Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Official evaluation results the EU published for this call.
Funding cutoff score: 13. Every funded proposal scored at least this.
Projects the EU funded under this call, with the organisation that led each one.
ALL-DC-SHIPSScalable, Plug & Play and Modular DC Power Systems for low-emission Large Vessels
Led by The University of Birmingham · United Kingdom · 2025 · Official record ↗
STEESMATSmart Transformer for Enhanced Efficiency and Sustainability in Maritime Transportation
Led by Maritime Cleantech · Norway · 2025 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
D-NAVIODigital Ship: Mastering Complexity of the Waterborne Digital Transport through “Cloning of the Ship""""
HORIZON-CL5-2024-D6-01-10 · 2025 · Official record ↗
SHIP-AH2OYDevelopment and demonstration of zero-emission propulsion technology on board ships using green hydrogen from liquid organic hydrogen carrier in combination with fuel cells at MW-scale
HORIZON-CL5-2021-D5-01-08 · 2023 · Official record ↗
ZEASFerry demonstrator for the switch to safe use of sustainable climate neutral fuels in Adriatic - Zero Emission Adriatic Ship - ZEAS
HORIZON-CL5-2023-D5-01-12 · 2024 · Official record ↗
MARPOWEREfficient zero-emissions gas turbine POWER system for MARitime transport
HORIZON-CL5-2023-D5-01-11 · 2024 · Official record ↗
FLEXSHIPFlexible and modular large battery systems for safe on-board integration and operation of electric power, demonstrated in multiple type of ships
HORIZON-CL5-2022-D5-01-01 · 2023 · Official record ↗
NEMOSHIPNew modular Electrical architecture and digital platforM to Optimise large battery systems on SHIPs
HORIZON-CL5-2022-D5-01-01 · 2023 · Official record ↗
TwinShipTWINSHIP – INTEGRATED DIGITAL TWIN FRAMEWORK TO ENABLE GREEN SHIP OPERATIONS TOWARDS ZERO EMISSION VESSELS
HORIZON-CL5-2024-D5-01-15 · 2025 · Official record ↗
CirclesOfLifeEnhancing material CIRCularity and Lower Emissions of Ship building processes in all phases of the LIFE cycle
HORIZON-CL5-2023-D5-01-15 · 2024 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Notices the EU posted on this call, newest first. Open one to read the official text.
Call update: EVALUATION results
Published: 07/12/2022
Deadline: 18/04/2024
Available budget: EUR 202,050,000.00
The results of the evaluation for each topic are as follows:
Topic · D5-01-01 · D5-01-02 · D5-01-03 · D5-01-04 · D5-01-05 · D5-01-06
Number of proposals submitted (including proposals transferred from or to other calls) · 13 · 18 · 15 · 5 · 6 · 7
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 0 · 0 · 0 · 2
Number of above-threshold proposals · 9 · 11 · 11 · 3 · 3 · 3
Total budget requested for above-threshold proposals · 69,560,501.00 € · 59,867,451.00 € · 55,347,903.00 € · 24,633,842.00 € · 14,989,056.00 € · 29,658,668.00 €
Number of proposals retained for funding · 2 · 3 · 2 · 2 · 2 · 1
Number of proposals in the reserve list · 2 · 2 · 2 · 1 · 1 · 2
Funding threshold* · 12 · 12.5 · 12.5 · 13.5 · 12.5 · 13
Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 1 · 0 · 1 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 1 · 1 · 1 · 1 · 0 · 1
Number of proposals with scores lower than 13 and higher or equal to 10 · 8 · 9 · 10 · 1 · 2 · 2
Topic · D5-01-07 · D5-01-08 · D5-01-09 · D5-01-10 · D5-01-11 · D5-01-12
Number of proposals submitted (including proposals transferred from or to other calls) · 9 · 58 · 3 · 1 · 8 · 8
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 1 · 0 · 0 · 1
Number of above-threshold proposals · 7 · 44 · 2 · 1 · 7 · 6
Total budget requested for above-threshold proposals · 31,940,010.00 € · 213,597,966.00 € · 5,999,995.00 € · 16,233,889.00 € · 52,462,192.00 € · 44,576,235.00 €
Number of proposals retained for funding · 3 · 4 · 1 · 1 · 2 · 2
Number of proposals in the reserve list · 3 · 4 · 1 · 0 · 2 · 2
Funding threshold* · 12.5 · 14.5 · 10.5 · 13.5 · 13.5 · 12.5
· Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 9 · 0 · 0 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 2
The call for proposals HORIZON-CL5-2024-D5-01 closed on 18/04/2024. 196 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2024-D5-01-01 (IA): 13 proposals
HORIZON-CL5-2024-D5-01-02 (RIA): 18 proposals
HORIZON-CL5-2024-D5-01-03 (RIA): 15 proposals
HORIZON-CL5-2024-D5-01-04 (IA): 5 proposals
HORIZON-CL5-2024-D5-01-05 (RIA): 6 proposals
HORIZON-CL5-2024-D5-01-06 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-07 (RIA): 9 proposals
HORIZON-CL5-2024-D5-01-08 (RIA): 58 proposals
HORIZON-CL5-2024-D5-01-09 (RIA): 4 proposals
HORIZON-CL5-2024-D5-01-10 (RIA): 1 proposals
HORIZON-CL5-2024-D5-01-11 (RIA): 8 proposals
HORIZON-CL5-2024-D5-01-12 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-13 (IA): 7 proposals
HORIZON-CL5-2024-D5-01-14 (IA): 6 proposals
HORIZON-CL5-2024-D5-01-15 (IA): 11 proposals
HORIZON-CL5-2024-D5-01-16 (CSA): 3 proposals
HORIZON-CL5-2024-D5-01-17 (CSA): 1 proposal
HORIZON-CL5-2024-D5-01-18 (RIA): 13 proposals
The submission session is now available for: HORIZON-CL5-2024-D5-01-10(HORIZON-RIA), HORIZON-CL5-2024-D5-01-03(HORIZON-RIA), HORIZON-CL5-2024-D5-01-02(HORIZON-RIA), HORIZON-CL5-2024-D5-01-17(HORIZON-CSA), HORIZON-CL5-2024-D5-01-12(HORIZON-IA), HORIZON-CL5-2024-D5-01-14(HORIZON-IA), HORIZON-CL5-2024-D5-01-05(HORIZON-RIA), HORIZON-CL5-2024-D5-01-13(HORIZON-IA), HORIZON-CL5-2024-D5-01-01(HORIZON-IA), HORIZON-CL5-2024-D5-01-04(HORIZON-IA), HORIZON-CL5-2024-D5-01-08(HORIZON-RIA), HORIZON-CL5-2024-D5-01-11(HORIZON-RIA), HORIZON-CL5-2024-D5-01-06(HORIZON-IA), HORIZON-CL5-2024-D5-01-07(HORIZON-RIA), HORIZON-CL5-2024-D5-01-09(HORIZON-RIA), HORIZON-CL5-2024-D5-01-18(HORIZON-RIA), HORIZON-CL5-2024-D5-01-16(HORIZON-CSA), HORIZON-CL5-2024-D5-01-15(HORIZON-IA)
Project outputs and results are expected to contribute to the following expected outcomes:
Primary DC systems are now applied on multiple types of ships, employing battery energy storage. The application of DC grids on-board has already started and will grow significantly because of its promising aspects such as reduction of complexity, increased modularity and improved integration. However, further progress is required to unlock the full potential of an on-board DC grid for large ship applications (over 5000 GT) addressing the entire network for both primary and secondary (auxiliary) distribution system, taking into account the various on-board applications of ship's electrification systems (e.g. high-power fuel cells, batteries, etc.) The challenge is to focus not only on secondary distribution, but also on the integration/interconnection of new sustainable primary power systems within a DC grid network serving the entire ship
In order to address the above-mentioned challenge, proposals are expected to address all the following aspects:
All relevant stakeholders (electrical distribution and protection manufacturers, engineering companies, manufacturers of electrical equipment, users, shipyards, etc.) should participate in proposals in view of the systems development.
This topic implements the co-programmed European Partnership on ‘Zero Emission Waterborne Transport’ (ZEWT). As such, projects resulting from this topic will be expected to report on results to the European Partnership ‘Zero Emission Waterborne Transport’ (ZEWT) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B.
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
The funding rate is 60% of the eligible costs, except for non-profit legal entities where the funding rate is up to 100% of the total eligible costs.
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
 
7. Specific conditions: described in the specific topic of the Work Programme
 
Documents
Call documents:
Standard application form — call-specific application form is available in the Submission System
Standard application form (HE RIA, IA)
Standard application form (HE RIA IA Stage 1)
Standard application form (HE CSA)
Standard application form (HE CSA Stage 1)
Standard evaluation form — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Standard evaluation form (HE CSA)
Standard evaluation form (HE RIA, IA and CSA Stage 1)
MGA
HE General MGA v1.0
HE Unit MGA v1.0
Call-specific instructions
Detailed budget table (HE LS)
Information on financial support to third parties (HE)
Additional documents:
HE Main Work Programme 2023–2024 – 1. General Introduction
HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2024 – 13. General Annexes
HE Programme Guide
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 6 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
Yes, this is a valid range.
Read it on the EU portal ↗Answered 28 Nov 2023
The Expected Outcomes and Scope introduce the issue by indicating that the topic will demonstrate battery storage systems interfaced to AC or DC distribution systems because, once integrated in the vessel, the battery will be interfaced to a distribution system that will be either DC or AC.
However, this doesn’t preclude the project from designing battery management systems of high voltage battery installations for AC and DC distribution systems, as the topic indicates the project has to address. Therefore there is no mistake in the text.
Read it on the EU portal ↗Answered 22 Feb 2024
The topic focuses on large vessels of more than 5000 GT, in order to highlight the decarbonisation potential of those vessels (85% of international shipping). Power requirements also depend on the propulsion/hotel requirements of the type of vessel. While the topic focuses on vessels >5000 GT, any deviations can be, as usual, justified and explained.
Read it on the EU portal ↗Answered 28 Nov 2023
While TRL 6 is often performed at a representative conditions in the lab (test-center), TRL 7 and 8 usually involve system integration in a ship. The maturity of the proposed solutions defines the target TRL in different work packages. Commercial stakeholders will have at some point to consider the differences between requirements for different vessel categories and make the related investment decisions.
Read it on the EU portal ↗Answered 28 Nov 2023
Regarding the main focus of this topic (i.e. integration/interconnection of new sustainable primary power systems within a DC grid network serving the entire large ship (>5000 GT )), “the development of a prototype system at small scale (min. 100kW)” at final TRL 6-8, is the only possibility to be compatible with the proposed budget per proposal. In this sense, the expected solutions should show their applicability and scalability with power levels compatible with >5000 GT vessels. This is the meaning of “small scale”, with no upper limit explicitly defined. Please consider that the range of expected TRL is indicative and possible deviation in some WPs of the proposal can be justified.
Read it on the EU portal ↗Answered 28 Nov 2023
No, nothing in the topic description would fit this approach - it clearly refers to a Megawatt-level charging system addressing all related issues, and the proposed approach, among other things, would not allow some desired functions like doubling as a peak-time charger hub for up to 6 cars at the same time to be enabled.
When desired, battery swapping has already been explicitly mentioned in previous topics.
Read it on the EU portal ↗Answered 22 Nov 2023
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.