Loading page...
Loading page...
This round is closed. The next round and similar open calls are listed below. Synced from the EU Funding & Tenders Portal on 9 November 2026.
This call is closed. These open or upcoming calls fund the closest work.
Projects the EU funded under this call, with the organisation that led each one.
NEXTAIRNEXT generation of Aircraft operatIons suppoRted by AI
Led by Nextant Applications & Innovative Solution SRL · Italy · 2026 · Official record ↗
ZEUSZero/low Emission Aircraft Integration into Future European Air Traffic System
Led by Centro de Referencia Investigacion Desarrollo e Innovacion Atm, A.i.e. · Spain · 2026 · Official record ↗
ZENITIAZero-Emission Next-Gen Innovation and Technology Integration for Aviation
Led by Universidad Carlos Iii de Madrid · Spain · 2026 · Official record ↗
INGERAINTEGRATION OF THE NEXT GENERATION REGIONAL AIRCRAFT INTO ATM FOR ZERO/LOW EMISSION AVIATION
Led by Aristotelio Panepistimio Thessalonikis · Greece · 2026 · Official record ↗
Based on projects the EU funded on the same subject in this programme.
NEXT-QCMTOWARDS EXPLAINABLE QUANTUM AI SOLUTIONS FOR NEXT -GENERATION TRAJECTORY OPTIMISATION
HORIZON-SESAR-2025-DES-ER-03-WA1-3 · 2026 · Official record ↗
NATICANext-Generation ATS Platform for Innovative, Climate-Conscious, and Secure Air Traffic Management
HORIZON-SESAR-2025-DES-IR-02-WA3-1 · 2026 · Official record ↗
CICONIA METCICONIA MET is designing additional meteorological and climate services for aviation stakeholders, based on advanced aircraft sensing and connectivity.
HORIZON-SESAR-2025-DES-IR-02-WA2-1 · 2026 · Official record ↗
E-CONTRAILArtificial Neural Networks for the Prediction of Contrails and Aviation Induced Cloudiness
HORIZON-SESAR-2022-DES-ER-01-WA1-6 · 2023 · Official record ↗
DYN-MAXDYNAMIC AIRCRAFT ENERGY MANAGEMENT IN ATC-COMPLEX ENVIRONMENTS
HORIZON-SESAR-2025-DES-IR-02-WA5-3 · 2026 · Official record ↗
STEPLESSStepless High-Lift Configurations for Optimised Aircraft Energy Management in the TMA
HORIZON-SESAR-2023-DES-ER2-WA2-3 · 2024 · Official record ↗
NOMADNext-Gen Service Oriented Modular ATM Development for Enroute & TMA
HORIZON-SESAR-2025-DES-IR-02-WA3-1 · 2026 · Official record ↗
DYN-MARSDYNamic Management of Aircraft Configuration and Route Structures
HORIZON-SESAR-2022-DES-IR-01-WA2-1 · 2023 · Official record ↗
Each one links to its EU funding record and the partners it works with: a starting list for building a consortium.
To significantly advance the following development priority:
1. Integration of the next generation aircraft for zero/low emission aviation
The future vision of air transport without net carbon emissions supporting the Green Deal goal includes the introduction of hydrogen (combustion and/or hydrogen fuel-cells), battery-electric and hybrid-electric powered aircraft. These aircraft are currently in the development phase, and their entry into service is not expected until the next decade. Once operations start, their numbers are expected to increase rapidly, which is why the ATM Master Plan sets an objective to ensure that the ATM system is ready to fully integrate them from the start. The goal is that these operations can take place safely, efficiently and without a disproportional impact on conventional (i.e., current generation of kerosene-powered aircraft) air traffic operations.
It is anticipated that these new aircraft will present challenges to ATM in the following areas:
This analysis must take into consideration the different aircraft type / models and propulsive systems under development. The objective of the research is to collect requirements for the seamless integration of the new models / propulsive systems in European airspace, and where appropriate provide recommendations for ATM developments (potentially proposing roadmap if appropriate), addressing, for example:
Research also includes the definition of a potential future scenario(s) representative of future demand for 2035 including:
Oher future scenarios could address a longer-term vision (e.g., 2040+ (SMR H2), 2045+ (Long-range aircraft (LR)) combined with more innovative Phase D ATM operational concepts.
Research shall evaluate the impact on performance such as the reduction of the CO2 emissions, the environmental impact of H2 and water (contrails) from hydrogen-powered fuel cell systems on at fleet scale, etc considering the scenarios defined above. Research may also address the impact on other relevant key performance areas (KPA) such as capacity, access and equity, etc.
Research shall identify the needs for the adaptation of the regulatory framework for air navigation and aerodromes (including new requirements, means of compliance) and the related safety standards.
The research shall consider the work performed under the AZEA initiative (i.e., CONOPS) and the Clean Aviation Joint Undertaking programme, and coordinate as necessary with EASA to ensure that safety concerns have been sufficiently addressed.
1. Admissibility Conditions
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
This call is subject to restrictions for the protection of European communication networks.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
The award criteria are described in subsection 1.4 of the BAWP 2024-2025.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
The evaluation committee may be composed partially of representatives of EU institutions and agencies (internal experts).
To ensure a balanced portfolio, grants will be awarded to applications not only in order of ranking but at least also to those that are the highest ranked within topics within the same work area, provided that the application attains the threshold.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
described in Annex G of the Work Programme General Annexes.
The following exceptions apply.
1) Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025).
2) Beneficiaries will be subject to the following additional dissemination obligations:
3) Beneficiaries will be subject to the following additional exploitation obligations:
For the purpose of complying with the objectives set in Council Regulation (EU) 2021/2085, the SRIA and the European ATM Master Plan,
Beneficiaries must acknowledge these obligations and incorporate them into the proposal, outlining the efforts they will make to meet them, and into Annex I to the grant agreement.
The maximum project duration is 30 months, including a 6-month period at the end of the project life cycle to undertake communications, dissemination and exploitation activities in relation to the research results.
Call documents:
SESAR 3 Joint Undertaking Bi-Annual Work Programme (BAWP) 2024-2025 - Annex III
Application form templates
Standard application form (HE RIA, IA) - please note that only Part A of this template is applicable for this call. For Part B, see below.
SESAR 3 application form (RIA, IA) - Part B - this application form specific for this call is available in the Submission System
Detailed budget table (HE LS)
Evaluation form templates
Standard evaluation form (HE RIA, IA) - will be used with the necessary adaptations based on specific award criteria (see BAWP, Annex III, section 1.4).
Guidance
HE Programme Guide 
Model Grant Agreements (MGA)
Lump Sum MGA 
Call-specific instructions 
Guidance: "Lump sums - what do I need to know?"
Additional documents:
SESAR 3 Joint Undertaking Multi-Annual Work Programme (MAWP) 2022-2031
SESAR 3 Project Handbook
SESAR 3 Q&A Document
HE Main Work Programme 2023–2025 – 1. General Introduction
HE Main Work Programme 2023–2025 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2025 – 12. Missions
HE Main Work Programme 2023–2025 – 13. General Annexes
Council Regulation 2021/2085 of 19 November 2021 establishing the Joint Undertakings under Horizon Europe (SBA)
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764 
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment 
EU Grants AGA — Annotated Model Grant Agreement 
Funding & Tenders Portal Online Manual 
Funding & Tenders Portal Terms and Conditions 
Funding & Tenders Portal Privacy Statement
Confirm the current call documents and submission conditions with the funding authority.
View on EU portal ↗Source: EU Funding & Tenders Portal · synced 2026-11-09
A free account keeps your shortlist and sends deadline reminders. The EUACC connector brings this call, its FAQs, past winners and similar calls into Claude or ChatGPT, so you can check fit and draft with sources.