Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Projects the EU funded under this call, with the organisation that led each one.
23-PL-TM-Wisla River BridgeWorks on the railway line no. 12 Skierniewice – Łuków (C-E20), bridge over Wisła River
Led by Pkp Polskie Linie Kolejowe Spolka Akcyjna · Poland · 2024 · Official record ↗
23-DK-TM-KALVEBOD-WORKSIncreasing the railway freight and passenger capacity at Kalvebod to civilian and military dual use (Works)
Led by AS Oresundsforbindelsen · Denmark · 2024 · Official record ↗
23-HU-TM-TATAStudies for the implementation of the rail loading infrastructure at Tata station
Led by Kozlekedesi Es Beruhazasi Miniszterium · Hungary · 2024 · Official record ↗
23-LV-TM-RBMMLV-CEF2-3MMIntegration on the Military Mobility requirements in the Latvian part of the Rail Baltica project (Part 3)
Led by Ministry of Transport · Latvia · 2024 · Official record ↗
23-LV-TM-4PRIX"Reconstruction of the 4th Aircraft Apron of SJSC ""International Airport ""Riga"""" for Ensuring Civilian-Defence Dual Use TEN-T Infrastructure"
Led by Starptautiska Lidosta Riga · Latvia · 2024 · Official record ↗
23-PL-TM-MULTIRAILHUBConstruction of the multimodal railway transshipment hub on the Ostrów Grabowski peninsula in the port of Szczecin
Led by Zarzad Morskich Portow Szczecin i Swinoujscie Spolka Akcyjna · Poland · 2024 · Official record ↗
23-EE-TM-EstMilMob-E67 NorthEnhancing military mobility in Estonia by improving dual-use road transport link in road E67 situated in the North Sea Baltic transport corridor connecting Baltic states and Central Europe to Finland.
Led by Transpordiamet · Estonia · 2024 · Official record ↗
23-IT-TM-SWIFTRAILEnabling Swift Military Movements in La Spezia
Led by Autorita di Sistema Portuale del Mar Ligure Orientale · Italy · 2024 · Official record ↗
23-LV-TM-SalacaMilMobReconstruction of the bridge over Salaca for enhanced dual use
Led by Valsts Sabiedriba Ar Ierobezotu Latvijas Valsts Celi · Latvia · 2024 · Official record ↗
23-FI-TM-HIRVIE75 Hirvas-Rovaniemi-Vikajärvi development
Led by Vaylavirasto · Finland · 2024 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Scope:In accordance with Article 9(2)(c) and Article 12 of the CEF Regulation, studies and/or works, related to the following actions will be supported:
As provided in Article 12(1)(c) of the CEF Regulation, such actions are to take into account the infrastructure requirements applicable to certain categories of dual-use infrastructure actions, as set out in the implementing act adopted pursuant to Article 12(2) of the CEF Regulation (https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=uriserv%3AOJ.L_.2021.288.01.0037.01.ENG&toc=OJ%3AL%3A2021%3A288%3ATOC), as well as be located on the EU military transport network established by the Council in November 2018, last updated in July 2019, including any future updates by the call deadline.
Support will not be given for projects in the areas of ERTMS, recharging infrastructure and retrofitting rail freight (noisy) wagons under this call.
1. Admissibility conditions: described in section 5 of the call document
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in section 6 of of the call document
3. Other eligibility conditions: described in section 6 of the call document
4. Financial and operational capacity and exclusion: described in section 7 of the call document
Submission and evaluation processes: described section 8 of the call document and the Online Manual
Award criteria, scoring and thresholds: described in section 9 of the call document
Indicative timeline for evaluation and grant agreement: described in section 4 of the call document
6. Legal and financial set-up of the grants: described in section 10 of the call document
 
Documents
Call document CEF-T-2023-MILMOB
 
Application form and annexes:
Proposals (including annexes and supporting documents) must be submitted using the forms provided inside the Submission System (NOT the documents available on the Topic page - these are only for information).
Application form (Part A and B)
Detailed budget table per WP
Timetable (Gantt Chart)
Letter of support (MS agreement)
Environmental compliance file
Military network map declaration
 
Additional documents: 
CEF Model Grant Agreement MGA
Decision on unit costs for SME owners
Decision on unit costs for personnel (usual cost accounting practices)
Framework Partnership Agreement FPA
Multiannual work programme 2021-2027 for the implementation of the Connecting Europe Facility - Transport sector for the period 2021-2023
CEF Regulation 2021/1153
TEN-T Regulation 1315/2013
EU Financial Regulation 2018/1046
Applicants asked the EU 37 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
Projects in the areas of (i) ERTMS, also with interlocking devices (including technical buildings/premises where any equipment related to interlocking is stored) or GSM-R components, (ii) recharging infrastructure and (iii) retrofitting rail freight (noisy) wagons are not eligible under the Military Mobility Call as the Union contribution must exclusively take the form of unit contributions under the Connecting Europe Facility (CEF) Transport sector.
Read it on the EU portal ↗Answered 7 Aug 2026
Cyber security systems are only eligible when they are part of a proposal addressing the adaption of TEN-T sections for civilian-military dual use. A stand-alone project addressing the development of a higher level of cyber security is not eligible under CEF.
As defined in the Commission Implementing Regulation (EU) 2021/1328, the cybersecurity dual-use requirement includes cybersecurity equipment, solutions and systems directly related to project proposals linked to the resilience of dual use infrastructure, where it is appropriate.
Read it on the EU portal ↗Answered 31 Jul 2026
No, fencing in inland/maritime ports is not supported for funding under CEF Transport Military Mobility Call, unless it is an integral and necessary part of a (re)construction of a port handling area in line with dual-use requirements on “Multimodal equipment handling (road, rail, maritime and inland waterways)” as defined in Table 6 of the ANNEX to the Regulation (EU) 2021/1328 .
Read it on the EU portal ↗Answered 14 Jul 2026
If the project exceeds the values defined for dual-use requirements in the Implementing Regulation (EU) 2021/1328, it is still eligible to apply. However, the proposal must clearly justify the need for implementing a level of infrastructure requirement going beyond the values set out in the Implementing Regulation (EU) 2021/1328 and demonstrate that this is necessary for both civilian and defence needs.
If the application does not demonstrate and justify the need to exceed the values of dual-use requirements set out in the Implementing Regulation (EU) 2021/1328, based on the article 12(d) of Regulation (EU) 2021/1153, costs shall be eligible only up to the level of infrastructure requirement(s) necessary for dual-use.
In general, all proposals should describe which dual-use requirements are addressed by the project as stated in this FAQ: ec.europa.eu
Read it on the EU portal ↗Answered 29 Jun 2026
The (re)building of the gates/access points is considered superstructure and it is not eligible for funding. ITS solutions applied to the gates/ access points of the port can be considered eligible as part of a broader proposal. Please note however that the evaluation of proposals will take into account their relevance for military mobility purposes.
Read it on the EU portal ↗Answered 29 Jun 2026
Shore-side electricity supply in ports known as cold ironing may be supported under the Military Mobility call as an ancillary element to a dual-use infrastructure, e.g. a berth. However, as a stand-alone project, projects addressing shore-side electricity alone would hardly demonstrate military mobility relevance and would thus have very low priority.
Read it on the EU portal ↗Answered 29 Jun 2026
The construction of combined bridge piers is eligible under Military Mobility as long as it is directly resulting from the construction/upgrading of the road/railway infrastructure.
Read it on the EU portal ↗Answered 29 Jun 2026
Yes, under CEF Transport Military Mobility Call, the installation of buoys and lighting is eligible for funding as it complies with the “Sea port operating period” dual-use requirement.
Read it on the EU portal ↗Answered 29 Jun 2026
Yes, under CEF Transport Military Mobility Call, the construction/upgrade of multimodal freight terminals covering parking, manoeuvring areas and railroads tracks for unloading is eligible for funding.
Read it on the EU portal ↗Answered 29 Jun 2026
No, the production of electricity is not eligible for funding as a synergetic element as it is not considered relevant for civilian-defence dual-use under CEF Transport Military Mobility Call.
Read it on the EU portal ↗Answered 29 Jun 2026
Under CEF Transport Military Mobility Call, the (re)construction of internal roads in maritime ports is in principle not eligible for funding unless all the following conditions are met:
(i) the proposal demonstrates that such infrastructure is relevant for dual use (civilian and defence), and
(ii) a rail access does not exist in the port at the time of submission of the application or it is not currently under construction, and
(iii) the project does not aim at increasing road transport capacity but addresses a significant bottleneck for the last mile connection.
The (re)construction of internal roads in inland ports is eligible for funding if it is demonstrated that such infrastructure improves the military mobility in the port.
The utilities installations (e.g. water, electricity) in maritime ports or inland ports are eligible for funding, only if it is necessary for a relevant basic port infrastructure, and as long as it does not provide selective advantage to a particular operator or group of operators.
Read it on the EU portal ↗Answered 29 Jun 2026
Under CEF Transport Military Mobility Call, (re)construction of border crossing points and buildings for custom staff operations is not eligible for funding. This type of projects is eligible under CEF-T-2026-SAFEMOBGEN call.
Read it on the EU portal ↗Answered 29 Jun 2026
Yes, under CEF Transport Military Mobility Call, the electrification of line tracks and upgrade/construction of electrification systems is eligible for funding. As explained in the remark to the dual-use requirement 5 “Electrification system availability” (Table 3 “Railways” of Annex to the Commission Implementing Regulation 2021/1328), electrification back-up systems are relevant for stations or multimodal handling facilities but not for railway lines.
Read it on the EU portal ↗Answered 29 Jun 2026
No, under CEF Transport Military Mobility Call, the purchase of a fixed or mobile crane is not eligible for funding. As specified in the Commission Implementing Regulation 2021/1328 (remark to the dual-use requirement “Loading ramps and handling equipment/ Parking capacity”, table 6 “Multimodal equipment handling (road, rail, maritime and inland waterways)”): buildings, storage and warehouse facilities, cranes, conveyors, and other devices for moving freight, and mobile assets such as locomotives are excluded.
Read it on the EU portal ↗Answered 29 Jun 2026
No. Investments in rolling stock are not eligible under the Military Mobility call.
Read it on the EU portal ↗Answered 29 Jun 2026
No, ‘deployment of military forces’ is not an eligibility criterion. Eligibility criteria are listed in section 6 of the Call document.
Read it on the EU portal ↗Answered 29 Jun 2026
Purchase and installation of energy generators in the port is considered eligible for funding as it complies with the dual-use requirement on “Sea port operating period” as defined in the Commission Implementing Regulation (EU) 2021/1328.
Read it on the EU portal ↗Answered 29 Jun 2026
No, the renewal of mobile assets is not eligible for funding.
Read it on the EU portal ↗Answered 29 Jun 2026
Modernisation of locomotives is not eligible for funding.
Modernisation of freight platforms is eligible for funding as long as it addresses dual-use requirement(s) on Multimodal equipment handling (road, rail, maritime and inland waterways) as defined in the Commission Implementing Regulation (EU) 2021/1328.
(Re)construction/modernisation of diesel refueling points for locomotives is not eligible for funding, unless it concerns a rail connection to the airport.
Read it on the EU portal ↗Answered 29 Jun 2026
Yes, railway/road connections to a seaport as a last mile connection to the TEN-T and the EU military transport network are eligible for funding under the Military Mobility Call. Proposals may be located both outside and within the perimeter of the seaports. Proposals located both within and outside the perimeter of the seaports where the outside part of the rail line/road connection is not located on the TEN-T and the EU military transport network but ensures the last mile connection between the seaport and the TEN-T and the EU military transport network are also eligible for funding under the Military Mobility Call.
Read it on the EU portal ↗Answered 25 Jun 2026
Yes, the (re)construction of the ATS Tower building is eligible for funding as it addresses the dual-use requirement on “Air Traffic Control” (Air Traffic Control infrastructure with sufficient capacity to manage airfield day and night operations) as defined in the Commission Implementing Regulation (EU) 2021/1328.
Read it on the EU portal ↗Answered 25 Jun 2026
Yes. To be eligible, projects aiming at enabling civilian-defence dual use of the infrastructure must be located on the TEN-T network. In addition, the projects must be also located on the EU military transport network as identified in the Military Requirements for Military Mobility within and beyond the EU approved on 20 November 2018 and last updated in May 2023.
Read it on the EU portal ↗Answered 9 Oct 2024
Costs related to transport infrastructure resilience such as stormwater management infrastructure may be supported under the Military Mobility call as an ancillary element to a dual-use infrastructure. However, as a stand-alone project, projects addressing resilience of infrastructure alone would hardly demonstrate military mobility relevance and would thus have very low priority.
Read it on the EU portal ↗Answered 29 Jun 2026
No, under CEF Transport Military Mobility Call, a mobile handling equipment particular for cross-connection to multimodal nodes (rail, air, seaport (LoLo/RoRo) and inland waterways) is not eligible for funding. As specified in the remark to the dual-use requirement “Loading ramps and handling equipment/Parking capacity”: buildings, storage and warehouse facilities, cranes, conveyors, and other devices for moving freight, and mobile assets such as locomotives are excluded”.
Read it on the EU portal ↗Answered 29 Jun 2026
Purchase of a dredger/ dredging equipment is not eligible for funding. Only the costs of dredging operations are eligible for funding.
Read it on the EU portal ↗Answered 29 Jun 2026
The Military Requirements for Military Mobility within and beyond the EU approved on 20 November 2018 have been updated in March 2025. Therefore, the following now applies to the footnote of the EU military transport network in the ‘Military network map declaration’: “Tables 3.1 – 3.27 of Annex II to the Military Requirements for Military Mobility within and beyond the EU, as approved by the Council on 17 March 2025 and consolidated into document 6278/25 ADD1 of 18 March 2025. Applicants are encouraged to contact their national CEF Contact Points to verify whether their project proposal is located on the EU military transport network/the 4 EU Priority Mobility Corridors. Applicants are recommended to use the version of the ‘Military network map declaration’ that is available in the submission system taking into account the update (6278/25 ADD1) referred to above. The declaration must be uploaded duly filled and signed by the competent Member State authority (usually by the Ministry of Defence).
Read it on the EU portal ↗Answered 8 Jul 2026
The following information should be provided in Application form Part B (Technical Description), point 1.7 Dual-use potential (civilian-defence):
As regards the first aspect (to what extent the proposed project contributes to enhanced strategic deployment of military forces in the EU for missions, operations and routine activities?):
As regards the second aspect (to what extent the project eliminates identified gaps on the Member State's infrastructure network, including bottlenecks currently undermining military movements?):
The information provided by applicants should not contain any classified information.
Read it on the EU portal ↗Answered 29 Jun 2026
The competent ministry must sign the Member State agreement (Letter of Support) - frequently this is the ministry competent for transport.
It is for each Member State to designate the competent authority signing the military network map declaration; normally it is signed by the Ministry of Defence.
Read it on the EU portal ↗Answered 29 Jun 2026
The starting date for CEF funded projects will be fixed during the Grant Agreement Preparation. Generally, the starting date will be after the grant agreement signature. Nevertheless, upon the request of a beneficiary, the grant agreement may start at an earlier date – but no earlier than the submission date of the specific proposal.
One example for this would be when the project is being implemented in the context of a larger global project. Some preliminary studies necessary to implement the project may be implemented after the submission of the project in view of accelerating the implementation of the subsequent works. An earlier starting date is then justified in order to consider these costs eligible.
Read it on the EU portal ↗Answered 22 Aug 2024
Yes, the construction of a fixed loading/RoRo ramp in a seaport can be supported for funding as a stand-alone project. Mobile loading ramps, including loading and unloading ramps on vessels, are not relevant for funding neither as a stand-alone project nor as part of a broader proposal.
Read it on the EU portal ↗Answered 8 Jul 2026
No. If a project relates to the upgrade of a berth, it must comply with all dual-use requirements applicable to port berths, including 'berth draught', and 'berth length'.
Read it on the EU portal ↗Answered 29 Jun 2026
The scope of the project may include the construction/upgrade of at least one berth. However, the port must have 3 berths overall after the completion of the project (Commission Implementing Regulation 2021/1328, Table 2, seaports dual-use requirement no.2).
Each berth must have a length of minimum 310m and up to 340m per vessel (Commission Implementing Regulation 2021/1328, Table 2, seaports dual-use requirement no.6). This does not require a quay in the port with a length of 930 m.
The construction of a quay with a total length of less than 930 m is eligible under the Military Mobility call as long as the dual-use requirements no.2 and no.6 mentioned above are met.
Read it on the EU portal ↗Answered 29 Jun 2026
Yes, the runway should be constructed/extended as specified in the Commission Implementing Regulation 2021/1328 (remark to the dual-use requirement “Runway Length”, table 1 “Airports and air traffic management”). The construction/extension of the runway should be suitable for Aircraft Category Strategic Transportation as well as A330/A400M/ IL76/B747/An225/C5/C17 aircrafts.
Read it on the EU portal ↗Answered 29 Jun 2026
No. Proposals concerning air transport infrastructure components can be supported under the Military Mobility call only if they address both civilian and defence needs. If the objective of the proposal is only civilian and does not address the adaptation of the infrastructure for civilian-military dual-use, it cannot be supported under the Military Mobility call.
Read it on the EU portal ↗Answered 29 Jun 2026
No, all dual-use requirements defined in the Commission Implementing Regulation (EU) 2021/1328 are of equal priority. The dual-use requirements to be met by a project must correspond to the identified needs and the project's overall and specific objectives.
Read it on the EU portal ↗Answered 29 Jun 2026
Information on the socio-economic impact analysis and the financial analysis can be provided for the specific project or the wider global project. Under the military mobility call, it is expected that the specific project will include transport infrastructure for civilian-defence dual-use only.
Read it on the EU portal ↗Answered 22 Aug 2024
The military aspects of a study, works or mixed proposal are assessed against the same two criteria: i) to what extent the proposed project contributes to enhanced strategic deployment of military forces in the EU for missions, operations and routine activities; and ii) to what extent the project eliminates identified gaps on the Member State's infrastructure network, including bottlenecks currently undermining military movements.
Please consult FAQ no. 17445 for more detailed information on the content of the above two criteria.
Read it on the EU portal ↗Answered 25 Jun 2026
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.