Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Official evaluation results the EU published for this call.
Funding cutoff score: 13.5. Every funded proposal scored at least this.
Projects the EU funded under this call, with the organisation that led each one.
HARPOONERSHigh voltAge, modulaR and low weight electric POwertrains fOr NExt generation waterborne tRanSport
Led by Fundacion Tecnalia Research & Innovation · Spain · 2025 · Official record ↗
eWAVEEfficient HV-electric modular battery and distribution systems for sustainable WAterborne VEssels
Led by I2m Unternehmensentwicklung GmbH · Austria · 2025 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
HighScapeHigh efficiency, high power density, cost effective, scalable and modular power electronics and control solutions for electric vehicles
HORIZON-CL5-2021-D5-01-02 · 2023 · Official record ↗
MARPOWEREfficient zero-emissions gas turbine POWER system for MARitime transport
HORIZON-CL5-2023-D5-01-11 · 2024 · Official record ↗
FLEXSHIPFlexible and modular large battery systems for safe on-board integration and operation of electric power, demonstrated in multiple type of ships
HORIZON-CL5-2022-D5-01-01 · 2023 · Official record ↗
SHIP-AH2OYDevelopment and demonstration of zero-emission propulsion technology on board ships using green hydrogen from liquid organic hydrogen carrier in combination with fuel cells at MW-scale
HORIZON-CL5-2021-D5-01-08 · 2023 · Official record ↗
D-NAVIODigital Ship: Mastering Complexity of the Waterborne Digital Transport through “Cloning of the Ship""""
HORIZON-CL5-2024-D6-01-10 · 2025 · Official record ↗
ALL-DC-SHIPSScalable, Plug & Play and Modular DC Power Systems for low-emission Large Vessels
HORIZON-CL5-2024-D5-01-14 · 2025 · Official record ↗
DC-POWERDirect Current – Power flOws in megawatt-scale Energy gRids
HORIZON-CL5-2023-D3-01-11 · 2024 · Official record ↗
ASTERIx-CAESarAIR-BASED SOLAR THERMAL ELECTRICITY FOR EFFICIENT RENEWABLE ENERGY INTEGRATION & COMPRESSED AIR ENERGY STORAGE
HORIZON-CL5-2022-D3-03-01 · 2023 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Notices the EU posted on this call, newest first. Open one to read the official text.
Call update: EVALUATION results
Published: 07/12/2022
Deadline: 18/04/2024
Available budget: EUR 202,050,000.00
The results of the evaluation for each topic are as follows:
Topic · D5-01-01 · D5-01-02 · D5-01-03 · D5-01-04 · D5-01-05 · D5-01-06
Number of proposals submitted (including proposals transferred from or to other calls) · 13 · 18 · 15 · 5 · 6 · 7
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 0 · 0 · 0 · 2
Number of above-threshold proposals · 9 · 11 · 11 · 3 · 3 · 3
Total budget requested for above-threshold proposals · 69,560,501.00 € · 59,867,451.00 € · 55,347,903.00 € · 24,633,842.00 € · 14,989,056.00 € · 29,658,668.00 €
Number of proposals retained for funding · 2 · 3 · 2 · 2 · 2 · 1
Number of proposals in the reserve list · 2 · 2 · 2 · 1 · 1 · 2
Funding threshold* · 12 · 12.5 · 12.5 · 13.5 · 12.5 · 13
Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 1 · 0 · 1 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 1 · 1 · 1 · 1 · 0 · 1
Number of proposals with scores lower than 13 and higher or equal to 10 · 8 · 9 · 10 · 1 · 2 · 2
Topic · D5-01-07 · D5-01-08 · D5-01-09 · D5-01-10 · D5-01-11 · D5-01-12
Number of proposals submitted (including proposals transferred from or to other calls) · 9 · 58 · 3 · 1 · 8 · 8
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 1 · 0 · 0 · 1
Number of above-threshold proposals · 7 · 44 · 2 · 1 · 7 · 6
Total budget requested for above-threshold proposals · 31,940,010.00 € · 213,597,966.00 € · 5,999,995.00 € · 16,233,889.00 € · 52,462,192.00 € · 44,576,235.00 €
Number of proposals retained for funding · 3 · 4 · 1 · 1 · 2 · 2
Number of proposals in the reserve list · 3 · 4 · 1 · 0 · 2 · 2
Funding threshold* · 12.5 · 14.5 · 10.5 · 13.5 · 13.5 · 12.5
· Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 9 · 0 · 0 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 2
The call for proposals HORIZON-CL5-2024-D5-01 closed on 18/04/2024. 196 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2024-D5-01-01 (IA): 13 proposals
HORIZON-CL5-2024-D5-01-02 (RIA): 18 proposals
HORIZON-CL5-2024-D5-01-03 (RIA): 15 proposals
HORIZON-CL5-2024-D5-01-04 (IA): 5 proposals
HORIZON-CL5-2024-D5-01-05 (RIA): 6 proposals
HORIZON-CL5-2024-D5-01-06 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-07 (RIA): 9 proposals
HORIZON-CL5-2024-D5-01-08 (RIA): 58 proposals
HORIZON-CL5-2024-D5-01-09 (RIA): 4 proposals
HORIZON-CL5-2024-D5-01-10 (RIA): 1 proposals
HORIZON-CL5-2024-D5-01-11 (RIA): 8 proposals
HORIZON-CL5-2024-D5-01-12 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-13 (IA): 7 proposals
HORIZON-CL5-2024-D5-01-14 (IA): 6 proposals
HORIZON-CL5-2024-D5-01-15 (IA): 11 proposals
HORIZON-CL5-2024-D5-01-16 (CSA): 3 proposals
HORIZON-CL5-2024-D5-01-17 (CSA): 1 proposal
HORIZON-CL5-2024-D5-01-18 (RIA): 13 proposals
The submission session is now available for: HORIZON-CL5-2024-D5-01-10(HORIZON-RIA), HORIZON-CL5-2024-D5-01-03(HORIZON-RIA), HORIZON-CL5-2024-D5-01-02(HORIZON-RIA), HORIZON-CL5-2024-D5-01-17(HORIZON-CSA), HORIZON-CL5-2024-D5-01-12(HORIZON-IA), HORIZON-CL5-2024-D5-01-14(HORIZON-IA), HORIZON-CL5-2024-D5-01-05(HORIZON-RIA), HORIZON-CL5-2024-D5-01-13(HORIZON-IA), HORIZON-CL5-2024-D5-01-01(HORIZON-IA), HORIZON-CL5-2024-D5-01-04(HORIZON-IA), HORIZON-CL5-2024-D5-01-08(HORIZON-RIA), HORIZON-CL5-2024-D5-01-11(HORIZON-RIA), HORIZON-CL5-2024-D5-01-06(HORIZON-IA), HORIZON-CL5-2024-D5-01-07(HORIZON-RIA), HORIZON-CL5-2024-D5-01-09(HORIZON-RIA), HORIZON-CL5-2024-D5-01-18(HORIZON-RIA), HORIZON-CL5-2024-D5-01-16(HORIZON-CSA), HORIZON-CL5-2024-D5-01-15(HORIZON-IA)
Project outputs and results are expected to contribute to the following expected outcomes:
The voltage level of battery installations on-board vessels is typically limited and within the regulations for low voltage installations. By increasing the voltage level of the on-board distribution system, the energy conversion can achieve higher efficiencies and be more compact, due to the smaller cross-sectional area of conductors and lower losses. However, for waterborne transport (waterborne transport refers to both maritime and inland waterway transport) applications, challenges remain related to the design of conversion systems and insulation methods for integrating low voltage battery systems in high voltage AC or DC distribution systems. The necessary regulatory aspects also need to be defined to facilitate market take up for waterborne transport. Although e.g. high-voltage Li-Ion battery packs may be presently applied, the current state-of-the-art still offers solutions that are too heavy to enable electrification of a wider range of larger waterborne transport assets. However new developments show potential for a reduction of battery pack weight. Further study of the adaptation and the on-board integration solutions available for recently developed technologies, such as Li-Ion NMC, LTO, LFP is needed.
Building on the current state of the art solutions should contribute towards the battery electrification of a wider range of vessel types, for both maritime and inland waterway transport which are characterized by the need for larger battery systems and longer autonomy.
Projects are expected to address all of the following aspects:
The new solutions should also contribute significantly to the overall safety for on-board battery applications (i.e. for toxic emissions, fire propagation, etc.). The form factor, the battery management system and the interface with the shore side electric grid should also be considered.
The projects are expected to ensure synergies with the Horizon Europe Batteries Partnership and are encouraged to envisage clustering activities with the project funded from the topics HORIZON-CL5-2021-D2-01-02 and HORIZON-CL5-2021-D2-01-03.
This topic implements the co-programmed European Partnership on ‘Zero Emission Waterborne Transport’ (ZEWT). As such, projects resulting from this topic will be expected to report on results to the European Partnership ‘Zero Emission Waterborne Transport’ (ZEWT) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 5 by the end of the project – see General Annex B.
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
 
7. Specific conditions: described in the specific topic of the Work Programme
 
Documents
Call documents:
Standard application form — call-specific application form is available in the Submission System
Standard application form (HE RIA, IA)
Standard application form (HE RIA IA Stage 1)
Standard application form (HE CSA)
Standard application form (HE CSA Stage 1)
Standard evaluation form — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Standard evaluation form (HE CSA)
Standard evaluation form (HE RIA, IA and CSA Stage 1)
MGA
HE General MGA v1.0
HE Unit MGA v1.0
Call-specific instructions
Detailed budget table (HE LS)
Information on financial support to third parties (HE)
Additional documents:
HE Main Work Programme 2023–2024 – 1. General Introduction
HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2024 – 13. General Annexes
HE Programme Guide
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 2 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The Expected Outcomes and Scope introduce the issue by indicating that the topic will demonstrate battery storage systems interfaced to AC or DC distribution systems because, once integrated in the vessel, the battery will be interfaced to a distribution system that will be either DC or AC.
However, this doesn’t preclude the project from designing battery management systems of high voltage battery installations for AC and DC distribution systems, as the topic indicates the project has to address. Therefore there is no mistake in the text.
Read it on the EU portal ↗Answered 22 Feb 2024
No, nothing in the topic description would fit this approach - it clearly refers to a Megawatt-level charging system addressing all related issues, and the proposed approach, among other things, would not allow some desired functions like doubling as a peak-time charger hub for up to 6 cars at the same time to be enabled.
When desired, battery swapping has already been explicitly mentioned in previous topics.
Read it on the EU portal ↗Answered 22 Nov 2023
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.