Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Projects the EU funded under this call, with the organisation that led each one.
TIESTransforming Hydropower: Integrating Flexibility, Ecosystem Health, and Societal Needs
Led by Technische Universitaet Wien · Austria · 2026 · Official record ↗
HydroPulseHydropower for Participatory Upscaling of Local Solutions and Ecosystem-based strategies
Led by Ethnicon Metsovion Polytechnion · Greece · 2026 · Official record ↗
SE-HYDROSocially and Environmentally harmonized HYDRopower Operations
Led by Ethnicon Metsovion Polytechnion · Greece · 2026 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
iAMP-Hydrointelligent Asset Management Platform for Hydropower operation and maintenance
HORIZON-CL5-2022-D3-03-08 · 2023 · Official record ↗
SENSEISOCIETAL-READY SAFE AND TRANSPARENT HUMAN-TECHNOLOGY INTERACTIONS FOR THE AUTOMATED MOBILITY ECOSYSTEM
HORIZON-CL5-2025-04-D6-12 · 2026 · Official record ↗
GLocalFlexA Global as well as Local Flexibility Marketplace to Demonstrate Grid Balancing Mechanisms through Cross-sectoral Interconnected and Integrated Energy Ecosystems enabling Automatic Flexibility Trading
HORIZON-CL5-2022-D3-01-12 · 2023 · Official record ↗
All4SRAlliance for Societal Readiness
HORIZON-CL5-2026-01-D2-09 · 2026 · Official record ↗
PEGASUSPILOTING EUROPEAN GREEN AIR MOBILITY AND SERVICES FOR URBAN SOCIETAL READINESS
HORIZON-CL5-2025-04-D6-11 · 2026 · Official record ↗
STORE2HYDRONovel long-term electricity storage technologies for flexible hydropower
HORIZON-CL5-2023-D3-01-13 · 2024 · Official record ↗
D-HYDROFLEXDigital solutions for improving the sustainability performance and FLEXibility potential of HYDROpower assets
HORIZON-CL5-2022-D3-03-08 · 2023 · Official record ↗
CBE4IClean bioenergy for industry - Novel fuel flexible highly efficient and close-to-zero emission combined biomass gasification and combustion technology for industrial applications
HORIZON-CL5-2022-D3-03-06 · 2023 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Expected Outcome:For a renewables-based electricity system sufficiently flexible and also in the long-run highly sustainable hydropower capacity is pivotal.
Project results are expected to contribute to some of the following expected outcomes, to the benefit of hydropower operators and technology providers:
Scope:Proposals are expected to develop hydropower technology solutions or improved water management schemes or a combination of both, which allow for synergies between flexible hydropower energy generation and local ecosystem management for existing run-of-river hydropower or reservoir hydropower plants or cascades of such plants, which are connected to the grid. To achieve this objective, thematic areas like e.g., hydropeaking, floodplain biotopes, sediment transport and/or river morphology restoration and environmentally efficient water flows also considering effects of climate change, can be addressed. Societal needs and the participation of local communities in decision processes in view of trust building should be considered.
Developed solutions are expected to enhance the flexibility of hydropower generation according to current and expected power grid needs and water availability, while being highly sustainable and creating positive impacts on river ecosystems and biodiversity, through e.g., equipment, material and digital innovation, nature-inclusive design, ecosystem restoration solutions, innovative and sustainable reservoir and water flow operation and management. Developed solution should not reduce the hydropower generation efficiency and equipment functionality while improving the environmental performances arising from this in a win-win optimisation. Respective impacts for both, energy and biodiversity should be assessed. Research and Innovation on pumped storage hydropower as well as on water management schemes not related to hydropower or not directly connected to natural water bodies is excluded from this topic.
This topic is a Societal-Readiness pilot:
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System. The page limit of the application is extended by two pages to 52 to properly address Societal Readiness-related issues.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025). [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA) - The page limit of the application is extended by two pages to 52 to properly address Societal Readiness-related issues.
Guidance
HE Programme Guide
Model Grant Agreements (MGA)
Lump Sum MGA 
Call-specific instructions 
Detailed budget table (HE LS) 
Guidance: "Lump sums - what do I need to know?"
Additional documents:
HE Main Work Programme 2025 – 1. General Introduction
HE Main Work Programme 2025 – 8. Climate, Energy and Mobility
HE Main Work Programme 2025 – 14. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement 
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 10 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The sufficient / appropriate expertise is to be determined by the project team; experience in RRI is of course very welcome. profiles with experience in addressing social and cultural perspectives, methodological knowledge to e.g., conduct and analyse interviews, design, and lead co-creation, facilitate inclusion, or otherwise meaningfully support the consideration of and responsiveness to societal needs and concerns should be included.
Read it on the EU portal ↗Answered 1 Aug 2025
Instructions related to the Societal Readiness pilot are accurately detailed in the last part of the main introduction of Cluster 5 work programme 2025. They should be strictly respected and considered as an extension of the topic text. Societal Readiness should be transversally integrated in the proposal, meaning that related activities should be incorporated across the various work packages of the project (or as a transversal work package connected to the others), and should not be confined to an isolated task.
Read it on the EU portal ↗Answered 21 Aug 2025
The text under the section 1.2 Methodology is expected to outline how the project will be developed to enhance Societal Readiness (SR) all along its duration, demonstrating the uptake of the Responsible Research and Innovation questions (see specific instructions in main introduction of Cluster 5 work programme 2025). References to SSH activities requested under section 1.2 Methodology of the standard Application Form remain valid: they should aim at achieving Societal Readiness goals. SR and SSH are therefore fully correlated.
Read it on the EU portal ↗Answered 24 Jun 2025
There are no official guidelines to that respect. SR aspects and activities should be considered in the proposal’s risk management along with other relevant and/or critical aspects of the proposal, in relation to the topic requirements.
Read it on the EU portal ↗Answered 10 Jun 2025
« Societal actors » refer to individuals, organizations, or groups that are directly or indirectly affected by, involved in, or have a stake in the development, implementation, or outcomes of the technology: End-users or consumers, community groups, policymakers, industry representatives (e.g. services providers), researchers and experts, civil society organizations etc.
They can play a role either as associated partners, or external stakeholders, and participate, be engaged and/or involved depending on the project’s needs.
Read it on the EU portal ↗Answered 20 Aug 2025
This topic is a RIA and activities are expected to achieve TRL 4-5 by the end of the project. The location of activities is up to the proposal to chose according to the requirements of the topic.
Read it on the EU portal ↗Answered 15 Jun 2025
In scope are only solutions for existing run-of-river hydropower, reservoir hydropower plants or cascades of such pants.
Besides that there is no restriction on hydropower technologies, besides the exclusion of innovation on pumped storage hydropower and hydropower not directly connected to natural water bodies.
Read it on the EU portal ↗Answered 10 Jun 2025
Water management schemes refers to managing water resources effectively, in respect of e.g. controlling water movement, efficient and sustainable water use. Exemplary thematic areas are listed in the topic.
Read it on the EU portal ↗Answered 10 Jun 2025
The project can include validation of the technology in the relevant environment, in line with TRL 5, however this is not mandatory according to the topic text and the TRL expected, which is TRL4-5. It is up to the proposal to define the specific project outline in respect of methodology and tools used in line with expected outcome and scope.
Read it on the EU portal ↗Answered 30 May 2025
Read it on the EU portal ↗Answered 14 May 2026
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.