnabling the Internet of Energy and Optimized Transport through Cross-Border Digital Platforms
CEF-DIG-2022-TA-PLATFORMS · 2024 · Official record ↗
2022-10-EU-S-M-23-UNITED HEATUnified Network for Innovative Transition in Energy Decarbonisation of HEATing
CEF-E-2023-CBRENEW-STUDIES · 2024 · Official record ↗
2023-3-EU-S-M-23-SLOWPSaare-Liivi Offshore Wind Park
CEF-E-2023-CBRENEW-STUDIES · 2024 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
This topic aims at financing CB-RES projects contributing to the cost-effective achievement of the goals and objectives of the Clean Industrial Deal, as well as the Paris Agreement and the Union’s 2030 climate and energy targets and the objective for climate neutrality, in accordance with recitals 5 and 30 of the CEF Regulation and in line with the Multi-annual Work Programme. Cross-border RES projects are an integral element of the enabling framework for regional and cross-border cooperation on renewables and facilitate cross border cooperation in the field of energy (as referred to in Article 3 of the CEF Regulation).
Based on the provisions of Article 7 and Annex Part IV of CEF Regulation, CB RES projects shall promote cross-border cooperation between Member States, or between Member States and third countries, in the field of planning, development and the cost-effective exploitation of renewable energy sources, as well as facilitate their integration through energy storage facilities and with the aim of contributing to the Union’s long term decarbonisation strategy, completing the internal energy market and enhancing the security of supply.
This topic refers to projects for studies contributing to the implementation of a CB RES project. Studies (article 2 of CEF Regulation) in the meaning of CEF Energy include activities needed to prepare cross-border RES project implementation, such as preparatory, mapping, feasibility, evaluation, testing and validation studies, including in the form of software, and any other technical support measure, including prior action to define and develop a cross-border RES project and decide on its financing, such as exploration of the sites concerned and preparation of the financial package. A study could cover in-depth investigation and exploration of the risk factors of a project e.g. safety, technical, environmental, regulatory, economic or legal issues to determine whether and how the project should be implemented.
While CEF Energy does not finance technological development, in justified cases, studies can include also pilot projects, such as pilot plants, that are eventually needed to test technologies that are at TRL 7-8, innovative processes or techniques. Such pilot projects should be strictly related to eligible components of the CB RES project.
For more mature projects, a study may have the objective to move the project through the development stage to a Final Investment Decision (FID) and may include Front End Engineering and Design (FEED) studies, technical design studies, geophysical surveys, seabed surveys, tasks related to territorial planning, environmental assessments and comparable studies as applicable. Activities may also include stakeholder engagement and preparation of the procurement procedure for the construction phase.
A study could also be used to set out in detail the operational aspects of a cooperation between Member States, or between Member States and third countries, such as the precise legal set up of the financing arrangement e.g. the cross-border tender or the regulatory set up of the cooperation project, or the arrangement on the allocation of costs and benefits between the participating counties.
For each of the CB RES projects, the list of components that are included in the CB RES status can be found in the technical documentation supporting the Delegated Regulation that establishes the CB RES list.
Proposals for studies can cover any of the elements of the CB RES status project contained in the technical documentation.
While the focus of the study should be related to the renewable energy generation component of the project, in the case of projects with additional (non-RES generation) elements such as grid infrastructure, storage facilities, conversion of the renewable electricity, studies may also cover the interplay between those elements and the renewable energy component, if the applicants justify the necessity for the study to capture the project set-up as a whole.
1. Admissibility Conditions: Proposal page limit and layout
described in section 5 of the call document.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in section 6 of the call document.
3. Other Eligible Conditions
described in section 6 of the call document.
4. Financial and operational capacity and exclusion
described in section 7 of the call document.
5a. Evaluation and award: Submission and evaluation processes
described section 8 of the call document and the Online Manual.
5b. Evaluation and award: Award criteria, scoring and thresholds
described in section 9 of the call document.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in section 4 of the call document.
6. Legal and financial set-up of the grants
described in section 10 of the call document.
Call document and annexes:
Call document
Application form templates
Standard application form (CEF-E CBRENEW) — the application form specific to this call is available in the Submission System
Detailed budget table per WP (CEF)
Letter of support/MS agreement (CEF)
Timetable (Gannt Chart) (CEF)
Environmental compliance file 
Model Grant Agreements (MGA)
CEF MGA 
Additional documents:
Work Programme 2021-2027 (CEF-E)
Work Programme 2021-2027 (CEF-E) - Annex
CEF Regulation 2021/1153
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement 
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 46 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
Yes, the necessary preparatory work is in principle eligible for funding. In order to be eligible, the costs should be incurred after the project/action starts. The project starting date is defined at the grant agreement preparation and cannot be earlier than the day of the submission of the application.
Read it on the EU portal ↗Answered 7 Nov 2025
Yes, a project application can include several beneficiaries involved in the project. In such case, a project coordinator must be appointed. The project coordinator is the intermediary for all communications with CINEA. The obligations of the coordinator and beneficiaries are laid out in the grant agreement.
Read it on the EU portal ↗Answered 7 Nov 2025
Yes, project developers need to demonstrate a high level of maturity of the project by the time they apply for works.
Read it on the EU portal ↗Answered 7 Nov 2025
Legal entities, as specified in article 11 of the CEF Regulation, are eligible to apply for CEF grants. While a CB RES project promoter is a legal entity that develops the CB RES project (Art. 2 of the Delegated Regulation), it is not necessary that the promoter(s) of the CB RES project, as communicated at the CB RES Status application stage, apply for the CEF grant. In any case, the involvement and agreement of the CB RES promoter in the proposed action and the capacity of the applicant to implement the action should be fully demonstrated in both cases. The choice of the consortium set-up is ultimately up to the applicants, but should be duly justified in the grant proposal.
Read it on the EU portal ↗Answered 7 Nov 2025
Applicants should provide the wider picture of the global CB-RES project, but then focus the application on the action that is submitted for funding. Applicants should always make it very clear what the perimeter of the action submitted in the framework of a given call for proposal is and explain how the action contributes to the implementation of the global CB-RES project.
Read it on the EU portal ↗Answered 5 Nov 2025
There is no minimum or maximum number of applicants required.
Read it on the EU portal ↗Answered 5 Nov 2025
Yes. The applicants as defined in the application for the CB RES status do not need to be the same as the applicants in the future CEF calls for studies/works. In any case, the involvement and agreement of the CB RES promoter in the proposed action and the capacity of the applicant to implement the project should be fully demonstrated in both cases.
Read it on the EU portal ↗Answered 7 Nov 2025
The agreement of an EU Member needs to be provided by completing the relevant annex and having it signed by a competent Member State Ministry concerned by the proposal.
Read it on the EU portal ↗Answered 7 Nov 2025
Yes, as mentioned in point 6 of Article 11 of the CEF Regulation, the agreement of the EU Member State(s) concerned by the cross-border projects in the field of renewable energy is necessary for applications filed by third countries or entities from third countries.
If possible, it is recommended that third country applicants submit proposals jointly with applicants established in the EU.
Read it on the EU portal ↗Answered 7 Nov 2025
To be considered eligible costs, grid connection fees must be strictly connected to the renewable installations included the in the CB RES project and they must meet the general eligibility conditions set out in Article 6.1 of the MGA (Model Grant Agreement) and the specific eligibility conditions set out in Article 6.2 of the MGA.
These costs could be claimed under one of the two different budget categories:
Read it on the EU portal ↗Answered 7 Nov 2025
Yes, in these cases, actions submitted under works can decide to include the detailed engineering design part of a ‘turnkey’ contract.
Read it on the EU portal ↗Answered 7 Nov 2025
No, the value added tax (VAT) is not an eligible cost.
Read it on the EU portal ↗Answered 5 Nov 2025
Actions of any budget are admitted. Grant applications must ensure a balanced action budget and sufficient other resources to implement the project successfully (e.g. own contributions, income generated by the action, financial contributions from third parties). The grant awarded may be lower than the amount requested; applicants may be requested to lower the estimated costs, if they are ineligible (including excessive). The list of already approved projects can be found in the public dashboard.
Read it on the EU portal ↗Answered 5 Nov 2025
The eligible action costs depend on the type of grant: works or studies. As defined in the CEF regulation studies and works consist of the following activities:
1) “studies” mean activities needed to prepare project implementation, such as preparatory, mapping, feasibility, evaluation, testing and validation studies, including in the form of software, and any other technical support measure, including prior action to define and develop a project and decide on its financing, such as reconnaissance of the sites concerned and preparation of the financial package;
2) “works” means purchase, supply and deployment of components, systems and services including software, the carrying-out of development and construction and installation activities relating to a project, the acceptance of installations and the launching of a project.
Costs of such activities incurred as part of a CB RES project are therefore in principle eligible under the CEF CB RES grant, depending on the topic to which the grant proposal applied to (works or studies).
Additional rules regarding the cost eligibility are provided in article 16 of the CEF regulation and the call text (notably under section 10 of the call text). A proper application of sound financial management principles (efficiency, effectiveness and economy) is a precondition for action costs reimbursement by CINEA.
For more information on the sound financial management principle, please review the info day slides. More on that can be found in the Financial Regulation (EU, Euratom) 2024/2509 article 33.
Read it on the EU portal ↗Answered 5 Nov 2025
According to Article 15 of the CEF Regulation for both works and studies, the amount of CEF financial support shall not exceed 50 % of the total eligible cost of the action.
A higher than 50 % funding rate is possible in case of works undertaken in the EU outermost regions - which can benefit from a specific maximum co-funding rate of 70 %.
Read it on the EU portal ↗Answered 5 Nov 2025
A cost-benefit analysis is required when applying for CEF grant for works. Small updates or more details are possible as part of the proposal, but any significant differences in results compared to the CBA included in the CB RES Status application should be duly justified as they may be a sign of a significant change to the project fundamentals.
Read it on the EU portal ↗Answered 5 Nov 2025
Studies are defined as activities needed to prepare project implementation, such as preparatory, mapping, feasibility, evaluation, testing and validation studies, including in the form of software, and any other technical support measure, including prior action to define and develop a project and decide on its financing, such as reconnaissance of the sites concerned and preparation of the financial package.
Any action which prepares the ground for building RES generation facility (e.g. a study on the technical or economic viability of the overall project, including its RES component and non-RES component) is eligible.
CB RES projects can benefit from more than one CEF grant. However, the applicants must choose which type of action (studies/works) they apply for in a given proposal. In other words the same proposal cannot combine both studies and works elements.
Read it on the EU portal ↗Answered 5 Nov 2025
There is no limit. However, for what concerns works proposals, ceteris paribus, additional points may be given in the evaluation to the proposals with proportionally high RES generation component.
Read it on the EU portal ↗Answered 5 Nov 2025
The maximum time between the call closure and the grant agreement signature is 9 months. As a rule of thumb, it is expected that grant agreements are signed well before the 9-month deadline.
Read it on the EU portal ↗Answered 7 Nov 2025
All required information and documents are specified in the call text under section 5 – Admissibility and documents.
Read it on the EU portal ↗Answered 5 Nov 2025
All data provided in the application will be processed in accordance with the relevant legal framework. It will be processed solely for the purpose of proposal evaluation, subsequent management of the grant and, if needed, programme monitoring, evaluation and communication. Details are explained in the Funding & Tenders Portal Privacy StatementPDF.
Read it on the EU portal ↗Answered 5 Nov 2025
No. All supporting documents have to be attached to the application. No documents should be sent to CINEA on the initiative of the applicant after the call submission deadline. Should CINEA receive such documentation, it will not take it into consideration. In order to ensure transparency and fair treatment of all applicants, each proposal will be assessed and evaluated on its own merits, based on the information that it contains.
Read it on the EU portal ↗Answered 5 Nov 2025
If an incomplete application is submitted by the call deadline, it will be declared non-admissible and hence not evaluated. CINEA does not accept any applications submitted after the call deadline.
Read it on the EU portal ↗Answered 5 Nov 2025
The European Commission and CINEA follow a strict policy of equal treatment of all applicants. Therefore, individual advice to the potential applicants on the preparation of their proposal is not available. Detailed instructions on how to prepare an application are available on the CINEA CB RES webpage. General questions about the call and submission process can be sent to the call helpdesk: CINEA-CEF-ENERGY-CALLS@ec.europa.eu. Please note, however, that questions which are specific to a particular proposal and where the answer would provide a comparative advantage to the applicant will not be answered.
For any general information on the CB RES programme, please get in touch with CINEA-CEF-RENEWABLES@ec.europa.eu
Read it on the EU portal ↗Answered 5 Nov 2025
The applications should be submitted directly online via the Funding & Tenders Portal Electronic Submission System. The call text includes a helpful guidance on this process.
Read it on the EU portal ↗Answered 5 Nov 2025
A business plan is required only from applications for works actions.
Read it on the EU portal ↗Answered 5 Nov 2025
The requirement regarding the cooperation agreement depends on the call topic: works or studies.
For works actions, a fully-fledged signed cooperation agreement is mandatory and must be submitted together with the proposal.
For studies projects, any step forward as compared to the CB RES Status application is encouraged and welcome.
Read it on the EU portal ↗Answered 5 Nov 2025
The action starting date is fixed in the Grant Agreement. Normally the starting date is after grant signature. Exceptionally and for duly justified reasons, an action selected for funding can start before the grant signature but never earlier than the grant application submission date. Preparatory activities for the funded actions are recommended and can start as early as needed. However their costs are not eligible as part of the funded action.
Read it on the EU portal ↗Answered 5 Nov 2025
As laid down in Article 19 of the CEF Regulation, an action that has received a contribution under the CEF2 Programme may also receive a contribution from any other Union programme, provided that the contributions do not cover the same costs. The rules of each contributing Union programme must apply to its respective contribution to the action. The cumulative funding must not exceed the total eligible costs of the action and the support from the different Union programmes may be calculated on a pro-rata basis in accordance with the documents setting out the conditions for support.
To this end, the application form (part B) requires the applicant to provide information concerning other EU grants for the same proposed project under the section 8 Declarations/Double funding.
CEF grants are not considered State aid. However, Union funds channelled through the authorities of Member States become State resources and can constitute State aid if all the other criteria of Article 107 TFEU are met. State aid rules fully apply to the measures funded by the Recovery and Resilience Facility. As a rule, State aid measures must be notified to and cleared by the Commission before funds are granted, unless they comply with the conditions of the applicable General Block Exemption Regulation declaring certain categories of aid compatible with the internal market in application of Articles 107 and 108 TFEU.
Read it on the EU portal ↗Answered 7 Nov 2025
If a project is applying to national funding in addition to CEF funding, applicants should indicate the details of the foreseen national funding scheme in part B of the application form. It is important that the applicants explain the financial viability and risk management of the project in the case that the national scheme does not materialise (e.g. in the risk management section).
Read it on the EU portal ↗Answered 7 Nov 2025
No, there is no legal requirement regarding the expected commissioning timeline. However, the action implementation should be realistic and foreseeable. Please note that action duration can go up to 31.12.2031 (extensions are possible, if duly justified and through an amendment request).
Read it on the EU portal ↗Answered 6 Nov 2025
There is no recommended duration of the action. The duration should be defined based on the action needs and realistic assumptions. Action duration can go up to 31.12.2031 (extensions are possible, if duly justified and through an amendment).
Read it on the EU portal ↗Answered 5 Nov 2025
No, CEF funding is not considered state aid.
Read it on the EU portal ↗Answered 5 Nov 2025
Based on the CEF Regulation, every year promoters of a project, including Member States, can apply for their project to have the status of cross-border projects in the field of renewable energy (‘CB RES status’) and therefore be included in the list of projects (‘the CB RES list’). The CB RES list includes all projects having received a CB RES status by Commission decision.
Obtaining the CB RES status is a precondition to apply for CEF funding for studies and works in support of CB RES projects. A promoter may decide to apply for the CB RES status for their project, but not apply for CEF financial support at a later stage.
Read it on the EU portal ↗Answered 5 Nov 2025
Cross-border projects in the field of the renewable energy are those listed in Commission Delegated Regulation (EU) 2024/2613.
According to Article 2 (k) of CEF Regulation, a cross-border project in the field of renewable energy (CB RES project) means a project selected or eligible to be selected under a cooperation agreement or any other kind of arrangement between two or more EU Member States or arrangements between one or more Member States and one or more third countries as set out in Articles 8, 9, 11 and 13 of RED II in the planning or deployment of renewable energy, in accordance with the criteria set out in Part IV of the Annex to the CEF Regulation.
Read it on the EU portal ↗Answered 5 Nov 2025
Grants may not produce a profit (i.e. surplus of revenues + EU grant over costs). If there is a profit, the amount of the profit will be deducted from the final grant amount.
Read it on the EU portal ↗Answered 5 Nov 2025
All applicants are advised to get information about the national rules that apply to their projects and follow them. In principle, combination with national support scheme is possible, provided that it complies with state aid rule.
Read it on the EU portal ↗Answered 5 Nov 2025
The applicants should explain all major factors affecting the economic situation of the project, including their implications on the proposed action budget. Such a transparent justification of the reasoning behind the budget calculation should be included in the application. The awarded maximum EU contribution cannot be increased during the action implementation, even if exceptional economic circumstances are demonstrated by the beneficiaries.
Read it on the EU portal ↗Answered 5 Nov 2025
No, activities (work packages and tasks) may also be sequential. Moreover, a grant proposal does not need to cover the whole CB RES project, but may also address only some (more advanced) components.
Read it on the EU portal ↗Answered 5 Nov 2025
The list of the central government officials that act as the CB RES contact points is available in the programme webpage. They may be contacted in relation to e.g. a fully fledged cooperation agreement to be signed for the works action grant application.
Read it on the EU portal ↗Answered 5 Nov 2025
Yes, to apply for CBRENEW studies and works grants, the precondition is to be included in the list of CB RES projects (the CB RES list).
Read it on the EU portal ↗Answered 5 Nov 2025
According to the article 2 of the Delegated Regulation a ‘host Member State’ means a Member State where the renewables generation facility is physically located. An ‘off-taking Member State’ (often referred to as a “contributing Member State”) means a Member State that makes a financial contribution to the renewable energy generation investment located in another Member State.
Read it on the EU portal ↗Answered 5 Nov 2025
Yes, there is no restriction regarding the studies and works actions’ running in parallel, if the overlap is coherent with the set-up of the respective actions. Please note that important overlap may increase the risks associated to the actions (e.g. delay on one action may generate bottlenecks on the other one) therefore you may need a sophisticated planning and risk management strategy.
Read it on the EU portal ↗Answered 5 Nov 2025
Payments are made to the designated project coordinator, who must then distribute the payments received to the other beneficiaries without unjustified delay.
Read it on the EU portal ↗Answered 7 Nov 2025
Yes, applicants can sign contracts with subcontractors before the signature of their grant agreement. To be eligible, costs must respect all eligibility conditions and must not have been incurred before the submission of the application.
Read it on the EU portal ↗Answered 5 Nov 2025
It varies on a case by case. It may take a few weeks to some months, depending on the applicants’ readiness in terms of administrative steps and any eventual follow up/ recommendations to be implemented following the evaluation.
Read it on the EU portal ↗Answered 5 Nov 2025
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.