This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Projects the EU funded under this call, with the organisation that led each one.
21-PL-TC-Clean Cities Ph. IIIClean Cities – Hydrogen Mobility in Poland (Phase III)
Led by Orlen Spolka Akcyjna · Poland · 2023 · Official record ↗
21-PL-TC-5 HRS in PolandFive hydrogen refueling stations in Poland
Led by Pak Pce Biopaliwa i Wodor Spolka Zograniczona Odpowiedzialnoscia · Poland · 2023 · Official record ↗
21-MT-TC-CI4EPTCharging Infrastructure for the Electrification of Public Transportation
Led by Malta Public Transport Services(Operations) Limited · Malta · 2023 · Official record ↗
21-EL-TC-REAH3Construction of an HRS for public transport means - buses in the bus depot of OSY at Thriasio, Attiki
Led by Avinoil Viomichaniki Emporiki Kai Naftiliaki Etaireia Petrelaion Monoprosopi Anonymi Etaireia · Greece · 2023 · Official record ↗
21-SI-TC-GrEn4TranGreen Energy for Transport
Led by Javno Podjetje Energetika Ljubljana Doo · Slovenia · 2023 · Official record ↗
21-SI-TC-FS-e-FUTUREFraport Slovenija for e-FUTURE
Led by Fraport Slovenija, Upravljanje Letalisc Doo · Slovenia · 2023 · Official record ↗
21-BG-TC-ESAGOElectrification of Sofia Airport Ground Operations
Led by Sof Connect Ead · Bulgaria · 2023 · Official record ↗
21-EL-TC-REAH2Construction of a HRS for passenger cars, light-duty and heavy-duty vehicles in Akrata (Achaia, Western Greece)
Led by Avinoil Viomichaniki Emporiki Kai Naftiliaki Etaireia Petrelaion Monoprosopi Anonymi Etaireia · Greece · 2023 · Official record ↗
21-EU-TC-eAIREstablishment of Electricity Supply and Charging Infrastructure in the Baltic States’ Airports in North Sea-Baltic CNC / TEN-T Corridor for the Transition to Environmentally Friendly Operations
Led by Starptautiska Lidosta Riga · Latvia · 2022 · Official record ↗
21-LV-TC-RIGA EBUS CHARGER P1ELECTRIC BUS CHARGER CONSTRUCTION IN RIGA (PHASE 1)
Led by Rigas Pasvaldibas Sabiedriba Ar Ierobezotu Atbildibu Rigas Satiksme · Latvia · 2022 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Objective:The objective is to support the deployment of Alternative Fuel supply infrastructure, contributing to decarbonising transport along the TEN-T network.
Scope:The following Actions will be supported:
Costs related to vehicles or vessels will not be eligible, except in the case of inland waterway and short sea shipping, if an initial number of vessels is needed to kick-start the use of the supported recharging/refuelling infrastructure. In such case, the eligible cost shall be limited to the difference of cost between a fossil-fuel vessel and the zero-emission vessel(s) proposed.
Costs related to the production of green hydrogen for the purpose of transport will be eligible as synergetic elements under the conditions specified in Section 10.6 of the Work Programme.
1. Admissibility conditions: described in section 5 of the call document 
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in section 6 of of the call document
3. Other eligibility conditions: described in section 6 of the call document
4. Financial and operational capacity and exclusion: described in section 7 of the call document
6. Legal and financial set-up of the grants: described in section 10 of the call document
 
Documents
 
Call documents:
Call document CEF-T-2021-AFIFCOEN
 
Application form and annexes: 
Proposals (including annexes and supporting documents) must be submitted using the forms provided inside the Submission System (NOT the documents available on the Topic page - these are only for information). 
Application form (Part A and B)
Detailed budget table per WP
Timetable (Gantt Chart)
Letter of support (MS agreement)
Environmental compliance file
Financing approval letter (IP)
Financing approval letter (non-IP)
Simplified CBA calculator
List of Implementing Partners and Intermediaries
 
CEF Model Grant Agreement MGA
Decision on unit costs for SME owners
Decision on unit costs for personnel (usual cost accounting practices)
 
Additional documents:
CINEA Guide on economic appraisal for CEF Transport Projects
Multiannual work programme 2021-2027 for the implementation of the Connecting Europe Facility - Transport sector for the period 2021-2023
CEF Regulation 2021/1153
TEN-T Regulation 1315/2013
EU Financial Regulation 2018/1046
 
Applicants asked the EU 193 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
No. The AFIF Calls aim at supporting the deployment of Alternative Fuel supply infrastructure, not fuel production facilities. Only the deployment of electrolysers based on Renewable Energy Sources (RES) may be eligible if required for the viability of the deployment of transport related zero-emission recharging and refuelling infrastructure. Fuels supplied by the supported infrastructure are the ones referred to in the Directive 2014/94/EU of the European Parliament and of the Council of 22 October 2014 on the deployment of alternative fuels infrastructure.
Read it on the EU portal ↗Answered 28 Feb 2024
As regards vessels, the eligible cost shall be limited to the difference in costs between a fossil-fuel vessel and the zero-emission vessel as regards the propulsion system. Costs relating to the propulsion system must be incurred during the cost eligibility period. Other costs related to vessels are not eligible and may consequently incur before the start of the eligibility period.
Read it on the EU portal ↗Answered 28 Feb 2024
Yes, it is possible to apply different prices for ad-hoc users and users with a subscription to the EV charging service provided that it is in line with AFIF Call’s requirement. What is not allowed is the application of discriminatory prices. The Call text specifies in particular that “prices charged […] shall be reasonable, easily and clearly comparable, transparent and non-discriminatory. The operators of the recharging/refuelling infrastructure shall neither discriminate between the prices charged to end users (ad hoc price) and prices charged to mobility service providers nor between prices charged to different mobility service providers. Where relevant, the level of prices may only be differentiated in a proportionate manner, according to an objective justification”. There is no predefined price differentiation in percentage as this has to be assessed on a case-by-case basis for the various components of each pricing model.
Read it on the EU portal ↗Answered 28 Feb 2024
No. Only Preconditioned Air Units (PCA), Air Conditioning Units (ACU) and Ground Supply Equipment (GSE) are eligible to supply aircraft on the ground. On-board systems like APU are not eligible. The following FAQs indicates the eligible equipment for aviation sector:
Read it on the EU portal ↗Answered 28 Feb 2024
No, dual-fuel engines based on the use of alternative fuel and fossil fuel are not eligible under this call. Only dual-fuel engines based on electricity/hydrogen fuel cell or LNG/electricity or hydrogen fuel cell maybe considered eligible.
Read it on the EU portal ↗Answered 17 Jan 2024
No, recharging stations to supply battery trains are eligible neither under the AFIF nor under any of the other CEF call priorities.
Read it on the EU portal ↗Answered 17 Jan 2024
Under the AFIF, OPS facilities in maritime and inland ports are considered eligible as charging points for electric vessels and barges. It can in addition supply auxiliary power for any type of vessels.
OPS for supplying auxiliary power to vessels mooring at the ports may be eligible under the CEF calls under the maritime and inland ports and Motorways of the Sea topics. Please consult the dedicated FAQ via the links:
Read it on the EU portal ↗Answered 17 Jan 2024
No. Only recharging stations supplying electricity for public transport e-buses is eligible in TEN-T urban nodes listed in Annex II of the TEN-T Regulation. This includes the deployment of recharging points in bus depots, opportunity-based recharging devices and related energy storage facilities.
Read it on the EU portal ↗Answered 17 Jan 2024
In accordance with the Model Grant AgreementPDF, the verification of the non-profit rule is not applied to projects supported by unit contributions, since the methodology determining the amounts of the unit contributions respects the principle of sound financial management, in particular the appropriateness of the respective amounts with regard to the required outputs and takes into account foreseeable revenue to be generated by the actions.
Read it on the EU portal ↗Answered 17 Jan 2024
The objective of requesting a minimum power capacity at the grid connection is to ensure that this power capacity will be dedicated either to supply the installed recharging points, or additional ones to be installed in the future, if necessary.
So the grid connection benefitting from a financial support under the AFIF can serve neighbouring services provided that a minimum of 600kVA is always reserved for supplying electric recharging points at the station.
Read it on the EU portal ↗Answered 17 Jan 2024
As regards public transport lines, the AFIF support relates only to recharging stations supplying public transport within a TEN-T urban Node listed in Annex II.2 of the TEN-T Regulation. It does not relate to interurban public transport. Therefore recharging stations located outside these urban nodes are not eligible.
Read it on the EU portal ↗Answered 17 Jan 2024
The distance of 60km between two recharging points allows identifying the eligible sections of the TEN-T road network. The eligible sections appear on red on the eligibility map. On such eligible sections, recharging stations can be deployed anywhere, even within a distance of less than 60km between each of them without affecting the funding conditions.
Read it on the EU portal ↗Answered 17 Jan 2024
A recharging station can serve both directions on a TEN-T eligible road section. In such case only one grid connection with a minimum power capacity of 600kVA will be considered eligible for co-funding. If separate recharging stations are deployed on both sides of the highway to serve both directions of traffic, and each has a dedicated grid connection, then each grid connection will be eligible for co-funding and must have a minimum power capacity of 600kVA.
Read it on the EU portal ↗Answered 17 Jan 2024
No. The Call targets the implementation of new recharging points above 150kW and 350kW. Technical upgrading of existing charging points is not eligible. Upgrading of the service offer by adding new chargers with the relevant power capacity to an existing recharging station is eligible.
Read it on the EU portal ↗Answered 16 Jan 2024
Yes. This may be eligible provided that the infrastructure works to increase the connection capacity are necessary to supply the associated transport infrastructure installed in an existing or new recharging station. The minimum power capacity of the grid connection shall be of 600kVA.
Read it on the EU portal ↗Answered 16 Jan 2024
Yes, a project can be implemented on the basis of a framework construction contract even is signed before the date of application to AFIF. However such contracts, being a framework or other type, have to be compliant with the applicable European or national procurement rules, and in line with the Grant Agreement provisions.
Read it on the EU portal ↗Answered 16 Jan 2024
In case the electricity is not produced locally as part of an integrated project but will be purchased on the market, the applicant will need to provide evidence of commercial arrangements with RES electricity suppliers or to detail its plan for future commercial arrangements with electricity suppliers regarding RES.
Read it on the EU portal ↗Answered 16 Jan 2024
No. “Electric Road” proposals are not eligible under the various topics of the AFIF Calls.
Read it on the EU portal ↗Answered 16 Jan 2024
No. As mentioned in page 10 of the call text, refuelling stations supplying railways are only eligible if supplying sections of the TEN-T rail network for which a derogation from the electrification requirement has been granted in line with Article 12(3) or 39(3) of the TEN-T Regulation or an isolated networks as defined in Article 3 (u) of the TEN-T Regulation, or in terminals for refuelling shunting locomotives.
Read it on the EU portal ↗Answered 16 Jan 2024
Recharging stations operating at 350kW minimum, located on the eligible road sections indicated in the relevant map, may benefit from a grant only if designed to allow electric recharging of Heavy Duty Vehicles (HDV). When in operation, it may in addition allow recharging of individual cars (EV) and Light Duty Vehicles (LDV). Recharging stations at 350kW allowing only the electric recharging of EV and LDV are not eligible.
For electric recharging infrastructure supported in the form of Unit Contribution, the grant is allocated per recharging point and not per charger. Therefore a charger operating at 300kW equipped with 2 DC connectors CCS2 able to charge simultaneously 2 EVs at 150kW will be counted as 2 recharging points even if it can charge as well 1 EV at 300kW.
Read it on the EU portal ↗Answered 16 Jan 2024
Yes. Recharging infrastructure, irrespective of the technical solution adopted, is eligible both in bus depots and as opportunity-based recharging facility along bus lines including at terminal, in urban nodes listed in Annex II.2 of the TEN-T Regulation.
Read it on the EU portal ↗Answered 16 Jan 2024
Yes, increase of electrical grid capacity for the sole purpose of supplying vessels with OPS and port equipment is eligible in association with the deployment of the supply infrastructure. The AFIF calls have dedicated topics for this type of projects. Other topics under the CEF calls can also be relevant depending of the nature of the projects and related objectives.
Read it on the EU portal ↗Answered 16 Jan 2024
OPS infrastructure is eligible under the AFIF calls and is part of the facilities eligible in the CEF calls relating to maritime and inland waterway priorities.
Read it on the EU portal ↗Answered 16 Jan 2024
No. As mentioned in the Call text “the ad hoc price and all its components will have to be clearly displayed at all recharging/refuelling stations to ensure an appropriate information of users prior to the recharging/refuelling session”.
An information provided only via a QR code redirecting to a website is not considered as fulfilling this requirement. The information clearly displayed at the station maybe in an electronic format either on a screen (before any information is requested to the user) and/or on variable message panels or by any other appropriate means.
Read it on the EU portal ↗Answered 15 Jan 2024
No. Upgrading and retrofitting of existing recharging points is not eligible under AFIF.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes. Under the AFIF calls (topics CEF-T-2021-AFIFGEN-WORKS-ZE & CEF-T-2021-AFIFCOEN-WORKS-ZE), fitting or retrofitting of port vehicles and equipment for electric and hydrogen/fuel cell engines is eligible, in association with the deployment of the alternative fuel supply infrastructure in the port. Note that “the eligible cost shall be limited to the difference in costs between a fossil-fuel vehicle/equipment and the zero-emission vehicle/equipment as regards the propulsion system”.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes, if the airport is directly connected to an eligible TEN-T road section as defined in the relevant maps (see the eligibility maps) or if the infrastructure is installed within a driving distance of 2km from this section and is publicly accessible to any road users. The same requirements as for any recharging points are applicable. Note that recharging stations exclusively dedicated to airport ground operations in TENT-T airports are eligible under the calls CEF-T-2021-AFIFCOEN and CEF-T-2021-AFIFGEN.
Read it on the EU portal ↗Answered 15 Jan 2024
The deployment of hydrogen refuelling stations supplying railways is eligible in terminals with a view to refuelling shunting locomotives provided that the supply infrastructure is accessible to all interested users and not reserved for the exclusive use of one single operator.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes. As long as the grid connection and the recharging point power are compliant with the requirements of the Call, there is no minimum number of recharging point set.
Read it on the EU portal ↗Answered 15 Jan 2024
For an application submitted under the first cut-of date, the eligibility of costs may start as from the 1st of January 2021. For all following cut-off dates, the eligibility of costs may start at the earliest at the application date. Stations partially or integrally installed before the start of the cost eligibility period will not be eligible.
Read it on the EU portal ↗Answered 15 Jan 2024
No. Spatial data in the form of geographic data is not yet accessible in the TENTEC viewer. However, location information on existing recharging points defining eligible TEN-T road sections is accessible.
Read it on the EU portal ↗Answered 15 Jan 2024
Applications can cover the deployment of recharging infrastructure for both light-duty and heavy-duty vehicles. However only recharging points of a minimum power output of 150kW or 350kW will be considered eligible.
Read it on the EU portal ↗Answered 15 Jan 2024
Under this topic:
Read it on the EU portal ↗Answered 15 Jan 2024
The list of urban areas indicated in the Annex II point 2 of TEN-T Regulation are considered as urban nodes for this call and are therefore eligible as such. The urban nodes indicated in point 1 are included in point 2.
Read it on the EU portal ↗Answered 15 Jan 2024
No, only fixed Hydrogen Refuelling Stations can be considered eligible under the AFIF calls.
Read it on the EU portal ↗Answered 15 Jan 2024
The necessary construction costs (works) relating to the deployment of a hydrogen station in line with the applicable legislation are eligible under AFIF.
Read it on the EU portal ↗Answered 10 Jan 2024
While there is no minimum number of stations, the indicative minimum CEF amount is €1 million per application. Note that the contribution of each individual project to the TEN-T network will be evaluated, in particular through the priority and impact criteria.
Read it on the EU portal ↗Answered 10 Jan 2024
A project relating to the deployment of supply stations located on the TEN-T road network and including a hydrogen refuelling station (HRS) and electric recharging points has to be submitted in two separate applications. One relating to the HRS under the “zero-emission” topic of the Call, and the second one relating to the recharging points for light and heavy-duty vehicles under the “unit contribution” topic of the Call.
This has to be presented as a global project and a cross-reference between the applications has to be made, in the application form Part B, section 8 “declarations”.
Read it on the EU portal ↗Answered 10 Jan 2024
The update of the eligibility maps will be made available on the 8th of June 2022. For the 5th cut-off date, the update of the eligibility maps will be made available on the 14th of April 2023.
Read it on the EU portal ↗Answered 10 Jan 2024
Yes, on-shore facilities providing containerized hydrogen modules for waterborne transport are eligible. They will be considered in a similar way as hydrogen refuelling stations. The associated modules will be eligible if i) they belong to the infrastructure owner (in the assets account), and ii) they are part of the energy system of each vessel constituting the initial fleet needed to kick-start the use of the related infrastructure.
Read it on the EU portal ↗Answered 10 Jan 2024
No, such a project is not considered eligible, as the exclusive improvement of the grid connection without the implementation of the recharging stations within the same project will only have an indirect contribution to the call objectives.
Read it on the EU portal ↗Answered 9 Jan 2024
Publicly accessible recharging points dedicated to LDV (with a minimum power output of 150kW) and/or to HDV (with a minimum power output of 350kW) may be eligible in the airport area or in the vicinity of the airport area if these recharging points are located within maximum 2km from the TEN-T road network on the relevant TEN-T road sections identified in the eligibility map.
Recharging points for public transport and Heavy Duty Vehicles (350kW) may be eligible in the airport area or in the vicinity of the airport area, irrespective of the 2km distance requirement from the TEN-T road network, if these recharging points are located in an urban node listed in Annex II.2 of TEN-T Regulation. Please also refer to the following FAQ.
Read it on the EU portal ↗Answered 9 Jan 2024
No. As defined by the Call text, only publicly accessible recharging stations located on a safe and secure parking with a minimum power output of 150kW are eligible if designed for serving heavy-duty vehicles.
Read it on the EU portal ↗Answered 9 Jan 2024
No. Recharging points are eligible for funding only when they have been installed as from the starting date in the proposal, which shall not be earlier than the application date.
Read it on the EU portal ↗Answered 9 Jan 2024
No. Chargers installed in residential or non-residential buildings (including underground parking) are out of the scope of the AFIF calls. Only recharging stations of a power output of at least 150kW within a maximum buffer of 2km driving distance from the TEN-T road network are eligible. Note that locations must be open to the public, irrespective of whether they are located on public or on private property.
CEF grants are not considered State aid. For more information on this matter, please consult the following FAQ.
Read it on the EU portal ↗Answered 5 Jan 2024
Yes. Such installations are eligible for funding. Note that battery charging stations are considered energy storage solutions for electric bus charging points so they are considered a synergetic element of a Project. In this case, the eligible cost of this equipment can represent up to a maximum of 20% of the total budget for which the AFIF support is requested.
Read it on the EU portal ↗Answered 5 Jan 2024
A recharging or refuelling infrastructure that would be exclusively dedicated to taxi fleets is not eligible for funding under the AFIF calls.
To be eligible, a recharging or refuelling (hydrogen) infrastructure in an airport has to be in open access to any customer 24/7. Exclusive use of a refuelling/recharging station is allowed only in the case of infrastructure dedicated to public transport fleets (e.g. buses).
Read it on the EU portal ↗Answered 4 Jan 2024
Yes. Such installations are understood as part of the electrolyser’s infrastructure; therefore are eligible provided that they are required for the viability of the deployment of transport related zero-emission refuelling infrastructure. These installations will be considered a synergetic element together with the electrolyser.
Read it on the EU portal ↗Answered 4 Jan 2024
Recharging points located in urban nodes listed in Annex II.2 of the TEN-T Regulation are only eligible when its intended usage is by heavy-duty vehicles. However, if the location is located along the TEN-T road network in a section identified in the “eligibility mapPDF” within the 2-km buffer defined in the Call text, the recharging point will be eligible for light-duty vehicles.
Read it on the EU portal ↗Answered 4 Jan 2024
Yes, investment costs to deploy an operational electric recharging points network are eligible, including backend systems necessary to operate it.
Read it on the EU portal ↗Answered 4 Jan 2024
By default, the Member State’s Letter of Support for a specific project is valid for the entire duration of the ‘rolling’ call, unless the Member State explicitly specifies otherwise. The applicant can thus submit the Letter of Support at the chosen cut-off date.
Read it on the EU portal ↗Answered 28 Feb 2024
Yes. A joint venture or a Special Purpose Vehicle (SPV) can be considered as beneficiaries.
Read it on the EU portal ↗Answered 17 Jan 2024
The term “global project” referred to in the call text comprises all activities covered by the financing approved by the financial institution.
Read it on the EU portal ↗Answered 17 Jan 2024
No. Applications submitted under this Call for Proposals have to be supported by a financial institution in line with the conditions of this Call.
Read it on the EU portal ↗Answered 16 Jan 2024
No. There is no funding limit for projects submitted by applicants from a Member State. However, the eligibility criteria such as the ones relating to the maps for electric recharging points may limit the eligibility to specific sections of the TEN-T network within a Member State. Note that in order to ensure efficiency in EU funding, applicants are strongly encouraged to submit applications for projects with a total requested EU contribution to the eligible costs of no less than €1,000,000. In addition, where possible, related projects should be submitted as one single proposal.
Read it on the EU portal ↗Answered 16 Jan 2024
Any proposal submitted under the AFIF calls has to be supported by a financial institution, irrespective of the fuel targeted. An implementing partner is a financial institution such as the European Investment Bank (EIB) or other national promotional banks having signed an administrative agreement with the European Commission. Other financial institutions such as commercial banks can also support the proposal submitted under this call. The list of implementing partners and intermediaries can be found list-of-implementing-partners-and-intermediaries_cef-t-afif_en.docxWord.
Read it on the EU portal ↗Answered 16 Jan 2024
Where the submission of a CBA is not required, applicants are expected to provide qualitative information on the expected economic, social, environmental and climate impact of the project to which the application relates.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes, it is the responsibility of the applicant to attach all necessary documents, including the Financial Approval Letter and all relevant economic and financial information, to its application by the call deadline.
Read it on the EU portal ↗Answered 15 Jan 2024
The usual administrative sequence for a proposal under AFIF would be i) to engage discussion with the financing institution (IP or non-IP) and ii) seek for Member State validation.
While Member States approval is not required to engage discussion with an Implementing Partner, it will be required at a later stage in order to submit the grant application. It is therefore advised to anticipate Member State approval, in particular if several Member States are concerned.
Both the Financial Approval Letter and the Support Letter for Member State Agreement must be attached to the Application Form.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes, a consortium consisting of partners from several Member States may apply jointly irrespective of the locations in the European Union where the alternative fuels infrastructure will actually be deployed, provided that it makes sense for the entire project.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes. Applicants alone or in a consortium can submit more than one proposal for different projects under the same call and/or under the same topic. Note that if a proposal is addressing more than one topic, applicants must submit a separate proposal under each topic and establish a link between the different proposals.
Read it on the EU portal ↗Answered 10 Jan 2024
Yes. Such proposal can be submitted under the General envelope. In this case the unit grants of the general envelope will apply to all recharging points, including those located in the Cohesion countries.
In order to apply for the unit grants of General and Cohesions envelopes, applicants must submit a separate proposal under each specific call, with a cross-reference to both proposals in the Application form Part A, section 5-Other questions. Note however that applicants applying under the Cohesion envelope must be legal entities established in one of the Member States eligible for funding from the Cohesion Fund.
For more information on the submission of application under the two envelopes, please consult the following FAQs:
Read it on the EU portal ↗Answered 5 Jan 2024
Yes, it is possible. Note however that it is up to the beneficiary to make sure that the applicable procurement rules are respected, being public national or European rules when applicable, or the best value for money principles.
Read it on the EU portal ↗Answered 5 Jan 2024
No, if the financial institution provides funding for a global project that covers both activities included and not included in the Grant application, the financial institution has to indicate “non identical” in the Financial Approval Letter. Then in the section “Description of the Project”, the financial institution has to describe the project supported by the financing while in the section “Description of the activities covered by the Grant Application” only the specific work packages for which a CEF support is requested have to be indicated in a clear way.
Note that for activities for which the cohesion support rate is requested, a separate application has to be submitted under the cohesion relevant topics. A cross reference between the two different applications has to be made in the application form as indicated in this FAQ.
Read it on the EU portal ↗Answered 5 Jan 2024
Costs of an affiliated entity linked to an applicant cannot be combined. The roles of participants in a proposal must be defined separately. Subsequently, the budget table will have lines specific to the relevant participants i.e. the coordinator, other beneficiaries and any affiliated entity.
Read it on the EU portal ↗Answered 17 Sept 2024
No. Design activities are considered as “studies” that is not an eligible cost category under the AFIF, as mentioned in point 10 of the call text.
Read it on the EU portal ↗Answered 17 Jan 2024
Yes, costs relating to the final technical checks aiming at putting into service a Hydrogen Refuelling Station or stations supplying any alternative fuel referred to in the AFIF calls is eligible, being considered as part of the construction costs.
Read it on the EU portal ↗Answered 17 Jan 2024
The applicable support rate for LNG bunkering infrastructure serving maritime and inland waterway transport is set at 10% for CEF-T-2021-AFIFGEN-LNG and 20% for CEF-T-2021-AFIFCOEN-LNG (cohesion) of the total eligible cost, irrespective of the source of LNG to be supplied. A BioLNG vessel is considered as being low-emission and priority will be given to actions demonstrating a progressive uptake of bio-LNG.
Read it on the EU portal ↗Answered 16 Jan 2024
No. Mobile equipment such as trailers for the transport and storage of hydrogen to HRS is not considered as part of the supply infrastructure, therefore is not eligible, whatever fuel used for the propulsion system. Note that fixed energy storage facilities may be eligible if required for the viability of the deployment of transport related zero-emission recharging or refuelling infrastructure.
Read it on the EU portal ↗Answered 16 Jan 2024
Yes. A DSO is considered as an eligible entity to apply for CEF funding. However an application targeting only the grid connection will not be considered eligible.
Read it on the EU portal ↗Answered 16 Jan 2024
Yes, OPS equipment on board a short sea vessel may be eligible for the main propulsion provided that the vessel is zero emission, which means that the main propulsion is based on electricity, hydrogen, hydrogen/fuel cell.
Short-sea shipping means the movement of cargo and passengers by sea between ports situated in geographical waters of Member States of the European Union or between a port situated in waters of Member States of the European Union and a port situated in waters of a third country having a coastline on the enclosed seas bordering waters of the European Union.
Read it on the EU portal ↗Answered 16 Jan 2024
As regards port vehicles and equipment, only fitting and retrofitting of the main propulsion system is eligible. Support is “limited to the difference in costs between a fossil-fuel vehicle/equipment and the zero-emission vehicle/equipment as regards the propulsion system”.
Read it on the EU portal ↗Answered 16 Jan 2024
Costs and revenues of the reference scenario that remain unchanged in the project scenario can be excluded from the CBA. In a simplified CBA the applicant can also exclude cost and revenues that register small or marginal changes.
Depending on the size of the project in comparison to the local fuel market, the applicant could indeed claim the impact on the traditional fuel distribution to be small and therefore exclude it from the simplified CBA.
Read it on the EU portal ↗Answered 16 Jan 2024
No. Only the fitting or retrofitting of the main propulsion system is eligible in order to deploy electric or hydrogen vessels.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes, these values are embedded in the Simplified CBA Calculator and the excel model automatically use them to monetise the externalities of the project. To see the unit values click on the button “Open unit values” in Cell C298 of the Sheet “Transport”. These values cannot be changed.
Read it on the EU portal ↗Answered 15 Jan 2024
No. Only green hydrogen production facilities by electrolysers based on Renewable Energy Sources may be eligible as a synergetic element under the conditions specified in the Section 10.6 of the Work Programme. Facilities for purifying, pushing, treating and purging hydrogen as a by-product of an industrial process as well as maintenance of hydrogen pipes are not eligible under the AFIF.
Read it on the EU portal ↗Answered 15 Jan 2024
The Commission award decisions are made public once adopted (approximately 4 months after each cut-off dates). When doing so the Commission will communicate the status of budget implementation.
Read it on the EU portal ↗Answered 15 Jan 2024
Support to inland waterway vessels is set at 30% of the total eligible cost under the topic CEF-T-2021-AFIFGEN-WORKS-ZE and 50% under the topic CEF-T-2021-AFIFCOEN-WORKS-ZE. Under the condition that a certain number of vessels is needed to kick-start the use of the associated fuel supply infrastructure there is no fixed number of vessels set. It will depend on the magnitude of the project presented in particular vis-à-vis the hydrogen consumption volumes at stake. Eligibility is limited to zero-emission vessels propelled by electric and/or hydrogen powertrains. Propulsion based on hydrogen carrier fuels such as ammonia is eligible as well. The eligible cost are limited to the difference of cost between a fossil-fuel vessel and the zero-emission vessel(s) proposed.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes, an electric powered vessel may be considered eligible as a zero-emission vessel, irrespective of its cargo provided that:
In addition, LNG bunkering vessels are eligible under CEF-T-2021-AFIFGEN-WORKS-LNG irrespective of their propulsion system.
Note that the overall contribution of each application to the Green Deal objectives will be taken into account in the evaluation to select the most sustainable projects.
Read it on the EU portal ↗Answered 15 Jan 2024
The budget detail of the application shall be limited to the eligible costs. The description of non-eligible tasks (Work Packages) is not compulsory unless it is necessary for a good understanding of the content of the proposal and its stage of development.
The applicant should focus on the tasks needed to implement the project that will lead to eligible costs. Only, when the applicant describes ineligible tasks within a work package, the corresponding amount of the ineligible costs should be added in the column ‘ineligible costs’ of the budget contained in part A of the application form.
Read it on the EU portal ↗Answered 10 Jan 2024
To be eligible, costs have to comply with the requirements indicated in Chapter 3, Article 6 of the Model Grant Agreement. In particular, costs have to be incurred during the eligibility period of the Grant Agreement. As regards infrastructure components, a cost is considered incurred when it is delivered to the beneficiary of the grant.
Engineering and project management costs are not eligible under AFIF calls.
Read it on the EU portal ↗Answered 10 Jan 2024
It is up to the applicant depending on the specificities of its project to allocate costs to each application based on the most relevant method, including if necessary a pro-rata calculation. Specific attention shall be paid to the eligibility of those costs and their traceability. A cross reference between the applications has to be made, in the application form Part B, section 8 “declarations” and a justification that the cost allocation does not generate a risk of double funding.
Read it on the EU portal ↗Answered 10 Jan 2024
Yes. Such proposal falls under the scope of the “zero emissions” topic as defined in the Call text.
For additional information on proposals with several projects under the same topic, please consult the following FAQ.
Read it on the EU portal ↗Answered 9 Jan 2024
Yes. As defined by the Call text, the eligible costs shall be limited to the difference in costs between a fossil-fuel vehicle and the zero-emission vehicle as regards the propulsion system. Note that the applicant must duly justify the difference in costs.
Read it on the EU portal ↗Answered 9 Jan 2024
Yes, mobile ACUs may be considered eligible as part of a more global project of electrification of ground handling services at airports.
Read it on the EU portal ↗Answered 9 Jan 2024
Yes. Financing of at least 10% of the project has to be provided by a Financial Institution, either an Implementing Partner (IP) or a non-IP. The remaining budget can be financed by a combination of own financial resources, grants, equity from investors, etc.
For more information on the definition of an IP or a non-IP, please consult the following FAQ.
Read it on the EU portal ↗Answered 9 Jan 2024
No. Only zero-emission vehicles / propulsion systems are eligible under the AFIF calls.
For more information on the eligibility conditions for port vehicles and equipment, please consult the following FAQ.
Read it on the EU portal ↗Answered 9 Jan 2024
No, the Call text does not indicate any optimal upper limit for the project budget.
Read it on the EU portal ↗Answered 9 Jan 2024
The Call text does not establish a specific co-funding rate for cross-border projects under the AFIF calls. Note that the reimbursement rates/amounts are defined in section 10 of the Call text conditions, based on Call topic and the investment type, regardless of the cross-border dimension of the project.
Read it on the EU portal ↗Answered 9 Jan 2024
The budget can be estimated based on a market research. Note however that each project will be evaluated in particular on their maturity, which should take into account the planned procurement procedures and the associated risks of delay.
Read it on the EU portal ↗Answered 9 Jan 2024
Yes. In line with section 10 of the Call text, costs are eligible from the starting date in the proposal, which shall not be earlier than the application date.
Read it on the EU portal ↗Answered 9 Jan 2024
Yes, in accordance with the CINEA Guide on economic appraisal for CEF-T Transport ProjectsPDF, it is required to activate the financial analysis option of the simplified CBA calculator. Activating this option (by answering yes in cell F75 of tab G.Asm) will generate the automatic calculation of the financial indicators. These indicators may be relevant for evaluating the credibility of the funders’ commitments, as well as for assessing the catalytic effect criteria, in accordance with the provisions of the Call text for the Alternative Fuel Infrastructure Facility calls.
Read it on the EU portal ↗Answered 9 Jan 2024
Yes. Such infrastructure falls under the category of recharging facilities supplying port vehicles and equipment and is eligible under the “zero-emissions” topic of the AFIF calls.
Note that port equipment is also eligible for funding under the conditions established in the Call text and underlined by FAQ 17715.
Read it on the EU portal ↗Answered 9 Jan 2024
Yes. Costs for the mobile storage facility would not be eligible; therefore, the grant would be reduced accordingly.
For more information on the eligibility of energy storage facilities, please consult the following FAQ:ec.europa.eu
Read it on the EU portal ↗Answered 5 Jan 2024
Yes, middle voltage electricity power lines (up to 35kV) owned by a Distribution System operator (DSO) may be considered eligible provided that the applicant submits a robust justification based on the energy needs to supply the recharging points for public transport buses. The power line works may be submitted as a synergetic element with a limit of 20% of the total eligible costs of the project.
Read it on the EU portal ↗Answered 4 Jan 2024
Yes, an electrolyser with associated storage facility and necessary compressor may be considered as a synergetic element of a project. In this case, the eligible cost of this equipment can represent up to a maximum of 20% of the total budget for which the AFIF support is requested.
Read it on the EU portal ↗Answered 4 Jan 2024
The level of maturity of each proposal will be evaluated and will be a key component of the global score of the proposal together with the four other criteria. The more a project is mature, the higher the score for this criterion. However, a project does not need to have obtained all necessary permits to be considered eligible.
As regards the financing plan, each proposal under the AFIF needs to provide a Financial Approval Letter from a financial institution demonstrating that the due diligence of the project has been done. Information on the financing plan should be indicated in section 2.3 of the application form, demonstrating that financial resources are identified and will be available so the project can start and be completed within the timeframe indicated in the Call Text.
Read it on the EU portal ↗Answered 17 Jan 2024
The time horizon of the CBA (reference period) should be based on the project's economically useful. In practice, it may be useful to refer to benchmarks.
Based on best practice among projects in the sector we recommend to use the following reference periods:
Deviation from this recommended reference periods must be justified.
Read it on the EU portal ↗Answered 16 Jan 2024
As mentioned in the “horizontal requirements for all alternative fuels infrastructure”, on page 11 of the call text, only the deployment of electrolysers based on Renewable Energy Sources (RES) may be eligible if required for the viability of the deployment of transport related zero-emission recharging and refuelling infrastructure. In addition, this may indeed be considered as a “synergetic” element in the sense of Section 10.6 of the Work Programme as contributing to another policy objective in this case Energy.
Read it on the EU portal ↗Answered 16 Jan 2024
Yes, applicants applying without the support of an Implementing Partner shall fill in the Simplified CBA calculator available in the submission system, in accordance with the guidance provided during the info day (recording can be found webcast.ec.europa.eu) or with the section 3 of the guidance provided cinea-guidance-on-economic-appraisal_cef-t_en.pdfPDF. For proposals applying with the support of an Implementing Partner, a CBA is not mandatory.
Read it on the EU portal ↗Answered 15 Jan 2024
The type of Heavy Duty Vehicles targeted by the AFIF Calls (as defined in Regulation (EU) 2018/858 of 30 May 2018 on the approval and market surveillance of motor vehicles and their trailers, and of systems, components and separate technical units intended for such vehicles, amending Regulations (EC) No 715/2007 and (EC) No 595/2009 and repealing Directive 2007/46/EC) relates to vehicles of categories M2, M3, N2 and N3, so also to coaches and refuse collection vehicles. However, alternative fuel supply infrastructure (electricity recharging or hydrogen refuelling) not publicly accessible, for instance dedicated exclusively to coaches and/or refuse collection vehicles is not eligible for funding.
Read it on the EU portal ↗Answered 15 Jan 2024
A single simplified CBA calculator file covering all countries is acceptable as long as the individual cash flows from the different countries are always clearly identifiable in the calculator and in particular if dedicated local SPVs are bearing the operational risk.
Read it on the EU portal ↗Answered 10 Jan 2024
In case of several applications submitted under different topics but relating to various components of one single project, the Financial Approval Letter from the Financial Institution and the simplified CBA / CBA may cover the entire scope of the project. Note that the corresponding documents will have to be attached to each separate application.
Read it on the EU portal ↗Answered 10 Jan 2024
To be eligible as synergetic element, a green hydrogen production facility has to be used almost exclusively for supplying transport sector. It is accepted, in particular at the beginning of a project, that a marginal share of the hydrogen production is sold to other users than transport ones. The magnitude of this share has to be clearly demonstrated in the business case / simplified CBA of the project.
Read it on the EU portal ↗Answered 10 Jan 2024
In case project activities relate to distinct activities that comprise both servicing of transport users and electricity generation, applicants should make use of the “option” functionality of the simplified CBA calculator, in order to differentiate between the various activities and single out the externalities that are specific to each of them.
Read it on the EU portal ↗Answered 9 Jan 2024
The simplified CBA calculator contains a diversified array of possible externalities, and the relevance of each externality depends on the specificities of each project. In the situation described, applicants shall proceed by taking account of all costs of externalities, including the costs of accidents. As for the latter, one should note that there will be no net impact in cases where the same costs assumptions for externalities equally apply both to the factual and the counterfactual scenario.
Read it on the EU portal ↗Answered 4 Jan 2024
For the purpose of the implementation of the AFIF facility, a ‘built-up area’ should be understood as an area that is intensely developed for housing, commerce, industry, etc. It is an area full of houses, shops, offices and other buildings, with very little open space.
Read it on the EU portal ↗Answered 28 Feb 2024
Yes, financing can be provided by one or several financial institutions as long as the Financial Approval Letter is completed by one financial institution, Implementing Partner (IP) or non-Implementing Partner (non-IP). The IP or non-IP signing the Financial Approval Letter should provide at least 10% of the total budget of the project if it is in the form of debt or without any minimum threshold if it is in form of equity. The rate of 10% cannot be reached jointly by cumulating the financing of the two or more financial institutions.
Note that in case the IP or non-IP signing the above-mentioned letter eventually does not sign the Financial Agreement, the CEF Grant Agreement will not be signed.
Read it on the EU portal ↗Answered 28 Feb 2024
No, under the topics CEF-T-2021-AFIFCOEN-WORKS-ZE and CEF-T-2021-AFIFGEN-WORKS-ZE, the recharging infrastructure supplying public transport in TEN-T urban nodes can be built for the exclusive use of the public transport fleet concerned.
Read it on the EU portal ↗Answered 17 Jan 2024
No. Projects to fit or retrofit railway rolling stock for switching to an alternative fuel propulsion are not eligible for funding under the 2021 CEF call topics.
Note, however, that railway vehicles including shunting locomotives are eligible for ERTMS deployment, irrespective of their propulsion system under CEF Transport SIMOBGEN and SIMOBCOEN Calls, topic ERTMS.
Read it on the EU portal ↗Answered 17 Jan 2024
The minimum power output of 150kW for light duty vehicles or 350kW for heavy duty vehicles applies to a single recharging point irrespective of charger’s total power capacity. Additional information can be found at thisFAQ.
Read it on the EU portal ↗Answered 17 Jan 2024
Recharging points/stations are only eligible if the grid connection has a minimum power capacity of 600kVA.
A project promoter can apply for funding recharging points without applying for a unit contribution for the grid connection, provided that the grid connection was already established before (or is financed via other means). However it will have to be demonstrated that this grid connection has a minimum power capacity of 600kVA.
Read it on the EU portal ↗Answered 17 Jan 2024
It is up to the applicant to describe in the best detailed way possible all positive outputs and possible outcomes of a given project. The application will then be submitted to an evaluation according to the five criteria indicated in the call text point 9 “award criteria”, not the least the “impact” criteria. All five criteria will be scored from 0 to 5 depending of their intrinsic value.
Read it on the EU portal ↗Answered 17 Jan 2024
For the sake of using the simplified CBA calculator, applicants may consider “accidents” and "noise emissions" by hydrogen cars to be equivalent to fossil fuel cars. “Air pollution” may be assumed equal to zero for hydrogen cars.
According to the source of the hydrogen, the mobility supported by the project will have a different greenhouse effect. If the hydrogen is fully green, the unit cost of GHG emissions may be assumed equal to zero. For other forms of hydrogen, the applicant shall estimate the total amount of CO2 (equivalent) for the annual production of the hydrogen that will be used through the project. The monetisation can be done using the values for €tCO2 provided on page 25 of CINEA Guide on economic appraisal for CEF-T Transport Project (cinea-guidance-on-economic-appraisal_cef-t_en.pdfPDF).
Read it on the EU portal ↗Answered 17 Jan 2024
As a precondition for co-funding, the alternative fuels recharging infrastructure has to be located on the TEN-T network, in line with the requirements indicated in the call text, including the 2 km buffer. The presence of service facilities is not part of these requirements and it is up to the applicant to demonstrate the relevance of the proposed locations in line with the TEN-T policy and the objectives of the call.
Read it on the EU portal ↗Answered 17 Jan 2024
After checking the quality of the external data used for producing the maps, it cannot be ensured that all the existing 350 kW station can serve Heavy Duty Vehicles. Therefore, we have published an updated map, where all the road sections are eligible (see eligibility maps).
Read it on the EU portal ↗Answered 17 Jan 2024
The “synergetic” element mentioned in Section 10.6 of the Work Programme is not applicable to these Call Topics: CEF-T-2021-AFIFCOEN-UNITS and CEF-T-2021-AFIFGEN-UNITS. For the other Topics, it has to be demonstrated that the “synergetic elements” of a proposal contribute “significantly to improve the socio-economic, climate or environmental benefits of the Action”.
Read it on the EU portal ↗Answered 16 Jan 2024
No. The financial institution has to complete its due diligence “in line with its own rules, policies and procedures” for the purpose of the its “own” financing. Therefore, a third party cannot perform such a due diligence.
Read it on the EU portal ↗Answered 16 Jan 2024
The Financial Approval Letter has to follow the template provided on the Funding and Tender opportunities portal. As regards the content and level of detail of the Financial Approval Letter, the financial institution, when performing its due diligence of the project, shall apply its own rules, policies and procedures and reflect their outcome in the Financial Approval Letter.
Read it on the EU portal ↗Answered 16 Jan 2024
No. The AFIF only supports the installation of alternative fuels supply infrastructure for public transport in depots, including site adaptations that may be necessary.
Read it on the EU portal ↗Answered 16 Jan 2024
No, it is not compulsory to have contract signed with landowners to submit an application for the deployment of recharging stations. Note however that each project will be evaluated based in particular on its level of maturity.
Read it on the EU portal ↗Answered 15 Jan 2024
A recharging station refers to a location (site) where chargers are installed with several connectors. A recharging point refers to the capacity to recharge one vehicle at a time. Therefore, the number of recharging points that will be considered in a recharging station will be the total number of recharging points able to charge vehicles simultaneously at the minimum power of either 150kW or 350kW. The grant component for the grid connexion will be considered on the basis of 1 single fix Unit contribution per station for a minimum power of 600kva serving the recharging points installed.
Read it on the EU portal ↗Answered 15 Jan 2024
Specific requirements are listed in the Call text in the section “Horizontal requirements for all publicly accessible recharging and hydrogen refuelling points for road transport”. In particular, recharging points have to be publicly accessible on a 24/7 basis without discriminatory access, they should provide for sufficient parking space for the concerned vehicles. Moreover the recharging stations have to be accessible for persons with disabilities.
Read it on the EU portal ↗Answered 15 Jan 2024
The eligibility of recharging stations is based on specific maps for either stations at minimum 150kW or stations at minimum 350kW (see the eligibility maps) which show the current state of deployment on the TEN-T road network. The eligibility varies depending on the road sections. It is therefore compulsory to indicate, if not the exact locations of the recharging stations, at least in which road sections (with Degrees-Minutes-Seconds geographical coordinates) the recharging stations will be installed with the expected number of recharging points. This information will be taken into consideration to evaluate the maturity of a proposal. Note that for eligible sections, a tolerance up to 2km driving distance from the actual eligible road network applies.
Read it on the EU portal ↗Answered 15 Jan 2024
Specific requirements are listed in the Call text in the section “Horizontal requirements for all publicly accessible recharging and hydrogen refuelling points for road transport”. In particular, recharging points have to be publicly accessible on a 24/7 basis without discriminatory access, they should provide for sufficient parking space for the concerned vehicles. Moreover the recharging stations have to be accessible for persons with disabilities.
Recharging stations dedicated to HDV may be designed in such a way that light duty vehicles and any other type of electric vehicles can access them as well.
Read it on the EU portal ↗Answered 15 Jan 2024
Yes, the recharging point installed in a location can be put into operation progressively to meet the evolving demand, provided that the basic technical requirements indicated in the call text are fulfilled, in particular the minimum power capacity of the grid connection. The total number of recharging points planned will have to be operational at the latest by the end of the eligibility period of the Grant Agreement.
Read it on the EU portal ↗Answered 15 Jan 2024
No, there is no such ratio predefined. Applicants will have to demonstrate that the bulk of hydrogen volumes produced by the facility is serving mobility needs arising from the supply capacity linked to the deployment of a hydrogen station network.
Read it on the EU portal ↗Answered 15 Jan 2024
The minimum power capacity of 600kVA refers to the power delivered from the Distribution Service Operator (DSO) network to the electric sub-station of the recharging station.
Read it on the EU portal ↗Answered 15 Jan 2024
No, this category of works benefits from an exemption as indicated in the following FAQ:
The Environmental Compliance File has to be submitted with the mention “not applicable” and the explanation of the reasons.
Read it on the EU portal ↗Answered 10 Jan 2024
There is no such requirement under the AFIF calls. Note that when relevant, any innovative or digital component of the project has to be explained in Application Form Part B - 4.3 “Social, environmental and other impacts”. This will be taken into consideration for the evaluation of the impact criterion.
Read it on the EU portal ↗Answered 10 Jan 2024
Regarding the deployment of electric recharging points, CINEA will control the actual implementation in the same way for projects co-financed by unit contribution or by a support rate. This means that recharging points have to be installed, connected to the grid and commissioned. In addition, they have to be in operation at the moment of the final payment request.
Read it on the EU portal ↗Answered 10 Jan 2024
As long as the recharging station is designed to be used by Heavy Duty Vehicles, it is possible that it may supply Light Duty Vehicles as well, if the applicable safety rules allow it.
Read it on the EU portal ↗Answered 10 Jan 2024
As mentioned in the Call document section “horizontal requirements for all publicly accessible recharging […] points for road transport” the obligation relates to the ad hoc price at the recharging point only. Prices linked to specific subscription schemes with e-MSPs, or specific company cards are not subject to this requirement. It is however understood that Mobility service providers shall also make available to end users all applicable price information, prior to the start of the recharging session, and specific to their intended recharging session, through freely available, widely supported electronic means, clearly distinguishing the price components charged by the operator of recharging point, applicable e-roaming costs and other fees or charges applied by the mobility service provider.
Read it on the EU portal ↗Answered 10 Jan 2024
Yes, this buffer of 10km applies strictly.
Read it on the EU portal ↗Answered 10 Jan 2024
No. Green hydrogen is produced by using energy based on Renewable Energy Sources (RES) for electricity supply (e.g. solar or wind). Electricity generated from heat waste is not included in the Renewable Energy Sources list defined in the REDII Article 2(1).
Read it on the EU portal ↗Answered 9 Jan 2024
The basic enabling condition for unit AFIF contribution is that a given recharging point has a minimum power capacity of 150 kW, i.e. that it is capable of recharging only one electric vehicle at a time at minimum 150kW.
If a 150kW recharging infrastructure (charger) is equipped with two connectors that can recharge two electric vehicles simultaneously but by definition at a lower power, it will not be eligible for any unit contribution, as the dedicated power supply for recharging an electric vehicle at a time of 150kW cannot be guaranteed.
Read it on the EU portal ↗Answered 9 Jan 2024
No, there is no specific requirement regarding procurement for projects selected under the topic “unit contribution”. However, the Grant Agreement foresees that entities that receive unit contribution have to comply with legal obligations under applicable European, international and national laws (Article 11.2). This includes public procurement if applicable to the future beneficiary. Furthermore, beneficiaries shall avoid any conflict of interest (Article 12).
It is therefore the responsibility of public beneficiaries, as for any other CEF/AFIF grant, to make sure that tendering processes are in line with the applicable public procurement rules.
Read it on the EU portal ↗Answered 9 Jan 2024
No. The AFIF will only fund projects based on a blend or combination between EU grants and financial support from a financial institution either having signed an Administrative Agreement with the European Commission (Implementing Partners) or being a commercial bank.
Note however that under some conditions, the financing from a financial institution may also be attributed to the Public Transport Authority (PTA) as borrower. For more information, consult the following FAQ.
Read it on the EU portal ↗Answered 9 Jan 2024
No specific requirement has been established by the Call regarding the origin of the green energy. It is up to the applicant to provide clear evidences that the electrolyser will only use Renewable Energy Sources (RES).
Read it on the EU portal ↗Answered 9 Jan 2024
CINEA does not set minimum or maximum values for the discount rate. An applicant may indeed deviate from the discount rate proposed in the simplified CBA calculator if the default rate does not reflect specific parameters that the applicant considers appropriate for his project, such as its cost of funds, debt or equity, or the risks borne by the applicant considering all mitigates. In case of deviation from the default rate, applicants should always ensure that the application contains a credible justification for the rate actually used, duly explaining the reasons therefor.
Read it on the EU portal ↗Answered 9 Jan 2024
The reference periods for transport included in the tab “G;Asm” of the simplified CBA calculator are indicative, and provided as reference values. These reference values are based on certain assumptions (for example no terminal value, e.g. no retrofitting and standard maintenance). As indicated in the following FAQ 18107, applicants may retain a different duration in the calculator provided that the application contains relevant justification for the proposed duration or a reason for deviating from the reference value.
Read it on the EU portal ↗Answered 9 Jan 2024
Yes, this can be acceptable provided that the cumulated power output of 600kVA minimum resulting from the grid connection and the associated electricity production and storage equipment can be delivered to the recharging infrastructure at any time without disruption.
Read it on the EU portal ↗Answered 9 Jan 2024
Automatic authentication means the authentication of a vehicle at a recharging point through the recharging connector or telematics. Automatic authentication allows in principle the starting of a recharging session without further intervention by the user of an electric vehicle and the billing of the recharging service through the mobility service provider linked to that authentication process. However, for projects to be eligible, they must ensure that if automatic authentication is used, a driver of an electric vehicle must always have the possibility to choose a different payment method, e.g. an ad hoc payment.
Read it on the EU portal ↗Answered 9 Jan 2024
The Heavy Duty Vehicles targeted by the AFIF Call (as defined in Regulation (EU) 2018/858 of 30 May 2018 on the approval and market surveillance of motor vehicles and their trailers, and of systems, components and separate technical units intended for such vehicles, amending Regulations (EC) No 715/2007 and (EC) No 595/2009 and repealing Directive 2007/46/EC) include all vehicles of categories M2, M3, N2 and N3, irrespective of whether these are intended for short- or long-haul.
Read it on the EU portal ↗Answered 4 Jan 2024
Yes. Hydrogen production by electrolysis based on Renewable Energy Sources for electricity supply may be eligible in association with a 24/7 publicly accessible HRS network. This would then be considered as a synergetic element representing up to 20% of the total eligible costs of the project. Note that the sustainable use of water resources for the production of green hydrogen will be taken into consideration as well during the evaluation of such a project.
Read it on the EU portal ↗Answered 4 Jan 2024
Yes. Electricity generation may be eligible as a synergetic element in combination with the deployment of electricity supply infrastructure for airport ground operations, in line with Article 10.6 of the CEF Work Programme. Such a synergetic element shall not represent more than 20% of the total eligible costs of the project. It will have to be demonstrated that the synergetic element contributes “significantly to improve the socio-economic, climate or environmental benefits of the project”.
Read it on the EU portal ↗Answered 4 Jan 2024
For the sake of simplification, it is acceptable to use EU-27 general values where the specific country values in the "Transport” sheet is within a reasonable range compared to the EU-27 general value. When the value for a specific country is outside this range, the specific country values in the "Transport" sheet in each specific line shall be provided manually as input. As a guidance, an interval of +/- 20% of the EU-27 general value can be considered as a reasonable range. Outside this interval, applicants are invited to substantiate their choice if they opt for not applying the relevant country-specific value.
Read it on the EU portal ↗Answered 4 Jan 2024
As indicated in the call documents, “staffing and administrative costs” are not eligible for funding under the AFIF.
Read it on the EU portal ↗Answered 10 Jan 2024
No. It is not possible to extend the project duration beyond 36 months for projects submitted under topics “unit contribution”. The 36 months implementation period starts as from the cut-off date in line with the period of costs eligibility considering that projects may have started before the signature of the Grant Agreement. This is meant to support highly mature projects and subsequent fast deployment of the infrastructure.
Read it on the EU portal ↗Answered 16 Jan 2024
For situations where the financing agreement has already been signed before the submission of application, the following FAQ can be consulted.
If the financing agreement is completed before the signature of the Grant Agreement, it means that it may not be necessary for the implementation phase and this will be taken into account when assessing the “catalytic effect” criteria.
Read it on the EU portal ↗Answered 9 Jan 2024
Showing the 150 most recent of 193 answers. The rest are on the EU portal's FAQ page.
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17