Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Official evaluation results the EU published for this call.
Funding cutoff score: 12.5. Every funded proposal scored at least this.
Projects the EU funded under this call, with the organisation that led each one.
FLEETfor55State-of-the-art sustainable energy efficiency technologies roadmap for waterborne transport towards the fit-for-55 guidance compliance
Led by Hydrus Anotati Synektiki Michaniki Etaireia Symvoulon Anonymi Etaireia · Greece · 2025 · Official record ↗
SEASTARSSEASTARS: SUSTAINABLE EMISSION ABATEMENT STRATEGIES & TECHNOLOGIES FOR ADVANCED REVOLUTION SHIPS
Led by University of Strathclyde · United Kingdom · 2025 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
D-NAVIODigital Ship: Mastering Complexity of the Waterborne Digital Transport through “Cloning of the Ship""""
HORIZON-CL5-2024-D6-01-10 · 2025 · Official record ↗
SHIP-AH2OYDevelopment and demonstration of zero-emission propulsion technology on board ships using green hydrogen from liquid organic hydrogen carrier in combination with fuel cells at MW-scale
HORIZON-CL5-2021-D5-01-08 · 2023 · Official record ↗
FIT-HORIZONSFlexible Tool Environment for Holistic Retrofits and Decarbonization of Ships
HORIZON-CL5-2025-04-D5-13 · 2026 · Official record ↗
HyEkoTankHydrogen PEM fuel cell system to retrofit ships in the marine transport industry
HORIZON-CL5-2022-D5-01-04 · 2023 · Official record ↗
RETROFIT55RETROFIT SOLUTIONS TO ACHIEVE 55% GHG REDUCTION BY 2030
HORIZON-CL5-2022-D5-01-04 · 2023 · Official record ↗
AIMPERESAI-driven Modular Platform for Emission-Reduction & Efficient Shipping
HORIZON-CL5-2025-04-D5-12 · 2026 · Official record ↗
CirclesOfLifeEnhancing material CIRCularity and Lower Emissions of Ship building processes in all phases of the LIFE cycle
HORIZON-CL5-2023-D5-01-15 · 2024 · Official record ↗
SYNERGETICSSynergies for Green Transformation of Inland and Coastal Shipping
HORIZON-CL5-2022-D5-01-04 · 2023 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Notices the EU posted on this call, newest first. Open one to read the official text.
Call update: EVALUATION results
Published: 07/12/2022
Deadline: 18/04/2024
Available budget: EUR 202,050,000.00
The results of the evaluation for each topic are as follows:
Topic · D5-01-01 · D5-01-02 · D5-01-03 · D5-01-04 · D5-01-05 · D5-01-06
Number of proposals submitted (including proposals transferred from or to other calls) · 13 · 18 · 15 · 5 · 6 · 7
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 0 · 0 · 0 · 2
Number of above-threshold proposals · 9 · 11 · 11 · 3 · 3 · 3
Total budget requested for above-threshold proposals · 69,560,501.00 € · 59,867,451.00 € · 55,347,903.00 € · 24,633,842.00 € · 14,989,056.00 € · 29,658,668.00 €
Number of proposals retained for funding · 2 · 3 · 2 · 2 · 2 · 1
Number of proposals in the reserve list · 2 · 2 · 2 · 1 · 1 · 2
Funding threshold* · 12 · 12.5 · 12.5 · 13.5 · 12.5 · 13
Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 1 · 0 · 1 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 1 · 1 · 1 · 1 · 0 · 1
Number of proposals with scores lower than 13 and higher or equal to 10 · 8 · 9 · 10 · 1 · 2 · 2
Topic · D5-01-07 · D5-01-08 · D5-01-09 · D5-01-10 · D5-01-11 · D5-01-12
Number of proposals submitted (including proposals transferred from or to other calls) · 9 · 58 · 3 · 1 · 8 · 8
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 1 · 0 · 0 · 1
Number of above-threshold proposals · 7 · 44 · 2 · 1 · 7 · 6
Total budget requested for above-threshold proposals · 31,940,010.00 € · 213,597,966.00 € · 5,999,995.00 € · 16,233,889.00 € · 52,462,192.00 € · 44,576,235.00 €
Number of proposals retained for funding · 3 · 4 · 1 · 1 · 2 · 2
Number of proposals in the reserve list · 3 · 4 · 1 · 0 · 2 · 2
Funding threshold* · 12.5 · 14.5 · 10.5 · 13.5 · 13.5 · 12.5
· Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 9 · 0 · 0 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 2
The call for proposals HORIZON-CL5-2024-D5-01 closed on 18/04/2024. 196 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2024-D5-01-01 (IA): 13 proposals
HORIZON-CL5-2024-D5-01-02 (RIA): 18 proposals
HORIZON-CL5-2024-D5-01-03 (RIA): 15 proposals
HORIZON-CL5-2024-D5-01-04 (IA): 5 proposals
HORIZON-CL5-2024-D5-01-05 (RIA): 6 proposals
HORIZON-CL5-2024-D5-01-06 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-07 (RIA): 9 proposals
HORIZON-CL5-2024-D5-01-08 (RIA): 58 proposals
HORIZON-CL5-2024-D5-01-09 (RIA): 4 proposals
HORIZON-CL5-2024-D5-01-10 (RIA): 1 proposals
HORIZON-CL5-2024-D5-01-11 (RIA): 8 proposals
HORIZON-CL5-2024-D5-01-12 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-13 (IA): 7 proposals
HORIZON-CL5-2024-D5-01-14 (IA): 6 proposals
HORIZON-CL5-2024-D5-01-15 (IA): 11 proposals
HORIZON-CL5-2024-D5-01-16 (CSA): 3 proposals
HORIZON-CL5-2024-D5-01-17 (CSA): 1 proposal
HORIZON-CL5-2024-D5-01-18 (RIA): 13 proposals
The submission session is now available for: HORIZON-CL5-2024-D5-01-10(HORIZON-RIA), HORIZON-CL5-2024-D5-01-03(HORIZON-RIA), HORIZON-CL5-2024-D5-01-02(HORIZON-RIA), HORIZON-CL5-2024-D5-01-17(HORIZON-CSA), HORIZON-CL5-2024-D5-01-12(HORIZON-IA), HORIZON-CL5-2024-D5-01-14(HORIZON-IA), HORIZON-CL5-2024-D5-01-05(HORIZON-RIA), HORIZON-CL5-2024-D5-01-13(HORIZON-IA), HORIZON-CL5-2024-D5-01-01(HORIZON-IA), HORIZON-CL5-2024-D5-01-04(HORIZON-IA), HORIZON-CL5-2024-D5-01-08(HORIZON-RIA), HORIZON-CL5-2024-D5-01-11(HORIZON-RIA), HORIZON-CL5-2024-D5-01-06(HORIZON-IA), HORIZON-CL5-2024-D5-01-07(HORIZON-RIA), HORIZON-CL5-2024-D5-01-09(HORIZON-RIA), HORIZON-CL5-2024-D5-01-18(HORIZON-RIA), HORIZON-CL5-2024-D5-01-16(HORIZON-CSA), HORIZON-CL5-2024-D5-01-15(HORIZON-IA)
Project outputs and results are expected to contribute to the following expected outcomes:
Legislative proposals within the EU’s “Fit for 55” package targeting the reduction of waterborne transport emissions will assess emissions reductions based on operational data collected within the framework of the EU’s MRV regulation. Internationally, for global maritime shipping, the forthcoming IMO Carbon Intensity Indicator and Data Collections System (DCS) will be used. Vessels visiting EU ports will need to provide data to ensure compliance with both MRV (EU) and DCS (IMO) data requirements. This change from assessing emission reductions based on design to the direct measurement and verification of actual operational emissions requires a new approach to design. Consequently, the vessel design process will need to employ modelling and simulation techniques which take into account the vessel’s expected operational profile and life cycle so as to ensure that the delivered vessel or modification will deliver the expected emission reductions in the “real world”
For new builds, present improvements in ship energy efficiency have reduced consumption by 15-30% compared to equivalent reference ships in 2008. Contributing to fit for 55 objectives, the challenge is to develop at least three concept vessels which will further improve energy efficiency by at least 20%, compared to a 2022 reference performance for equivalent ships.
This “design for operation” approach will integrate and combine both operational energy savings and emission reduction technologies. Several technologies and solutions to be combined and integrated should be chosen so as to provide the largest impact and these are expected to already be individually demonstrated or developed to TRL 7. This could for example concern various combinations of; power conversion/electrification /energy devices, sustainable climate neutral low emission fuels, HVAC, energy storage, operations, smart energy monitoring, renewables including wind assistance, hydrodynamics, cold ironing, slow steaming, just in time scheduling, propeller designs etc.
In order to address the above-mentioned challenge, proposals are expected to address all the following aspects:
When appropriate, activities may also address the definition of a secure knowledge sharing platform to enable the necessary data-transfer to obtain detailed operational performance information.
This topic implements the co-programmed European Partnership on ‘Zero Emission Waterborne Transport’ (ZEWT). As such, projects resulting from this topic will be expected to report on results to the European Partnership ‘Zero Emission Waterborne Transport’ (ZEWT) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 7 by the end of the project – see General Annex B.
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
The funding rate is 60% of the eligible costs, except for non-profit legal entities where the funding rate is up to 100% of the total eligible costs.
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
 
7. Specific conditions: described in the specific topic of the Work Programme
 
Documents
Call documents:
Standard application form — call-specific application form is available in the Submission System
Standard application form (HE RIA, IA)
Standard application form (HE RIA IA Stage 1)
Standard application form (HE CSA)
Standard application form (HE CSA Stage 1)
Standard evaluation form — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Standard evaluation form (HE CSA)
Standard evaluation form (HE RIA, IA and CSA Stage 1)
MGA
HE General MGA v1.0
HE Unit MGA v1.0
Call-specific instructions
Detailed budget table (HE LS)
Information on financial support to third parties (HE)
Additional documents:
HE Main Work Programme 2023–2024 – 1. General Introduction
HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2024 – 13. General Annexes
HE Programme Guide
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 3 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The Expected Outcomes and Scope introduce the issue by indicating that the topic will demonstrate battery storage systems interfaced to AC or DC distribution systems because, once integrated in the vessel, the battery will be interfaced to a distribution system that will be either DC or AC.
However, this doesn’t preclude the project from designing battery management systems of high voltage battery installations for AC and DC distribution systems, as the topic indicates the project has to address. Therefore there is no mistake in the text.
Read it on the EU portal ↗Answered 22 Feb 2024
The call requests market ready vessel design solutions. Market ready implies that it has been tested and is therefore ready to be used in real life conditions. For a TRL 7, a system prototype should be demonstrated in an operational environment. As in Horizon 2020, the OECD definitions regarding technological readiness levels (TRLs) should continue to be taken into account in the classification of technological research, product development and demonstration activities, and in the definition of types of action available in calls for proposals. These solutions should be tested for each one of the three vessel types mentioned in the calls.
Read it on the EU portal ↗Answered 18 Dec 2023
No, nothing in the topic description would fit this approach - it clearly refers to a Megawatt-level charging system addressing all related issues, and the proposed approach, among other things, would not allow some desired functions like doubling as a peak-time charger hub for up to 6 cars at the same time to be enabled.
When desired, battery swapping has already been explicitly mentioned in previous topics.
Read it on the EU portal ↗Answered 22 Nov 2023
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.