Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Official evaluation results the EU published for this call.
Funding cutoff score: 12.5. Every funded proposal scored at least this.
Projects the EU funded under this call, with the organisation that led each one.
ODYSSEVOptimised DYnamics of high voltage powertrains: developing Sustainable Systems for Electric Vehicles
Led by Fundacion Circe Centro de Investigacion de Recursos y Consumos Energeticos · Spain · 2026 · Official record ↗
HiVEPHIGH-VOLTAGE FAST-CHARGING EFFICIENT ELECTRIC VEHICLE POWERTRAINS
Led by Rheinisch-Westfaelische Technische Hochschule Aachen · Germany · 2025 · Official record ↗
EnlightennExt geNeration 1200V eLectric hIGH volTage powErtraiN
Led by Ait Austrian Institute of Technology GmbH · Austria · 2025 · Official record ↗
GEN1200Ultra-Efficient Highly-Integrated 1200V Powertrains for Electric Vehicles Enabling Next-Gen Charging Speeds and Compatibility Across Charger Generations
Led by Universiteit Gent · Belgium · 2024 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
GLocalFlexA Global as well as Local Flexibility Marketplace to Demonstrate Grid Balancing Mechanisms through Cross-sectoral Interconnected and Integrated Energy Ecosystems enabling Automatic Flexibility Trading
HORIZON-CL5-2022-D3-01-12 · 2023 · Official record ↗
EMPOWEREco-operated, Modular, highly efficient, and flexible multi-POWERtrain for long-haul heavy-duty vehicles
HORIZON-CL5-2022-D5-01-08 · 2023 · Official record ↗
FLEXSHIPFlexible and modular large battery systems for safe on-board integration and operation of electric power, demonstrated in multiple type of ships
HORIZON-CL5-2022-D5-01-01 · 2023 · Official record ↗
ZEFESZero Emission flexible vehicle platforms with modular powertrains serving the long-haul Freight Eco System
HORIZON-CL5-2022-D5-01-08 · 2023 · Official record ↗
RELiVEReliable & Extended Lifetime for Circular and Modular Battery Electric Vehicles
HORIZON-CL5-2025-04-D5-04 · 2026 · Official record ↗
MEGA WAVE PTOMODULAR ELECTRICAL GENERATOR PTO SYSTEM FOR WAVE - MEGA PTO WAVE
HORIZON-CL5-2023-D3-02-10 · 2024 · Official record ↗
S4MILESolid State Battery Smart & Structural Modular Integration into Vehicle through Flexible Module to Chassis Design
HORIZON-CL5-2024-D5-01-03 · 2025 · Official record ↗
HARPOONERSHigh voltAge, modulaR and low weight electric POwertrains fOr NExt generation waterborne tRanSport
HORIZON-CL5-2024-D5-01-11 · 2025 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Notices the EU posted on this call, newest first. Open one to read the official text.
Call update: EVALUATION results
Published: 07/12/2022
Deadline: 18/04/2024
Available budget: EUR 202,050,000.00
The results of the evaluation for each topic are as follows:
Topic · D5-01-01 · D5-01-02 · D5-01-03 · D5-01-04 · D5-01-05 · D5-01-06
Number of proposals submitted (including proposals transferred from or to other calls) · 13 · 18 · 15 · 5 · 6 · 7
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 0 · 0 · 0 · 2
Number of above-threshold proposals · 9 · 11 · 11 · 3 · 3 · 3
Total budget requested for above-threshold proposals · 69,560,501.00 € · 59,867,451.00 € · 55,347,903.00 € · 24,633,842.00 € · 14,989,056.00 € · 29,658,668.00 €
Number of proposals retained for funding · 2 · 3 · 2 · 2 · 2 · 1
Number of proposals in the reserve list · 2 · 2 · 2 · 1 · 1 · 2
Funding threshold* · 12 · 12.5 · 12.5 · 13.5 · 12.5 · 13
Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 1 · 0 · 1 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 1 · 1 · 1 · 1 · 0 · 1
Number of proposals with scores lower than 13 and higher or equal to 10 · 8 · 9 · 10 · 1 · 2 · 2
Topic · D5-01-07 · D5-01-08 · D5-01-09 · D5-01-10 · D5-01-11 · D5-01-12
Number of proposals submitted (including proposals transferred from or to other calls) · 9 · 58 · 3 · 1 · 8 · 8
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 1 · 0 · 0 · 1
Number of above-threshold proposals · 7 · 44 · 2 · 1 · 7 · 6
Total budget requested for above-threshold proposals · 31,940,010.00 € · 213,597,966.00 € · 5,999,995.00 € · 16,233,889.00 € · 52,462,192.00 € · 44,576,235.00 €
Number of proposals retained for funding · 3 · 4 · 1 · 1 · 2 · 2
Number of proposals in the reserve list · 3 · 4 · 1 · 0 · 2 · 2
Funding threshold* · 12.5 · 14.5 · 10.5 · 13.5 · 13.5 · 12.5
· Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 9 · 0 · 0 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 2
The call for proposals HORIZON-CL5-2024-D5-01 closed on 18/04/2024. 196 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2024-D5-01-01 (IA): 13 proposals
HORIZON-CL5-2024-D5-01-02 (RIA): 18 proposals
HORIZON-CL5-2024-D5-01-03 (RIA): 15 proposals
HORIZON-CL5-2024-D5-01-04 (IA): 5 proposals
HORIZON-CL5-2024-D5-01-05 (RIA): 6 proposals
HORIZON-CL5-2024-D5-01-06 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-07 (RIA): 9 proposals
HORIZON-CL5-2024-D5-01-08 (RIA): 58 proposals
HORIZON-CL5-2024-D5-01-09 (RIA): 4 proposals
HORIZON-CL5-2024-D5-01-10 (RIA): 1 proposals
HORIZON-CL5-2024-D5-01-11 (RIA): 8 proposals
HORIZON-CL5-2024-D5-01-12 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-13 (IA): 7 proposals
HORIZON-CL5-2024-D5-01-14 (IA): 6 proposals
HORIZON-CL5-2024-D5-01-15 (IA): 11 proposals
HORIZON-CL5-2024-D5-01-16 (CSA): 3 proposals
HORIZON-CL5-2024-D5-01-17 (CSA): 1 proposal
HORIZON-CL5-2024-D5-01-18 (RIA): 13 proposals
The submission session is now available for: HORIZON-CL5-2024-D5-01-10(HORIZON-RIA), HORIZON-CL5-2024-D5-01-03(HORIZON-RIA), HORIZON-CL5-2024-D5-01-02(HORIZON-RIA), HORIZON-CL5-2024-D5-01-17(HORIZON-CSA), HORIZON-CL5-2024-D5-01-12(HORIZON-IA), HORIZON-CL5-2024-D5-01-14(HORIZON-IA), HORIZON-CL5-2024-D5-01-05(HORIZON-RIA), HORIZON-CL5-2024-D5-01-13(HORIZON-IA), HORIZON-CL5-2024-D5-01-01(HORIZON-IA), HORIZON-CL5-2024-D5-01-04(HORIZON-IA), HORIZON-CL5-2024-D5-01-08(HORIZON-RIA), HORIZON-CL5-2024-D5-01-11(HORIZON-RIA), HORIZON-CL5-2024-D5-01-06(HORIZON-IA), HORIZON-CL5-2024-D5-01-07(HORIZON-RIA), HORIZON-CL5-2024-D5-01-09(HORIZON-RIA), HORIZON-CL5-2024-D5-01-18(HORIZON-RIA), HORIZON-CL5-2024-D5-01-16(HORIZON-CSA), HORIZON-CL5-2024-D5-01-15(HORIZON-IA)
Next generation powertrain architectures using voltages 1200 V and above might contribute to the achievement of safer, higher-performing and more sustainable end products to serve high volume markets. A holistic approach to the whole powertrain should contribute to determining the optimal next generation voltage level. Project results are expected to contribute to all the following outcomes:
In the last decade, the more and more demanding power and application requirements led to an increase of board net HV voltage from an initial 400V level to 800V in the latest electric vehicles, already trickling down to lower categories. Significantly higher voltages (indicatively, in the 1200V region) may be the next logical step and become standard in the next decade, providing benefits in terms of efficiency, copper use and weight. If not properly managed, they could have a constraining impact on the overall architecture especially in terms of DC charging and efficiency for low power use. Thus, new challenges for the powertrain arise in the areas of the motor, battery, cabling, couplers etc. as well as in electromagnetic compatibility and the development and integration of new power semiconductors.
To successfully address the expected outcomes in the constant drive to improve efficiency and performance while increasing affordability, proposals are expected to address several of the following aspects capable of demonstrating the achievement of the intended objectives at system level:
Exploitation of outcomes, and knowledge from ECSEL/KDT partnership[1] projects should be foreseen where applicable, as well as feedback in terms of future needs to achieve the project outcomes should problems be encountered. The development of the needed semiconductors, however, is not part of this topic's funding, and the proposal is expected to specify the components that the involved semiconductor suppliers guarantee to provide for the research activities.
This topic implements the co-programmed European Partnership on ‘Towards zero emission road transport’ (2ZERO). As such, projects resulting from this topic will be expected to report on the results to the European Partnership ‘Towards zero emission road transport’ (2ZERO) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 5 by the end of the project – see General Annex B.
[1] https://www.kdt-ju.europa.eu/
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
 
7. Specific conditions: described in the specific topic of the Work Programme
 
Documents
Call documents:
Standard application form — call-specific application form is available in the Submission System
Standard application form (HE RIA, IA)
Standard application form (HE RIA IA Stage 1)
Standard application form (HE CSA)
Standard application form (HE CSA Stage 1)
Standard evaluation form — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Standard evaluation form (HE CSA)
Standard evaluation form (HE RIA, IA and CSA Stage 1)
MGA
HE General MGA v1.0
HE Unit MGA v1.0
Call-specific instructions
Detailed budget table (HE LS)
Information on financial support to third parties (HE)
Additional documents:
HE Main Work Programme 2023–2024 – 1. General Introduction
HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2024 – 13. General Annexes
HE Programme Guide
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 6 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
Please notice that all the technologies contributing to expected outcomes should be implemented on the vehicle demonstrator. The vehicle demonstrator should be tested on real roads to assess performance under real driving conditions.
As some potential participants might find difficulties in obtaining all the needed permits in different EU countries, the test on the roads has to be considered only “if and where possible”.
Read it on the EU portal ↗Answered 22 Mar 2024
The Expected Outcomes and Scope introduce the issue by indicating that the topic will demonstrate battery storage systems interfaced to AC or DC distribution systems because, once integrated in the vessel, the battery will be interfaced to a distribution system that will be either DC or AC.
However, this doesn’t preclude the project from designing battery management systems of high voltage battery installations for AC and DC distribution systems, as the topic indicates the project has to address. Therefore there is no mistake in the text.
Read it on the EU portal ↗Answered 22 Feb 2024
An electric motor working at the required voltage is obviously needed for the demonstrator, it’s up to the proposers to decide how to approach the demonstration of the targets, it could be with existing motor designs (if available) or with a new design.
Read it on the EU portal ↗Answered 30 Jan 2024
The topic text says the indicated charging performance has to be proven on a mass market C segment vehicle demonstrator.
Reference to 350kW stations is made since:
• we cannot expect 1200V charging stations to be available on the roads for the real driving demonstration,
• backward compatibility with 400 and 800V is explicitly mentioned in the topic for obvious reasons.
So the required charging speed will be demonstrated at 800V, but even better charging speeds are obviously expected using a 1200V+ charger.
Since the full development of a 1200+V DC charging station is not required, demonstration of performance at the optimised voltage level (including speed and efficiency at partial loads) will be on a lab charging station that will also be needed for component development testing. It is left to proposers to decide how to approach such lab station within their proposal.
Read it on the EU portal ↗Answered 30 Jan 2024
The text clearly indicates a post-800V requirement, while nowhere there is a post-1200V wording. This tension level is indicative, as previous steps have been of 400V, but it’s up to the proposers to confirm if the optimum tension at system level is in this “area” as indicated, or higher, looking at cost, weight, safety etc.
Read it on the EU portal ↗Answered 22 Dec 2023
No, nothing in the topic description would fit this approach - it clearly refers to a Megawatt-level charging system addressing all related issues, and the proposed approach, among other things, would not allow some desired functions like doubling as a peak-time charger hub for up to 6 cars at the same time to be enabled.
When desired, battery swapping has already been explicitly mentioned in previous topics.
Read it on the EU portal ↗Answered 22 Nov 2023
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.