Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 17 October 2026.
This call is closed. These open or upcoming calls fund the closest work.
Official evaluation results the EU published for this call.
Funding cutoff score: 15. Every funded proposal scored at least this.
Projects the EU funded under this call, with the organisation that led each one.
TwinShipTWINSHIP – INTEGRATED DIGITAL TWIN FRAMEWORK TO ENABLE GREEN SHIP OPERATIONS TOWARDS ZERO EMISSION VESSELS
Led by Universitetet i Tromsoe - Norges Arktiske Universitet · Norway · 2025 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
D-NAVIODigital Ship: Mastering Complexity of the Waterborne Digital Transport through “Cloning of the Ship""""
HORIZON-CL5-2024-D6-01-10 · 2025 · Official record ↗
DISCOData-driven, Integrated, Syncromodal, Collaborative and Optimised urban freight meta model for a new generation of urban logistics and planning with data sharing at European Living Labs
HORIZON-CL5-2022-D6-02-02 · 2023 · Official record ↗
WILSONDistributed data modelling and Federated Digital Twinning for lifecycle data-driven sustainable operation and management of buildings and districts
HORIZON-CL5-2023-D4-02-01 · 2024 · Official record ↗
ROAD4SAFEPROACTIVE ROAD SAFETY RISK PREDICTION THROUGH MULTI-SOURCE AI AND BIG DATA TO ENABLE DATA-DRIVEN DECISIONS AND INTERVENTIONS
HORIZON-CL5-2026-01-D6-14 · 2026 · Official record ↗
eFTI-CONNECTFREIGHT TRANSPORT INFORMATION FOR COLLABORATIVE NETWORK - ACCELERATING INTEROPERABLE B2B AND B2A DIGITAL FREIGHT DATA EXCHANGE BEYOND EFTI COMPLIANCE
HORIZON-CL5-2026-01-D6-08 · 2026 · Official record ↗
SHIP-AH2OYDevelopment and demonstration of zero-emission propulsion technology on board ships using green hydrogen from liquid organic hydrogen carrier in combination with fuel cells at MW-scale
HORIZON-CL5-2021-D5-01-08 · 2023 · Official record ↗
TwinDMODEL-DRIVEN DIGITAL TWINS FOR RELIABLE AND AUTONOMOUS WIND OPERATION AND MAINTENANCE
HORIZON-CL5-2026-02-D3-07 · 2027 · Official record ↗
ENERGETICNEXT GENERATION BATTERY MANAGEMENT SYSTEM BASED ON DATA RICH DIGITAL TWIN
HORIZON-CL5-2022-D2-01-09 · 2023 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Notices the EU posted on this call, newest first. Open one to read the official text.
Call update: EVALUATION results
Published: 07/12/2022
Deadline: 18/04/2024
Available budget: EUR 202,050,000.00
The results of the evaluation for each topic are as follows:
Topic · D5-01-01 · D5-01-02 · D5-01-03 · D5-01-04 · D5-01-05 · D5-01-06
Number of proposals submitted (including proposals transferred from or to other calls) · 13 · 18 · 15 · 5 · 6 · 7
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 0 · 0 · 0 · 2
Number of above-threshold proposals · 9 · 11 · 11 · 3 · 3 · 3
Total budget requested for above-threshold proposals · 69,560,501.00 € · 59,867,451.00 € · 55,347,903.00 € · 24,633,842.00 € · 14,989,056.00 € · 29,658,668.00 €
Number of proposals retained for funding · 2 · 3 · 2 · 2 · 2 · 1
Number of proposals in the reserve list · 2 · 2 · 2 · 1 · 1 · 2
Funding threshold* · 12 · 12.5 · 12.5 · 13.5 · 12.5 · 13
Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 1 · 0 · 1 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 1 · 1 · 1 · 1 · 0 · 1
Number of proposals with scores lower than 13 and higher or equal to 10 · 8 · 9 · 10 · 1 · 2 · 2
Topic · D5-01-07 · D5-01-08 · D5-01-09 · D5-01-10 · D5-01-11 · D5-01-12
Number of proposals submitted (including proposals transferred from or to other calls) · 9 · 58 · 3 · 1 · 8 · 8
Number of inadmissible proposals · 0 · 0 · 0 · 0 · 0 · 0
Number of ineligible proposals · 0 · 0 · 1 · 0 · 0 · 1
Number of above-threshold proposals · 7 · 44 · 2 · 1 · 7 · 6
Total budget requested for above-threshold proposals · 31,940,010.00 € · 213,597,966.00 € · 5,999,995.00 € · 16,233,889.00 € · 52,462,192.00 € · 44,576,235.00 €
Number of proposals retained for funding · 3 · 4 · 1 · 1 · 2 · 2
Number of proposals in the reserve list · 3 · 4 · 1 · 0 · 2 · 2
Funding threshold* · 12.5 · 14.5 · 10.5 · 13.5 · 13.5 · 12.5
· Ranking distribution
Number of proposals with scores lower or equal to 15 and higher or equal to 14 · 0 · 9 · 0 · 0 · 1 · 0
Number of proposals with scores lower than 14 and higher or equal to 13 · 2
The call for proposals HORIZON-CL5-2024-D5-01 closed on 18/04/2024. 196 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2024-D5-01-01 (IA): 13 proposals
HORIZON-CL5-2024-D5-01-02 (RIA): 18 proposals
HORIZON-CL5-2024-D5-01-03 (RIA): 15 proposals
HORIZON-CL5-2024-D5-01-04 (IA): 5 proposals
HORIZON-CL5-2024-D5-01-05 (RIA): 6 proposals
HORIZON-CL5-2024-D5-01-06 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-07 (RIA): 9 proposals
HORIZON-CL5-2024-D5-01-08 (RIA): 58 proposals
HORIZON-CL5-2024-D5-01-09 (RIA): 4 proposals
HORIZON-CL5-2024-D5-01-10 (RIA): 1 proposals
HORIZON-CL5-2024-D5-01-11 (RIA): 8 proposals
HORIZON-CL5-2024-D5-01-12 (IA): 9 proposals
HORIZON-CL5-2024-D5-01-13 (IA): 7 proposals
HORIZON-CL5-2024-D5-01-14 (IA): 6 proposals
HORIZON-CL5-2024-D5-01-15 (IA): 11 proposals
HORIZON-CL5-2024-D5-01-16 (CSA): 3 proposals
HORIZON-CL5-2024-D5-01-17 (CSA): 1 proposal
HORIZON-CL5-2024-D5-01-18 (RIA): 13 proposals
The submission session is now available for: HORIZON-CL5-2024-D5-01-10(HORIZON-RIA), HORIZON-CL5-2024-D5-01-03(HORIZON-RIA), HORIZON-CL5-2024-D5-01-02(HORIZON-RIA), HORIZON-CL5-2024-D5-01-17(HORIZON-CSA), HORIZON-CL5-2024-D5-01-12(HORIZON-IA), HORIZON-CL5-2024-D5-01-14(HORIZON-IA), HORIZON-CL5-2024-D5-01-05(HORIZON-RIA), HORIZON-CL5-2024-D5-01-13(HORIZON-IA), HORIZON-CL5-2024-D5-01-01(HORIZON-IA), HORIZON-CL5-2024-D5-01-04(HORIZON-IA), HORIZON-CL5-2024-D5-01-08(HORIZON-RIA), HORIZON-CL5-2024-D5-01-11(HORIZON-RIA), HORIZON-CL5-2024-D5-01-06(HORIZON-IA), HORIZON-CL5-2024-D5-01-07(HORIZON-RIA), HORIZON-CL5-2024-D5-01-09(HORIZON-RIA), HORIZON-CL5-2024-D5-01-18(HORIZON-RIA), HORIZON-CL5-2024-D5-01-16(HORIZON-CSA), HORIZON-CL5-2024-D5-01-15(HORIZON-IA)
Project outputs and results are expected to contribute to the following expected outcomes:
State-of-the-art of Digital Twins (DT) applied to waterborne transport are typically characterised by a focus on specific limited aspects of the design or operation of a vessel based on numerical simulations. Integrated Green Vessel DTs, which take an integrated approach to combine design and operation to improve efficiency and reduce emissions are not well addressed. Furthermore, aspects of open (software) architecture, data standards, security guarantees and data sovereignty of data owners are also not comprehensively addressed. Whilst some advances in data integration for different applications have been made, a comprehensive global integration of data remains missing.
These higher levels of integration between different functions of an Integrated Green Vessel DT (e.g. during design and operation of waterborne transport assets) require both complex multi-physics simulations and advanced levels of data organisation. This leads to the need for higher computational efficiency to meet future requirements in terms of accuracy, and the integration of the digital representation of suitable technologies for the transformation of vessels into “Green Vessels” within an Integrated Green DT that will aim to improve the vessels environmental performance.
Integrated Green Vessel DTs need to be applicable throughout the life cycle of the vessel, from initial design, to detailed design, engineering and production, operation, retrofitting, and circular end of life. To make best use of an Integrated Green Vessel DT, it should allow addressing optimisation for enhanced energy efficiency and reduced environmental footprint in a consistent way throughout the lifecycle of the vessel. This will require a thorough consideration of potential operational conditions as well as possible future regulatory changes. The Green Vessel DT will play a key role in design and operation of future zero or low emission vessels as well as their through-life sustainability upgrades. Mapping all relevant data influencing operational environmental performance, it will be the basis for decision support for operational (AI-based) optimisation, for considering the use of for example propulsion changes, retrofits, alternative fuel options, use of renewable energies solutions) and predictive maintenance.
Proposals are expected to address all of the following aspects:
Plan for the exploitation and dissemination of results should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used.
This topic implements the co-programmed European Partnership on ‘Zero Emission Waterborne Transport’ (ZEWT). As such, projects resulting from this topic will be expected to report on results to the European Partnership ‘Zero Emission Waterborne Transport’ (ZEWT) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.
1. Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
2. Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
3. Other eligibility conditions: described in Annex B of the Work Programme General Annexes
4. Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
6. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
 
7. Specific conditions: described in the specific topic of the Work Programme
 
Documents
Call documents:
Standard application form — call-specific application form is available in the Submission System
Standard application form (HE RIA, IA)
Standard application form (HE RIA IA Stage 1)
Standard application form (HE CSA)
Standard application form (HE CSA Stage 1)
Standard evaluation form — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Standard evaluation form (HE CSA)
Standard evaluation form (HE RIA, IA and CSA Stage 1)
MGA
HE General MGA v1.0
HE Unit MGA v1.0
Call-specific instructions
Detailed budget table (HE LS)
Information on financial support to third parties (HE)
Additional documents:
HE Main Work Programme 2023–2024 – 1. General Introduction
HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2024 – 13. General Annexes
HE Programme Guide
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 2 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The Expected Outcomes and Scope introduce the issue by indicating that the topic will demonstrate battery storage systems interfaced to AC or DC distribution systems because, once integrated in the vessel, the battery will be interfaced to a distribution system that will be either DC or AC.
However, this doesn’t preclude the project from designing battery management systems of high voltage battery installations for AC and DC distribution systems, as the topic indicates the project has to address. Therefore there is no mistake in the text.
Read it on the EU portal ↗Answered 22 Feb 2024
No, nothing in the topic description would fit this approach - it clearly refers to a Megawatt-level charging system addressing all related issues, and the proposed approach, among other things, would not allow some desired functions like doubling as a peak-time charger hub for up to 6 cars at the same time to be enabled.
When desired, battery swapping has already been explicitly mentioned in previous topics.
Read it on the EU portal ↗Answered 22 Nov 2023
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-10-17
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.