Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Based on projects the EU funded on the same subject in this programme.
Fuels-CAn integrated platform of novel cost and energy-efficient conversion technologies producing liquid and gaseous bioFUELS from sustainable biogenic residues validated for direct use in fuel Cells
HORIZON-CL5-2023-D3-02-07 · 2024 · Official record ↗
SUN-to-LIQUID IISUNlight-to-LIQUID - Efficient solar thermochemical synthesis of liquid hydrocarbon fuels using tailored porous-structured materials and heat recuperation
HORIZON-CL5-2022-D3-03-07 · 2023 · Official record ↗
FUEL-UPProduction of advanced bioFUELS via pyrolysis and UPgrading of 100% biogenic residues for aviation and marine sector, including full valorisation of side streams
HORIZON-CL5-2023-D3-01-06 · 2024 · Official record ↗
VALWARPValue Chains for Delocalized Wet feedstockstoAdvanced BioFuels integrating Renewable Fuels of Non Biological Origin Pathways
HORIZON-CL5-2026-02-D3-02 · 2027 · Official record ↗
SUSTEPSSUSTAINABLE, SECURE AND COMPETITIVE ENERGY THROUGH SCALING UP ADVANCED BIOFUEL GENERATION
HORIZON-CL5-2022-D3-03-02 · 2023 · Official record ↗
BUTTERFLYBiomass Utilized To The Extended portfolio of Renewable Fuels with Large Yields
HORIZON-CL5-2022-D3-02-08 · 2023 · Official record ↗
SUN-PERFORMSUN-PERFORM: Synthetic biology United with Nanotechnology – A Biohybrid Approach to Improve Light-harvesting and CO2 Fixation for High Performance Sustainable Solar Fuel Production
HORIZON-CL5-2024-D3-01-04 · 2024 · Official record ↗
IsoPROPELCARBON-NEUTRAL PRODUCTION AND DIRECT FUEL-CELL DEPLOYMENT OF ISOPROPANOL AS ENERGY CARRIER
HORIZON-CL5-2024-D3-02-02 · 2025 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
A quite wide portfolio of technologies, which are close to be deployed but still lack the real-world demonstration of economic viability, exists. Significant volumes of advanced biofuels and renewable fuels of non-biological origin (RFNBOs) are needed to cover the current fleets and the sectors where renewable fuels are the main long-term solution, such as aviation and shipping and energy-intensive industries. Therefore, an exceptional effort is needed to establish more successful projects where full-scale plants are built and operated based on the vast potential of sustainable feedstocks throughout the EU.
Project results are expected to contribute to all of the following expected outcomes:
Demonstrate innovative large-scale production of liquid advanced biofuels and/or renewable fuels of non-biological origin for sectors with specific need for such fuels (particularly aviation and shipping and energy-intensive industries). Production is expected to be based on various EU sustainable biomass feedstocks, notably biogenic residues and wastes, biogenic part of slurries and industrial wastes, and/or on non-biological origin feedstocks, such as renewable hydrogen and CO2 or renewable carbon, nitrogen, or their compounds, through chemical, biochemical, biological, and thermochemical pathways, or a combination of them. Proposals are expected to:
Projects should produce a lifetime cycle analysis of their production route and in particular for renewable fuels of non-biological origin, as inputs in terms of renewable energy and material (CO2, nitrogen, renewable hydrogen) may not be continuously available.
Production of renewable hydrogen as an end-product is excluded from the scope of this topic.
The projects are expected to result in reference cases for ready-to-build, revamp/reuse and/or operate full-scale plants of advanced biofuels and/or renewable fuels of non-biological origin. Improvements, optimisation, new schemes and modification of existing demonstration plants that can result into the preparation of the next full-scale plant are considered within scope to encourage deployment of cost-effective solutions.
The plan for the exploitation and dissemination of results should include a strong investment and business case and sound exploitation strategy. The exploitation plan should include plans for scalability, commercialisation, and deployment. It is expected to provide information and assessment about the economic viability of the commercial plant, the permitting procedures, a full value chain-based business plan and identified funding sources such as private equity, loans, loans guarantee, grants, or public financing for CAPEX and OPEX, as well as take-off agreements for the fuel uptake. Moreover, they should provide information on, or linked to, the identified funding sources, like private equity, the InvestEU, the EU Catalyst Partnership, the Innovation Fund, and possibly the European Regional Development Fund programmes. Projects are expected to include at least one relevant local economic business case, outlining local value and supply chains and the expected number of local jobs at the place of deployment. Furthermore, proposals are expected to provide information and assessment of impact on land and water use, soil and biodiversity, for example in relation to marginal and degraded land feedstocks, and of public awareness on full-scale renewable fuel plants.
An assessment of the sustainability and the GHG reduction from fossil equivalents should be shown based on a life-cycle analysis for the large-scale fuel production. Special attention should be paid to estimating the GHG emissions reduction potential; projects are encouraged to use the methodology in the Innovation Fund.
null
Activities are expected to achieve TRL 7-8 by the end of the project – see General Annex B. Activities may start at any TRL.
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
To ensure a balanced portfolio, grants will be awarded to proposals not only in order of ranking but at least also to one proposal that is the highest ranked within the area of liquid advanced biofuels and at least also to one proposal that is the highest ranked within the area of liquid renewable fuels of non-biological origin, provided that proposals attain all thresholds (and subject to available budget). This condition to ensure a balanced portfolio will also be considered to be met if a proposal addressing both areas is funded.
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
described in Annex G of the Work Programme General Annexes.
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
HE MGA 
Call-specific instructions 
Additional documents:
HE Main Work Programme 2025 – 1. General Introduction
HE Main Work Programme 2025 – 8. Climate, Energy and Mobility
HE Main Work Programme 2025 – 14. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment 
EU Grants AGA — Annotated Model Grant Agreement 
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Applicants asked the EU 5 questions about this call and the EU published the answers. They clarify the call documents but do not replace them.
The topic under scope states “Demonstrate innovative large-scale production of liquid advanced biofuels and/or renewable fuels of non-biological origin”. So it should be at least one type of renewable fuel chosen.
Read it on the EU portal ↗Answered 20 Nov 2025
Sustainable biomass feedstock includes energy crops only if these are grown on marginal and degraded lands or as intermediate crops for production of sustainable aviation biofuels, in compliance with the revised Renewable Energy Directive and relevant delegated act. Furthermore, the topic requires to address and assess the impact of such actual and real size feedstocks on the plant design and expects production of liquid advanced biofuels to be based on various EU sustainable biomass feedstocks.
Read it on the EU portal ↗Answered 28 Oct 2025
It is expected to provide information and assessment about the take-off agreements for the fuel uptake.
Read it on the EU portal ↗Answered 4 Jun 2025
The topic covers a large variety of technologies and types of fuels, each having a different scale for technology proof. Therefore, the definition of large-scale demonstration is relative to the technology pathway and the produced fuel type, thus the level of the large-scale demonstration should be sufficient for proving the chosen technology free of technological risks before further scale up for economic feasibility verification previous to commercialization.
Read it on the EU portal ↗Answered 11 Jan 2026
The answer clearly states that the origin of CO2 is not part of the definition of RFNBOs under the Renewable Energy Directive, only the origin of energy counts and this should be renewable.
Read it on the EU portal ↗Answered 23 Oct 2025
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.