Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Based on projects the EU funded on the same subject in this programme.
LtALighter Than Aire Hydrogen Valley
HORIZON-JU-CLEANH2-2025-06-01 · 2026 · Official record ↗
PYRAH2Pyrolytic Renewable Approach for Hydrogen and Carbon Production: Efficient Transformation of Biogenic Wastes into Hydrogen and High-Value Solid Carbon for New Industrial Value Chains
HORIZON-JU-CLEANH2-2025-01-06 · 2026 · Official record ↗
HiWhyVHigh Coast to West Coast Hydrogen Valley
HORIZON-JU-CLEANH2-2025-06-01 · 2026 · Official record ↗
FlHyPortsFlemish Hydrogen Ports Valley
HORIZON-JU-CLEANH2-2025-06-02 · 2026 · Official record ↗
PermittHyTraining Permitting Staff in Hydrogen Techologies
HORIZON-JU-CLEANH2-2025-05-03 · 2026 · Official record ↗
CRYOSTARCertification Roadmap to Yield an Optimal and Safety methodology of crashworthiness for an integrated cryogenic Tank for liquid hydrogen storAge on board of future aiRcraft
HORIZON-JU-CLEAN-AVIATION-2025-03-FTA-02 · 2025 · Official record ↗
CAVENDISHConsortium for the AdVent of aero-Engine Demonstration and aircraft Integration Strategy with Hydrogen
HORIZON-JU-CLEAN-AVIATION-2022-01-HPA-01 · 2023 · Official record ↗
H2SCOREHydrogen Storage and Fuel Cells for Optimised Renewable Energy Communities
HORIZON-JU-CLEANH2-2025-04-01 · 2025 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
Facing a period of climate emergency and energy crisis, Europe needs to rethink the energy market with solutions based on renewable sources capable of directly generating renewable fuels. Hydrogen is a valuable energy carrier and an important feedstock for industry, but its production still relies almost exclusively on fossil fuels. The conversion of solar energy into chemicals such as hydrogen is expected to grow in importance as a sustainable energy resource. Especially, thermo-chemical cycles (TCC) or photoelectrochemical/photocatalytic (PEC/PC) water splitting using sunlight represent eco-friendly and promising technologies to produce hydrogen with the possibility to have standalone systems for delocalised production not necessarily connected to the power grid.
To date, thermochemical and photo-assisted solar-driven technologies are still in the proof-of-concept stage and face challenges in improving solar-to-hydrogen conversion efficiency to make solar-based hydrogen production competitive. Additionally, R&D in materials should aim to discover novel abundant and cost-effective catalysts and redox materials as well as more integrated process design promises in the respective fields. Development of TCC or PEC/PC reactors is essential along with overcoming challenges related to the efficiency, stability and scalability.
TCC processes use high-temperature solar heat to drive redox reactions that decompose water into hydrogen and oxygen through a series of chemical steps. These cycles typically involve metal oxides or non-metal oxides or other chemicals that undergo reversible oxidation and reduction, enabling the splitting of water. Although several materials and cycle configurations have demonstrated feasibility at kW scale, the technology remains at an early stage of development, with key challenges related to redox material stability, reaction kinetics, and efficient heat integration. Experimental systems have shown proof-of-concept operation under concentrated solar flux, but current solar-to-hydrogen efficiencies and long-term durability need significant improvement to meet industrial targets.
PEC/PC processes utilise light energy (in some cases in combination with electric energy) to drive chemical reactions, particularly for the production of hydrogen from water. This method is regarded as environmentally friendly and holds promise for generating hydrogen with standalone systems that do not require connection to the power grid. The conversion of solar energy into chemicals such as hydrogen is anticipated to grow in relevance as a sustainable energy resource. For instance, PEC water splitting systems are anticipated to play a significant role in renewable hydrogen production, with the goal of competing in the medium to long term with conventional systems that combine separate photovoltaic (PV) panels and electrolysis units. Innovative PEC technologies can support CAPEX and OPEX reduction efforts compared to electrolyser development and thereby can help boost the market competitiveness of renewable hydrogen.
The results are expected to contribute to all the following outcomes:
The project will contribute to strengthen European leadership for the efficient hydrogen production and create new business models for hydrogen production based on TCC and PEC/PC technologies.
Project results are expected to contribute to the following objectives and KPIs of the Clean Hydrogen JU SRIA for both routes (TCC and PEC/PC) unless otherwise stated[1] :
For PEC/PC route, conventional systems that combine separate photovoltaic (PV) panels and electrolysis units are excluded from the scope of this topic.
This topic seeks innovations in solar thermos-chemical cycles (TCC) and solar Photoelectrochemical/Photocatalytic (PEC/PC), with a strong emphasis on system-level integration (subcomponents: materials, devices, reactors, control systems, etc. into a fully functional, operable system), targeting demonstration at TRL 5, and aligning with EU climate neutrality and energy resilience goals. Proposals should focus on the direct conversion of solar energy into hydrogen, eliminating reliance on intermediate photovoltaic-to-electricity pathways.
Past and current projects supported by the Clean Hydrogen Partnership have established the current technological challenges to overcome for direct solar process generating hydrogen[6],[7],[8],[9]. Therefore, the success of all processes under consideration (TCC and PEC/PC) is strongly linked to the performance of the core components and their interaction. Especially high efficiencies and throughput are required to provide a clear economically competitive scaling and implementation perspective. Innovative solutions including the material, reactor and process level shall be revisited and developed to tackle these significant challenges. The main levers to overcome the efficiency challenges are seen in the following areas: application of advantageous active materials, structures and shapes with better material usage, improved photon and heat management, improved transport processes and heat recovery, as well as co-production of further products besides hydrogen (heat, electricity, other chemical products). A further key for a deployment of such a technology is a convincing pathway for the scaling of the technology. As such, proposals should provide and demonstrate a clear scale-up strategy for the receiver/reactors to substantiate the claim for competitive solutions at 250-500 kW scale for the TCC route and at minimum 10 kW for the PEC/PC route, while considering critical materials and other sustainability issues.
Proposals should make use of already available solar resource harvesting techniques that convincingly demonstrate the promise of commercial application. Possible integration with existing grids (transport, energy, materials) is very important to address the potential application of the proposed technology in future steps. In line with this, proposals can consider including hydrogen intermediate- and end-users or prosumers (on site generation/use as a chemical feedstock or fuel) to demonstrate successful business cases, making efficient use of existing infrastructure and technologies.[10],[11],[12],[13]
Proposals should aim to conduct extensive research and development on the core functional materials of the targeted processes, i.e. redox materials for TCC or light-absorbing and catalytic materials for PEC/PC, as well as innovative reactor and balance of system designs, to produce hydrogen directly from water using solar irradiation in non-concentrated, moderately or highly concentrated form.
Another relevant aspect to consider is the operation of the systems under transient solar irradiation conditions, which may require control strategies or thermal storage elements to ensure process stability and efficiency. Such transient conditions not only demand appropriate control strategies or thermal storage elements to ensure process stability and efficiency but also negatively impact on the lifetime of components, e.g. by accelerating materials degradation. Therefore, adapted suitable operational strategies are needed to deal with intermittency of solar radiation.
The topic should cover the following elements:
Proposals should cover the following elements addressing the described challenges in TCC and PEC/PC processes to advance the technology to achieve at least TRL 5: system performance, reactor development and material development, all supported by a solid business case. This should be validated by developing, building, and testing dedicated reactor units and peripherals to achieve the performance characteristics given in the section Expected Results.
The intended project should consider or even use results and experiences from relevant ongoing or past JU projects such as but not only HYDROSOL-Beyond[14], HySelect[8], FLOWPHOTOCHEM[16] and PH2OTOGEN[11].
Proposals may be developed in accordance with the results of relevant past and ongoing projects funded by the EU, including the HYDROSOL family[18] (HYDROSOL-beyond[14], HYDROSOL-II[20], HYDROSOL-Plant[12]), SOL2HY2[9], PECSYS[23], and PH2OTOGEN[11], among others (e.g. Sun-to-Liquid [25],and NanoPEC[26]) with the objective of ensuring complementarity and clear added value in comparison with the current state-of-the-art.
For additional elements applicable to all topics please refer to section 2.2.3.2.
Activities are expected to start at TRL 3 and achieve TRL 5 by the end of the project - see General Annex B.
The JU estimates that an EU contribution of maximum EUR 3.00 million would allow these outcomes to be addressed appropriately.
Technology Readiness Level - Technology readiness level expected from completed projects
Activities are expected to start at TRL 3 and achieve TRL 5 by the end of the project - see General Annex B.
[1] In the currently available version of the Clean Hydrogen JU SRIA, there are KPIs and objectives for the TCC route for hydrogen production but not yet for the PEC/PC routes.
[2] KPI-1: Boundary conditions: location with direct normal irradiation (DNI) of 2500 kWh/m2/year. Output of hydrogen meeting ISO 14687-2 at a pressure of 15 bar and hydrogen purity 5.0.
[3] KPI-2: System capital cost for a specific hydrogen production rate based on kg of hydrogen generated per day at a given cumulative DNI per year. Capital cost should include all the cost related to all the equipment necessary for the normal operation of the plant.
[4] KPI-3: O&M cost averaged over the first 10 years of the system. Routine maintenance and "wear and tear" (rotating parts, cleaning of equipment, etc). Electricity costs for operation of auxiliary units included. System level losses such as heliostat collector area losses, replacement parts, operation, and maintenance are included in the cost calculations.
[5] S. Haussener et al. Energy & Fuels 2024 38 (13), 12058-12077
[6] https://cordis.europa.eu/project/id/303435
[7] https://cordis.europa.eu/project/id/621252
[8] https://cordis.europa.eu/project/id/101101498
[9] https://cordis.europa.eu/project/id/325320
[10] https://cordis.europa.eu/project/id/245224
[11] https://cordis.europa.eu/project/id/101137889
[12] https://cordis.europa.eu/project/id/325361
[13] https://cordis.europa.eu/project/id/621173
[14] https://cordis.europa.eu/project/id/826379
[15] https://cordis.europa.eu/project/id/101101498
[16] https://cordis.europa.eu/project/id/862453
[17] https://cordis.europa.eu/project/id/101137889
[18] HYDROSOL, HYDROSOL-II, HYDROSOL-Plant (FP6–H2020, Grant 826379, 20030, 325361) – Series of projects on solar thermochemical hydrogen production via redox cycles, progressively scaling from lab to pilot plant.
[19] https://cordis.europa.eu/project/id/826379
[20] https://cordis.europa.eu/project/id/20030
[21] https://cordis.europa.eu/project/id/325361
[22] https://cordis.europa.eu/project/id/325320
[23] https://cordis.europa.eu/project/id/735218
[24] https://cordis.europa.eu/project/id/101137889
[25] https://cordis.europa.eu/project/id/654408
[26] https://cordis.europa.eu/project/id/227179
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
Page limit for Innovation Actions: For all Innovation Actions the page limit of the applications are 70 pages.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
Additional eligibility condition: Maximum contribution per topic
For some topics, in line with the Clean Hydrogen JU SRIA, an additional eligibility criterion has been introduced to limit the Clean Hydrogen JU requested contribution mostly for actions performed at high TRL level, including demonstration in real operational environment and with important involvement from industrial stakeholders and/or end users such as public authorities. Such actions are expected to leverage co-funding as commitment from stakeholders. It is of added value that such leverage is shown through the private investment in these specific topics. Therefore, proposals requesting contributions above the amounts specified per each topic below will not be evaluated
Additional eligibility condition: Membership to Hydrogen Europe / Hydrogen Europe Research
For the topics listed below, in line with the Clean Hydrogen JU SRIA, an additional an additional eligibility criterion has been introduced to ensure that one partner in the consortium is a member of either Hydrogen Europe or Hydrogen Europe Research. This concerns topics targeting actions for large-scale demonstrations, flagship projects and strategic research actions, where the industrial and research partners of the Clean Hydrogen JU are considered to play a key role in accelerating the commercialisation of hydrogen technologies by being closely linked to the Clean Hydrogen JU constituency, which could further ensure full alignment with the SRIA of the JU. This approach shall also ensure the continuity of the work performed within projects funded through the H2020 and FP7, by building up on their experience and consolidating the EU value-chain. In the Call 2026 this applies to: development and demonstration of flexible and standardised hydrogen storage systems and demonstration and operation of reversible solid oxide cell systems operation for local grid-connected hydrogen production and utilisation. This will also apply to the Hydrogen Valleys (flagship) topics as they are considered of strategic importance for the European Union ambitions to double the number of Hydrogen Valleys by 2025 as well as to the more recent European Commission’s inspirational target to have at least 50 Hydrogen Valleys under construction or operational by 2030 across the entire EU. For the Hydrogen Valleys topics a large amount of co-investment/co-funding of project participants/beneficiaries including national and regional programmes is expected.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
STEP (Sovereignty) Seal
For the Hydrogen Valleys topics, as shown below, STEP Seal (so called “Sovereignty Seal” under the STEP Regulation) will be awarded to proposals exceeding all of the evaluation thresholds set out in this Annual Work Programme. The STEP Seal is a label, which aims to increase the visibility of quality projects available for funding and help attract alternative and cumulative funding for quality projects, and simultaneously to provide a potential project pipeline for regional and national programmes.
STEP (Sovereignty) Seal is applicable to the following topics:
6. Legal and financial set-up of the grants
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
In addition to the standard provisions, the following specific provisions in the model grant agreement will apply:
1. Lump Sum
This year’s call for proposals will take the form of lump sums as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021- 2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025)[2].
Lump sums will be used across all topics in the Call 2026.
[2] DECISION authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) ls-decision_he_en.pdf (europa.eu)
2. Full capitalised costs for purchases of equipment, infrastructure or other assets purchased specifically for the action
For some topics, in line with the Clean Hydrogen JU SRIA, mostly large-scale demonstrators or flagship projects specific equipment, infrastructure or other assets purchased specifically for the action (or developed as part of the action tasks) can exceptionally be declared as full capitalised costs. This concerns the topics below:
3. Subcontracting
For all topics: an additional obligation regarding subcontracting has been introduced, namely that subcontracted work may only be performed in target countries set out in the call conditions.
The beneficiaries must ensure that the subcontracted work is performed in the countries set out in the call conditions.
The target countries are all Member States of the European Union and all Associated Countries.
4. Intellectual Property Rights (IPR), background and results, access rights and rights of use (article 16 and Annex 5 of the Model Grant Agreement (MGA))
An additional information obligation has been introduced for topics including standardisation activities: ‘Beneficiaries must, up to 4 years after the end of the action, inform the granting authority if the results could reasonably be expected to contribute to European or international standards’. These concerns the topics below:
described in the chapter 2.2.3.2 of the Clean Hydrogen JU 2026 Annual Work Programme
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Application form - Part B (HE CleanH2 RIA, IA)
Application form - Part B (HE CleanH2 CSA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Standard evaluation form (HE CSA)
Guidance
HE Programme Guide
Model Grant Agreements (MGA)
Lump Sum MGA
Call-specific instructions
Detailed budget table (HE LS) 
Clean Hydrogen JU - Annual Work Programme 2026 (AWP 2026)
 AWP 2026
Clean Hydrogen JU - Strategic Research and Innovation Agenda (SRIA) 
SRIA Clean Hydrogen JU
Lump Sums Guidance
Guidance: "Lump sums - what do I need to know?"
Comprehensive information on lump sum funding in Horizon Europe 
FAQ on Call HORIZON-JU-CLEANH2-2026
FAQ Document
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.